← Back
Over six families without stores
299 TROUTMAN STREET
BROOKLYN · BIN 3072379
💬 Discuss this project
1960Year Built
4Stories
C1Building Class
R6Zoning
6,500 sfGross Floor Area
8Units
Rent Stabilized110 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: SZA FIVE STARS REALTY, LLC · 2,500 sf lot · 2.6 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Roof1p · 1 filing · 16 docs
Floor 42p · 3 filings · 20 docs
Floor 32p · 3 filings · 20 docs
Floor 22p · 3 filings · 20 docs
Floor 12p · 3 filings · 20 docs
Cellar4p · 3 filings · 20 docs
1 job · most recent 08/05/2025
General Wiring
FiledStatusContractorScope
08/05/2025CompleteADAM ELECL CONTRNG LLCGeneral Wiring
Building Lifecycle
All (108)Filed (7)Permit Issued (7)Signed Off (3)Violation (60)Inspection (4)Objection (6)Special Inspection (21)
07/18/2025
Signed off — Alteration
B00856949-I1
07/16/2025
Signed off — Alteration
PLUMBING WORK FOR INTERIOR RENOVATION THROUGHOUT.
B00885173-I1
06/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
06/10/2025
Filed — Alteration
PLUMBING WORK FOR INTERIOR RENOVATION THROUGHOUT.
B00885173-P2
06/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
03/28/2025
Filed — Alteration
PLUMBING WORK FOR INTERIOR RENOVATION THROUGHOUT.
B00885173-P1
02/19/2025
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
02/04/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/12/2024
Violation issued (ECB, open)
Construction
07/26/2024
Permit issued — General Construction
B00856949-I1-GC
07/23/2024
Permit issued — Plumbing
B00885173-I1-PL
04/05/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/20/2024
Signed off — Alteration
ALTERATION FILED FOR EXISTING STAIR REPAIR/REPLACE AS PER PLAN.
B00929161-I1
02/08/2024
Permit issued — Plumbing
B00885173-I1-PL
10/31/2023
Permit issued — Structural
B00929161-I1-ST
10/03/2023
Violation issued (HPD, open)
C
10/03/2023
Violation issued (HPD, open)
B
10/03/2023
Violation issued (HPD, closed)
B
10/03/2023
Violation issued (HPD, open)
A
10/03/2023
Violation issued (HPD, open)
C
10/03/2023
Violation issued (HPD, open)
A
10/03/2023
Violation issued (HPD, closed)
B
10/03/2023
Violation issued (HPD, closed)
B
10/03/2023
Violation issued (HPD, open)
B
10/03/2023
Violation issued (HPD, open)
B
10/03/2023
Violation issued (HPD, open)
B
10/03/2023
Violation issued (HPD, open)
A
09/22/2023
Objection resolved — Addressed
09/18/2023
Objection raised — Scope
09/15/2023
Permit issued — Plumbing
B00885173-I1-PL
09/14/2023
Filed — Alteration
ALTERATION FILED FOR EXISTING STAIR REPAIR/REPLACE AS PER PLAN.
B00929161-I1
09/05/2023
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
09/05/2023
Special inspection requirement — Structural Steel - High Strength Bolting
NARI MOTWANI
09/05/2023
Special inspection requirement — Structural Steel - Welding
NARI MOTWANI
09/05/2023
Special inspection requirement — Structural Cold-Formed Steel
NARI MOTWANI
09/05/2023
Special inspection requirement — Structural Steel - Details
NARI MOTWANI
07/21/2023
Objection resolved — Addressed
07/21/2023
Objection resolved — Addressed
07/12/2023
Permit issued — General Construction
B00856949-I1-GC
07/06/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
FARHAD BASSIRI-TEHRANI
07/06/2023
Special inspection requirement — Air barrier - visual inspection
FARHAD BASSIRI-TEHRANI
07/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
07/06/2023
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
07/06/2023
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
07/06/2023
Special inspection requirement — Fenestration areas
FARHAD BASSIRI-TEHRANI
07/06/2023
Special inspection requirement — Fenestration air leakage
FARHAD BASSIRI-TEHRANI
07/05/2023
Filed — Alteration
B00856949-P1
07/03/2023
Special inspection requirement — Fenestration air leakage
FARHAD BASSIRI-TEHRANI
07/03/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
FARHAD BASSIRI-TEHRANI
07/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
07/03/2023
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
07/03/2023
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
07/03/2023
Special inspection requirement — Fenestration areas
FARHAD BASSIRI-TEHRANI
07/03/2023
Special inspection requirement — Air barrier - visual inspection
FARHAD BASSIRI-TEHRANI
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/27/2023
Objection raised — Mechanical
06/27/2023
Objection raised — Admin
06/26/2023
Filed — Alteration
PLUMBING WORK FOR INTERIOR RENOVATION THROUGHOUT.
B00885173-I1
Latest 60 of 108 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SZA FIVE STARS REALTY1303/22/2026
AKHTAR CONSTRUCTION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI606/10/2025
ALBERTO ROMAN111/06/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGH QUALITY 338203/21/2026
ARCHVISION DESIGN STUDIO103/21/2026
HIGHRISE GROUP503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AKHTAR CONSTRUCTION CO INGeneral Contractor407/08/2026
JOE MIDDLETONElectrical203/21/2026
HORBRIDGE PLUMBING & HEATINGPlumbing207/08/2026
ADAM ELECL CONTRNG LLCElectrical103/22/2026
M & M PIPING AND HEATINGPlumbing107/08/2026
SO PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394506/10/2025
NS ENGINEERING & CONSULTI3652109/14/2023
AR-TECH ENGINEERING, P.C.6659111/06/2019
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAKHTAR CONSTRUCTION CO IN07/26/2024
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING07/23/2024
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT02/08/2024
DOB NOWStructuralSigned-offAKHTAR CONSTRUCTION CO IN10/31/2023
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT09/15/2023
DOB NOWGeneral ConstructionSigned-offAKHTAR CONSTRUCTION CO IN07/12/2023
DOB NOWPlumbingPermit IssuedNICHOLAS SUIDA11/07/2019
BISOTISSUEDHIGH QUALITY CONSTRUCTION07/09/2020
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/19/2025Fail-Final PL - Up to 9 Requested FloorsFailView ↗
02/04/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/05/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
06/18/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
06/09/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
09/05/2023FinalFARHAD BASSIRI-TEHRANIprogress
09/05/2023Structural Steel - High Strength BoltingNARI MOTWANIspecial
09/05/2023Structural Steel - WeldingNARI MOTWANIspecial
09/05/2023Structural Cold-Formed SteelNARI MOTWANIspecial
09/05/2023Structural Steel - DetailsNARI MOTWANIspecial
07/06/2023Fenestration and door U-factor and product ratingsFARHAD BASSIRI-TEHRANIenergy_progress
07/06/2023Air barrier - visual inspectionFARHAD BASSIRI-TEHRANIenergy_progress
07/06/2023Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
07/06/2023FinalFARHAD BASSIRI-TEHRANIprogress
07/06/2023Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
07/06/2023Fenestration areasFARHAD BASSIRI-TEHRANIenergy_progress
07/06/2023Fenestration air leakageFARHAD BASSIRI-TEHRANIenergy_progress
07/03/2023Fenestration air leakageFARHAD BASSIRI-TEHRANIenergy_progress
07/03/2023Fenestration and door U-factor and product ratingsFARHAD BASSIRI-TEHRANIenergy_progress
07/03/2023Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
07/03/2023FinalFARHAD BASSIRI-TEHRANIprogress
07/03/2023Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
07/03/2023Fenestration areasFARHAD BASSIRI-TEHRANIenergy_progress
07/03/2023Air barrier - visual inspectionFARHAD BASSIRI-TEHRANIenergy_progress
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/27/2026B00885173-I1Request digital key ↗
08/27/2026B00885173-P1Request digital key ↗
08/27/2026B00885173-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00259045-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
11/07/2019322001677Open ↗
▸BISWORK PERMIT APPLICATION1
11/07/2019322001677Open ↗
▸Seals & Professional Certifications23
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B00856949-I1Open ↗
08/29/2026B00885173-P2Open ↗
08/28/2026B00856949-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026B00885173-P2Open ↗
08/27/2026B00885173-I1Open ↗
08/27/2026B00885173-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B00856949-I1Open ↗
09/01/2026B00856949-I1Open ↗
08/28/2026B00856949-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/07/2019322001677Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/07/2019322001677Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/07/2019322001677Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/27/2026B00885173-I1Open ↗
08/27/2026B00885173-P1Open ↗
08/27/2026B00885173-P2Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/07/2019322001677Open ↗
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/27/2026B00856949-I1Open ↗
08/13/2026B00885173-I1Open ↗
08/13/2026B00885173-P2Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
11/07/2019322001677Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
11/12/2019322001677Open ↗
▸Other Documents6
▸DOB NOWHPD4: CONH Pilot Program6
08/27/2026B00856949-I1Open ↗
08/13/2026B00856949-P1Open ↗
08/13/2026B00885173-I1Open ↗
Showing 3 of 6 on file for this type