← Back
Two family brick
3-09 BEACH 91 STREET
QUEENS · BIN 4435838
💬 Discuss this project
1930Year Built
2.5Stories
B1Building Class
R4-1Zoning
2,048 sfGross Floor Area
2Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Two family brick · Owner of record: LIBERTY KG LLC · 4,418 sf lot · 0.46 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralCivil
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZMIROT LLC1903/22/2026
HPD403/22/2026
REVISED INC803/22/2026
309 BEACH 91 TRUST INC103/22/2026
U S BANK TRUST NATIONAL A203/22/2026
309 BEACH 91 STREET, INC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/07/2026$1.2M—— → —$586/sf building
07/23/2024$315K—— → —$154/sf building
06/01/2022$692K—Private party → U.S. BANK TRUST NATIONAL ASSOCIATION$338/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN506/30/2025
BGM ENGINEERING109/03/2024
ASR ENGINEERING PC111/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ABC PERMIT EXPEDITING203/21/2026
EXPEDIA BUILDING SOLUTION103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
26 BONIM LLCGeneral Contractor603/21/2026
G.N. CONSTRUCTION INCGeneral Contractor203/21/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519606/30/2025
Building Lifecycle
All (118)Filed (7)Permit Issued (5)Signed Off (3)Violation (47)Inspection (6)Objection (20)Special Inspection (30)
02/20/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/27/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/26/2025
Violation issued (HPD, open)
I
07/01/2025
Special inspection requirement — Permanent certificate
Younes Abouyaala
07/01/2025
Special inspection requirement — Fenestration areas
Younes Abouyaala
07/01/2025
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
07/01/2025
Special inspection requirement — Interior lighting power
Younes Abouyaala
07/01/2025
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
07/01/2025
Special inspection requirement — Electric vehicle service equipment requirements
Younes Abouyaala
07/01/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
07/01/2025
Special inspection requirement — Final
NAVEEN KUMAR
07/01/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
07/01/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
07/01/2025
Special inspection requirement — Metering
Younes Abouyaala
07/01/2025
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
06/30/2025
Filed — Alteration CO
Existing one family dwelling unit to be renovated and converted into a two family dwelling unit. New drywall partitions and plumbing fixtures as per plans.
Q01101592-P2
06/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
06/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
06/30/2025
Special inspection requirement — Final
NAVEEN KUMAR
06/30/2025
Special inspection requirement — Metering
Younes Abouyaala
06/30/2025
Special inspection requirement — Interior lighting power
Younes Abouyaala
06/30/2025
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
06/30/2025
Special inspection requirement — Fenestration areas
Younes Abouyaala
06/30/2025
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
06/30/2025
Special inspection requirement — Electric vehicle service equipment requirements
Younes Abouyaala
06/30/2025
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
06/30/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
06/30/2025
Special inspection requirement — Permanent certificate
Younes Abouyaala
06/25/2025
Signed off — Alteration
installation of new plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling. Filed in conjunction with ALT CO application #Q01101592-I1
Q01145521-I1
06/18/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/19/2025
Signed off — Alteration
INSTALLATION OF PLYWOOD CONSTRUCTION FENCE TO ENCLOSE PROPERTY. NO CHANGES TO USES, EGRESS OR OCCUPACY.
Q08034331-I1
04/22/2025
Signed off — Alteration
Q01102884-I1
04/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/12/2025
Filed — Alteration CO
Existing one family dwelling unit to be renovated and converted into a two family dwelling unit. New drywall partitions and plumbing fixtures as per plans.
Q01101592-P1
02/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
02/15/2025
Special inspection requirement — Final
NAVEEN KUMAR
02/15/2025
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
02/15/2025
Special inspection requirement — Interior lighting power
Younes Abouyaala
02/15/2025
Special inspection requirement — Metering
Younes Abouyaala
02/15/2025
Special inspection requirement — Permanent certificate
Younes Abouyaala
01/08/2025
Filed — Alteration
installation of new plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling. Filed in conjunction with ALT CO application #Q01101592-I1
Q01145521-P1
01/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/11/2024
Permit issued — Plumbing
Q01145521-I1-PL
11/21/2024
Filed — Alteration
installation of new plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling. Filed in conjunction with ALT CO application #Q01101592-I1
Q01145521-I1
11/18/2024
Permit issued — General Construction
Q01102884-I1-GC
11/18/2024
Permit issued — Structural
Q01101592-I1-GC-CX
10/25/2024
Objection resolved — Addressed
10/13/2024
Objection resolved — Addressed
10/13/2024
Objection resolved — Addressed
10/13/2024
Objection resolved — Addressed
10/13/2024
Objection resolved — Addressed
09/21/2024
Objection resolved — Addressed
09/21/2024
Objection resolved — Addressed
09/21/2024
Objection resolved — Addressed
09/20/2024
Objection resolved — Addressed
09/20/2024
Objection resolved — Addressed
09/18/2024
Objection raised — Zoning
09/18/2024
Objection raised — Current Topo verification requ
09/18/2024
Objection raised — Mechanical
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPLBG P & H INC12/11/2024
DOB NOWGeneral ConstructionSigned-off26 BONIM11/18/2024
DOB NOWStructuralPermit Issued26 BONIM11/18/2024
DOB NOWConstruction FenceSigned-off26 BONIM07/24/2024
DOB NOWConstruction FenceSigned-offEMPIRE CONSTRUCTION ASSOC01/27/2023
1 project · most recent 11/25/2024
General Wiring
FiledStatusContractorScope
11/25/2024CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 06/30/2025
Wood
FiledStatusContractorScope
06/30/2025Permit Issued26 BONIM LLCWood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/20/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/27/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
07/01/2025Permanent certificateYounes Abouyaalaenergy_progress
07/01/2025Fenestration areasYounes Abouyaalaenergy_progress
07/01/2025Insulation placement and R valuesYounes Abouyaalaenergy_progress
07/01/2025Interior lighting powerYounes Abouyaalaenergy_progress
07/01/2025Fenestration air leakageYounes Abouyaalaenergy_progress
07/01/2025Electric vehicle service equipment requirementsYounes Abouyaalaenergy_progress
07/01/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
07/01/2025FinalNAVEEN KUMARprogress
07/01/2025Maintenance informationYounes Abouyaalaenergy_progress
07/01/2025Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
07/01/2025MeteringYounes Abouyaalaenergy_progress
07/01/2025Air barrier - visual inspectionYounes Abouyaalaenergy_progress
06/30/2025Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
06/30/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
06/30/2025FinalNAVEEN KUMARprogress
06/30/2025MeteringYounes Abouyaalaenergy_progress
06/30/2025Interior lighting powerYounes Abouyaalaenergy_progress
06/30/2025Air barrier - visual inspectionYounes Abouyaalaenergy_progress
06/30/2025Fenestration areasYounes Abouyaalaenergy_progress
06/30/2025Insulation placement and R valuesYounes Abouyaalaenergy_progress
06/30/2025Electric vehicle service equipment requirementsYounes Abouyaalaenergy_progress
06/30/2025Fenestration air leakageYounes Abouyaalaenergy_progress
06/30/2025Maintenance informationYounes Abouyaalaenergy_progress
06/30/2025Permanent certificateYounes Abouyaalaenergy_progress
02/15/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
Latest 25 of 48.
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026Q08034331-I1Request digital key ↗
08/21/2026Q01102884-I1Request digital key ↗
08/21/2026Q01145521-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026Q01101592-I1Open ↗
08/13/2026Q01101592-P2Open ↗
08/13/2026Q01101592-P1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026Q01145521-I1Open ↗
09/02/2026Q01145521-I1Open ↗
09/01/2026Q01101592-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026Q08034331-I1Open ↗
08/21/2026Q01102884-I1Open ↗
08/21/2026Q01145521-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026Q01145521-I1Open ↗
09/01/2026Q01101592-P1Open ↗
08/27/2026Q01101592-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/19/2026Q01101592-P1Open ↗
08/19/2026Q01101592-P2Open ↗
08/15/2026Q01101592-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/21/2026Q01145521-P1Open ↗
08/21/2026Q01145521-I1Open ↗
08/19/2026Q01101592-P2Open ↗
Showing 3 of 5 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/19/2026Q01101592-P1Open ↗
08/19/2026Q01101592-P2Open ↗
08/15/2026Q01101592-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01101592-I1Open ↗