ECB11/16/2013FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER RE: INSTALLATIONOF PLUMBING MATERIAL.AT 1ST FLOOR GAS HOT WATER HEATER GAS CONNECTION IS A RUBBER HOSE. GAS NEEDS TO BE CONNECTED WITH RIDGED PIPE FROM VALVNothing owed — awaiting certificate of correction
One family attached or semi-detached · 0.53 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.