ECB10/10/2024OBSERVED AT EXTERIOR OF THE BUILDING NEW ELECTRICAL WORK IS DONE. NEW JUNCTION BOXES INSTALLED AND NEW WIRING IN THE STOOPS AND IN THE BRICK FENCE. NO PERMIT FOR THIS WORK AT THE TIME OF INSPECTION., OBTAIN ALL$6K due
ECB10/10/2024OBSERVED AT EXTERIOR BRICK STEPS GOING TO THE SECOND FLOOR DO NOT HAVE HAND RAILING ON BOTH SIDES CREATING UNSAFE CONDITIONS., REPAIR AND/OR REPLACE; INSTALL HAND RAILING$3K due
DOB09/20/2017REPAIR DEFECTIVE DRIVEWAY WITHIN TWO MONTHS BEFORE WINTER SEASON
Primarily 2 family with 1 store or office · 0.76 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.