ECB03/05/2025WORK WITHOUT PERMIT .AT TIME OF INSPECTION I OBSERVED AT EXPO #1 ,90 % SECTION OF THE EXTERIOR WALL AT FRONT HAS COVERED BY PLASTIC POLY SHEETING COVER AT 2ND FLOOR LEVEL .NEW ATTIC ADDED WITH ROOF ALTERING THE$6K due
Two stories - detached, small or mid-size · 21,320 sf lot · 0.25 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.