← Back
BuildNYC
Over six families without stores
299 STOCKHOLM STREET
BROOKLYN · BIN 3430392
💬 Discuss this project
2024Year Built
4.5Stories
C1Building Class
R6Zoning
7,692 sfGross Floor Area
8Units
0 Active ViolationsFDNY Report ↗
Over six families without stores · Owner of record: Slava 7 CP · 2,500 sf lot · 3.08 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof11p · 1 filing · 20 docs
Bulkhead2p · 1 filing · 20 docs
Penthouse19p · 1 filing · 20 docs
Floor 413p · 1 filing · 20 docs
Floor 315p · 1 filing · 20 docs
Floor 2
Floor 113p · 1 filing · 20 docs
Cellar14p · 1 filing · 20 docs
Site & exteriorHeavy duty sidewalk shed installation12p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Slava 7 CP403/21/2026
112 Otis Schaefer203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/15/2022$495K—SLAVA 7 LLC → SLAVA 7 CP LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SH Engineering2210/26/2026
CNY Engineering401/22/2026
MSM Engineering Services302/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CNY Engineering803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Case PlumbingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SH Engineering70242110/26/2026
MB Inspections8703207/24/2025
Building Lifecycle
10/26/2026
Filed — New Building
This application is filed for a new 4 story 8 family building.
B00944935-A8
08/03/2026
Filed — New Building
This application is filed for a new 4 story 8 family building.
B00944935-A7
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahriar Rafi
08/03/2026
Special inspection requirement — Lighting controls
Shahriar Rafi
08/03/2026
Special inspection requirement — Maintenance information
Shahriar Rafi
105 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offS & L Plumbing02/10/2026
1 project · most recent 10/26/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
10/26/2026Permit IssuedL&L Construction DevelopmentHeating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 10/26/2026
Storm Water/Sanitary
FiledStatusContractorScope
10/26/2026Signed-offS & L PlumbingStorm, Water/Sanitary
2 projects · most recent 11/07/2024
General Wiring
FiledStatusContractorScope
11/07/2024CompleteRichard Neu—
10/11/2024CompleteKJK ElectricGeneral Wiring
1 project · most recent 10/26/2026
Steel Concrete Masonry
FiledStatusContractorScope
10/26/2026Signed-offS & L PlumbingSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/26/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/12/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/03/2026Exterior lighting powerShahriar Rafienergy_progress
08/03/2026Fenestration air leakageShahriar Rafienergy_progress
08/03/2026Lighting controlsShahriar Rafienergy_progress
08/03/2026Lighting in dwelling unitsShahriar Rafienergy_progress
08/03/2026MeteringShahriar Rafienergy_progress
08/03/2026Protection of exposed foundation insulationShahriar Rafienergy_progress
08/03/2026Interior lighting powerShahriar Rafienergy_progress
08/03/2026Maintenance informationShahriar Rafienergy_progress
08/03/2026Fenestration and door U-factor and product ratingsShahriar Rafienergy_progress
08/03/2026Air barrier - visual inspectionShahriar Rafienergy_progress
08/03/2026Electrical motors and elevatorsShahriar Rafienergy_progress
08/03/2026Fenestration areasShahriar Rafienergy_progress
08/03/2026Insulation placement and R valuesShahriar Rafienergy_progress
08/03/2026PreliminaryShahriar Rafiprogress
08/03/2026Fire-Resistance Rated ConstructionShahriar Rafiprogress
08/03/2026Energy Code Compliance InspectionsShahriar Rafiprogress
08/03/2026Wall Panels, Curtain Walls, and VeneersShahriar Rafispecial
08/03/2026Mastic and Intumescent Fire-resistant CoatingsShahriar Rafispecial
08/03/2026Fire-Resistant Penetrations and JointsShahriar Rafispecial
08/03/2026Construction Operations Influencing Adjacent StructuresShahriar Rafispecial
08/03/2026Combustible Exterior Wall CoveringsShahriar Rafispecial
07/16/2026Air barrier - visual inspectionShahriar Rafienergy_progress
07/16/2026Wall Panels, Curtain Walls, and VeneersShahriar Rafispecial
07/16/2026Construction Operations Influencing Adjacent StructuresShahriar Rafispecial
07/16/2026Fire-Resistant Penetrations and JointsShahriar Rafispecial
Latest 25 of 150.
188 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account