← Back
Two stories - detached, small or mid-size
3-20 PARSONS BOULEVARD
QUEENS · BIN 4101227
💬 Discuss this project
1940Year Built
2.5Stories
A1Building Class
R1-2Zoning
1,840 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,000 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
Architecture
Floor 215p · 1 filing · 20 docs
Floor 115p · 1 filing · 20 docs
Cellar15p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/12/2022$1.3M—— → —$707/sf building
05/15/2019$1.1M—MARY S. SCHOEN 2014 TRUST → Private party$598/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GESTURE INK ARCHITECTURE612/16/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S M EXPEDITING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EXO INDUSTRIES CORPGeneral Contractor104/09/2026
ADVANCED PLUMBING MECHPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AM DESIGN STUDIO LLC4413612/16/2025
Building Lifecycle
All (32)Filed (6)Permit Issued (2)Inspection (4)Special Inspection (20)
12/16/2025
Filed — Alteration
INTERIOR AND EXTERIOR ALTERATION OF EXISTING ONE FAMILY HOME INCLUDING MINOR PARTITION CHANGES, UPDATING OF FINISHES, FIXTURES, WINDOWS, DOORS, ROOFING MATERIAL AND CONSTRUCTION OF MASONRY STAIRCASES AND RELATED MECHANICAL WORK AS PER PLANS.
Q08013628-P1
12/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ALLENDE MATOS
12/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
ALLENDE MATOS
12/16/2025
Special inspection requirement — Permanent certificate
MEL SARKOR-CLINTON
12/16/2025
Special inspection requirement — Concrete - Cast-In-Place
ALLENDE MATOS
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALLENDE MATOS
12/16/2025
Special inspection requirement — Masonry
ALLENDE MATOS
12/16/2025
Special inspection requirement — Mechanical Systems
ALLENDE MATOS
12/16/2025
Special inspection requirement — Energy Code Compliance Inspections
ALLENDE MATOS
12/16/2025
Special inspection requirement — Final
MEL SARKOR-CLINTON
12/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
ALLENDE MATOS
12/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
ALLENDE MATOS
12/16/2025
Special inspection requirement — Interior lighting power
ALLENDE MATOS
12/16/2025
Special inspection requirement — Electric vehicle service equipment requirements
ALLENDE MATOS
12/16/2025
Special inspection requirement — Maintenance information
MEL SARKOR-CLINTON
12/16/2025
Special inspection requirement — Insulation placement and R values
ALLENDE MATOS
12/16/2025
Special inspection requirement — Fenestration air leakage
ALLENDE MATOS
10/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALLENDE MATOS
10/06/2023
Filed — Alteration
PLUMBING WORK IN EXISTING 1 FAMILY HOME. NO CHANGE IN USE, OCCUPANCY OR EGRESS. INDIRECT HOT WATER STORAGE TANK HEATED BY END USE (1)BOILER IN CELLAR. GAS END USES:CELLAR(1)BOILER,(1)DRYER.1ST FLOOR:(1)STOVE, REMOVE AND CAP EXISTING (1) GENERATOR AT OSP.
Q08014435-P3
10/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALLENDE MATOS
06/07/2023
Filed — Alteration
PLUMBING WORK IN EXISTING 1 FAMILY HOME. NO CHANGE IN USE, OCCUPANCY OR EGRESS. INDIRECT HOT WATER STORAGE TANK HEATED BY END USE (1)BOILER IN CELLAR. GAS END USES:CELLAR(1)BOILER,(1)DRYER.1ST FLOOR:(1)STOVE, REMOVE AND CAP EXISTING (1) GENERATOR AT OSP.
Q08014435-P2
06/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALLENDE MATOS
04/04/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/02/2023
Filed — Alteration
PLUMBING WORK IN EXISTING 1 FAMILY HOME. NO CHANGE IN USE, OCCUPANCY OR EGRESS. INDIRECT HOT WATER STORAGE TANK HEATED BY END USE (1)BOILER IN CELLAR. GAS END USES:CELLAR(1)BOILER,(1)DRYER.1ST FLOOR:(1)STOVE, REMOVE AND CAP EXISTING (1) GENERATOR AT OSP.
Q08014435-P1
02/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALLENDE MATOS
02/01/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/19/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/07/2022
Permit issued — Plumbing
Q08014435-I1-PL
11/14/2022
Filed — Alteration
PLUMBING WORK IN EXISTING 1 FAMILY HOME. NO CHANGE IN USE, OCCUPANCY OR EGRESS. INDIRECT HOT WATER STORAGE TANK HEATED BY END USE (1)BOILER IN CELLAR. GAS END USES:CELLAR(1)BOILER,(1)DRYER.1ST FLOOR:(1)STOVE, REMOVE AND CAP EXISTING (1) GENERATOR AT OSP.
Q08014435-I1
10/22/2022
Permit issued — General Construction
Q08013628-I1-GC-CX
10/09/2022
Filed — Alteration
INTERIOR AND EXTERIOR ALTERATION OF EXISTING ONE FAMILY HOME INCLUDING MINOR PARTITION CHANGES, UPDATING OF FINISHES, FIXTURES, WINDOWS, DOORS, ROOFING MATERIAL AND CONSTRUCTION OF MASONRY STAIRCASES AND RELATED MECHANICAL WORK AS PER PLANS.
Q08013628-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offADVANCED PLUMBING MECH12/07/2022
DOB NOWGeneral ConstructionPermit IssuedEXO INDUSTRIES CORP10/22/2022
BISOTISSUEDD.D.S. MECHANICAL PLUMB11/02/2018
BISPLISSUEDD.D.S. MECH PBG&HTG CORP11/02/2018
1 project · most recent 12/16/2025
Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
12/16/2025Permit IssuedEXO INDUSTRIES CORPAir Conditioning Systems, Associated Ducts and Piping
Cooling
Amana Amana - ASX160241F , ASPT33C14B 2 tons · Ahu ×4
Amana - ASX160311A , ASPT39C14B 2 tons · Ahu ×4
1 project · most recent 10/06/2023
Gas Water/Sanitary
FiledStatusContractorScope
10/06/2023Signed-offADVANCED P,MECH & SPR CORGas, Water/Sanitary
2 projects · most recent 08/31/2023
General Wiring
FiledStatusContractorScope
08/31/2023CompleteG. G. ELECTRIC CORP.General Wiring
10/31/2018CompleteGENESIS ELECTRICAL GROUP1 meters
1 project · most recent 12/16/2025
Concrete
FiledStatusContractorScope
12/16/2025Permit IssuedEXO INDUSTRIES CORPConcrete
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/04/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/01/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
12/16/2025Fenestration and door U-factor and product ratingsALLENDE MATOSenergy_progress
12/16/2025HVAC-R and service water heating equipmentALLENDE MATOSenergy_progress
12/16/2025Permanent certificateMEL SARKOR-CLINTONenergy_progress
12/16/2025Concrete - Cast-In-PlaceALLENDE MATOSspecial
12/16/2025Fire-Resistant Penetrations and JointsALLENDE MATOSspecial
12/16/2025MasonryALLENDE MATOSspecial
12/16/2025Mechanical SystemsALLENDE MATOSspecial
12/16/2025Energy Code Compliance InspectionsALLENDE MATOSprogress
12/16/2025FinalMEL SARKOR-CLINTONprogress
12/16/2025Fire-Resistance Rated ConstructionALLENDE MATOSprogress
12/16/2025HVAC-R and service water heating system controlsALLENDE MATOSenergy_progress
12/16/2025Interior lighting powerALLENDE MATOSenergy_progress
12/16/2025Electric vehicle service equipment requirementsALLENDE MATOSenergy_progress
12/16/2025Maintenance informationMEL SARKOR-CLINTONenergy_progress
12/16/2025Insulation placement and R valuesALLENDE MATOSenergy_progress
12/16/2025Fenestration air leakageALLENDE MATOSenergy_progress
10/10/2023Fire-Resistant Penetrations and JointsALLENDE MATOSspecial
10/04/2023Fire-Resistant Penetrations and JointsALLENDE MATOSspecial
06/01/2023Fire-Resistant Penetrations and JointsALLENDE MATOSspecial
02/23/2023Fire-Resistant Penetrations and JointsALLENDE MATOSspecial
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026Q08014435-I1Request digital key ↗
08/24/2026Q08014435-P1Request digital key ↗
08/24/2026Q08014435-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION5
05/04/2019421647276Open ↗
03/23/2019421647276Open ↗
02/06/2019421647276Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION2
11/27/2018421647276Open ↗
11/27/2018421647276Open ↗
▸Seals & Professional Certifications31
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026Q08013628-P1Open ↗
09/02/2026Q08013628-P1Open ↗
09/02/2026Q08013628-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026Q08013628-P1Open ↗
09/02/2026Q08013628-P1Open ↗
09/02/2026Q08013628-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026Q08014435-I1Open ↗
08/24/2026Q08014435-P3Open ↗
08/24/2026Q08014435-P2Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
03/07/2019421647276Open ↗
11/27/2018421647276Open ↗
06/22/2018421647276Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/22/2018421647276Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/25/2018421647276Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
02/06/2019421647276Open ↗
01/26/2019421647276Open ↗
12/12/2018421647276Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026Q08014435-I1Open ↗
08/24/2026Q08014435-P3Open ↗
08/24/2026Q08014435-P2Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/22/2018421647276Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
05/04/2019421647276Open ↗
04/23/2019421647276Open ↗
03/18/2019421647276Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/07/2019421647276Open ↗
10/25/2018421647276Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
12/12/2018421647276Open ↗
06/22/2018421647276Open ↗
▸BISBOROUGH INTAKE FORM1
03/15/2019421647276Open ↗
▸BISADDITIONAL INFORMATION1
03/30/2019421647276Open ↗