DOB07/20/2013DUE TO SEVERE WEATHER CAUSED BY HURRICANE SANDY THE FOLLOWING DAMAGES OCCURED; REPLACED DAMAGED HOTWATER HEATER & BOILER CAUSED BY FLOODING ON THE 1ST FLOOR WITH ONE BAXI UNIT. REMEDY: MAKE ALL NECESSARY REPAIR AND OBTAIN ALL REQUIRED PERMITS WHERE APPLICABLE
Garden apartments · 4,298 sf lot · 0.28 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.