Elevator cooperative
3 EAST 71 STREET
MANHATTAN · Upper East Side-Carnegie Hill · BIN 1041353
💬 Discuss this project
1944Year Built
13Stories
D4Building Class
R8BZoning
80,860 sfGross Floor Area
50Units
LL97 CoveredRent Stabilized3 Open Violations ▸FISP: SWARMP
Elevator cooperative · 10,216 sf lot · 7.92 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 12Under Construction33p · 1 filing · 17 docs
Floor 11Under Construction33p · 1 filing · 17 docs
Floor 10
Floor 94p · 3 filings · 20 docs
Floor 8
Floor 73p · 2 filings · 9 docs
Floor 6
Floor 5
Floor 4Under Construction6p · 2 filings · 16 docs
Floor 3Under Construction7p · 2 filings · 12 docs
Floor 2Under Construction6p · 1 filing · 5 docs
Floor 1Under Construction6p · 1 filing · 5 docs
Sub-BasementUnder Construction6p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BROWN HARRIS STEVENS RESIDENTIAL MA1109/13/2026
DOUGLAS ELLIMAN PROPERTY MGMT1307/08/2026
JERRICK ASSOC203/22/2026
ROSE ASSOCIATES1003/22/2026
5 EAST 71ST STREET3503/21/2026
1155 TENANTS203/21/2026
5 EAST 71 ST703/21/2026
C O DOUGLAS ELLIMAN PROPERTY MNG403/21/2026
INSIGNIA203/21/2026
3 EAST 71S203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARPAD BAKSA ARCHITECT, P.C.803/21/2026
B A INSPECTIONS1203/21/2026
AE DESIGN SOLUTION803/21/2026
J. CALLAHAN CONSULTING, INC.603/21/2026
DOMANI CONSULTING203/21/2026
EXPEDIENT CONSULTING203/21/2026
RIP CC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SILVERLINING INTERIORSGeneral Contractor907/08/2026
EMPIRE NY INSTALLATIONS INCGeneral Contractor607/08/2026
V. DISALVO CONTRACTING COGeneral Contractor407/01/2026
ASA BUILDING MAINT INCGeneral Contractor407/08/2026
LEONIDAS INTERIORS LLCGeneral Contractor303/21/2026
BLACK SQUARE BUILDERS CORPGeneral Contractor209/09/2026
DISALVO CONTRACTINGGeneral Contractor207/02/2026
ARCON PLBG SOLUTIONSPlumbing207/08/2026
BK PLUMBING & HEATING COPlumbing207/08/2026
IVAN BUTKOVICElectrical203/21/2026
DYNAMIC BLUE WATER MECHPlumbing207/30/2026
THE METRO GROUP ELECTRICElectrical103/22/2026
VAN TON, PATElectrical103/21/2026
CHINATOWN PLBG & HTG INCPlumbing107/08/2026
GREGG NY PLUMBING, INCPlumbing107/08/2026
PETER MICELI PLUMBINGPlumbing107/08/2026
ANTHONY SARACENIElectrical103/21/2026
ZFM INCPlumbing107/08/2026
ASPESI, MARCELOElectrical103/21/2026
BERGER CARLOSElectrical103/21/2026
EINSTEIN ELEC'L CORPElectrical103/22/2026
HERBERT RUDERMANElectrical103/21/2026
IRON WORKERS LOCAL 40Electrical103/21/2026
MAREK SZLEZAKElectrical103/21/2026
MARTINEZ, EFRAINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTEGRITY CONSULTING SERV666307/30/2026
RYAN SPECIAL ENGINEERING2018306/16/2025
BAALBAKI&ASSOCIATES ENGIN1858205/09/2024
BZINSPECTION8294105/09/2024
DOMANI INSPECTION SERVICE843701/17/2024
AGELOFF & ASSOCIATES1085104/07/2022
MARCH CHADWICK, ARCHITECT2253108/03/2020
Building Lifecycle
All (197)Filed (27)Permit Issued (33)Signed Off (13)Facade (FISP) (15)Violation (46)Inspection (17)Objection (22)Special Inspection (24)
09/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/08/2026
Permit issued — General Construction
M01422016-I1-GC
08/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/05/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/03/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/30/2026
Filed — Alteration
Provide new conduit from basement to fourth floor apartment and replace glass in windows as per plans filed herewith. No change to use. egress or occupancy.
M01422016-I1
07/29/2026
Permit issued — Plumbing
M01227260-S2-PL
07/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/30/2026
Permit issued — General Construction
M01227260-I1-GC
06/29/2026
Permit issued — Mechanical Systems
M01227260-S1-MS
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
06/24/2026
Special inspection requirement — Final
LAURA KAEHLER
06/05/2026
Permit issued — Plumbing
M01336148-S1-PL
06/01/2026
Permit issued — General Construction
M01336148-I1-GC
03/27/2026
Filed — Alteration
M01336148-I1
03/27/2026
Filed — Alteration
M01336148-S1
02/06/2026
Permit issued — General Construction
M01227260-I1-GC
02/06/2026
Permit issued — Mechanical Systems
M01227260-S1-MS
02/04/2026
Cycle 10 facade report signed — SWARMP
01/28/2026
Special inspection requirement — Post-installed Anchors
ALEKSANDR LEVIN
01/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
12/22/2025
Cycle 10 facade report submitted
12/17/2025
Special inspection requirement — Final
LAURA KAEHLER
12/09/2025
Cycle 10 facade inspection completed
08/04/2025
Permit issued — Mechanical Systems
M01227260-S1-MS
08/01/2025
Permit issued — General Construction
M01227260-I1-GC
08/01/2025
Permit issued — Plumbing
M01227260-S2-PL
07/16/2025
Objection resolved — Addressed
07/01/2025
Objection resolved — Addressed
07/01/2025
Objection resolved — Addressed
07/01/2025
Objection resolved — Addressed
07/01/2025
Objection resolved — Addressed
07/01/2025
Objection resolved — Addressed
07/01/2025
Objection resolved — Addressed
07/01/2025
Objection resolved — Addressed
06/27/2025
Objection resolved — Addressed
06/24/2025
Objection raised — Inspections
06/24/2025
Objection raised — Other
06/24/2025
Objection raised — Zoning
06/24/2025
Objection raised — Plumbing
06/24/2025
Objection raised — Scope
06/24/2025
Objection raised — Mechanical
06/24/2025
Objection raised — Scope
06/24/2025
Objection raised — Inspections
06/24/2025
Objection raised — Scope
06/16/2025
Filed — Alteration
Filing for mechanical renovations (PTAC, FCU and Air Cooled Heat Pump units) as per plans filed. No change of use, egress or occupancy.
M01227260-S1
06/16/2025
Filed — Alteration
Filing for mechanical renovations (PTAC, FCU and Air Cooled Heat Pump units) as per plans filed. No change of use, egress or occupancy.
M01227260-S2
06/16/2025
Filed — Alteration
Filing for mechanical renovations (PTAC, FCU and Air Cooled Heat Pump units) as per plans filed. No change of use, egress or occupancy.
M01227260-I1
05/19/2025
Special inspection requirement — Heating Systems
William Ryan
05/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
05/16/2025
Special inspection requirement — Mechanical Systems
William Ryan
05/16/2025
Special inspection requirement — Final
William Ryan
03/03/2025
Signed off — Alteration
REPLACE WINDOW UNITS WITH 3 PATAC SYSTEMS
M00904831-S2
02/24/2025
Signed off — Alteration
REPLACE WINDOW UNITS WITH 3 PATAC SYSTEMS
M00904831-I1
02/03/2025
Signed off — Alteration
REPLACE WINDOW UNITS WITH 3 PATAC SYSTEMS
M00904831-S1
12/10/2024
Filed — Alteration
REPLACE WINDOW UNITS WITH 3 PATAC SYSTEMS
M00904831-P4
11/22/2024
Violation issued (HPD, closed)
I
11/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/28/2024
Filed — Alteration
REPLACE WINDOW UNITS WITH 3 PATAC SYSTEMS
M00904831-P3
Latest 60 of 197 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBLACK SQUARE BUILDERS CORP09/08/2026
DOB NOWPlumbingPermit IssuedDYNAMIC BLUE WATER MECH07/29/2026
DOB NOWGeneral ConstructionPermit IssuedDISALVO CONTRACTING LLC06/30/2026
DOB NOWMechanical SystemsPermit IssuedDISALVO CONTRACTING LLC06/29/2026
DOB NOWPlumbingPermit IssuedGREGG NY PLUMBING, INC06/05/2026
DOB NOWGeneral ConstructionPermit IssuedBLACK SQUARE BUILDERS CORP06/01/2026
DOB NOWGeneral ConstructionPermit IssuedV. DISALVO CONTRACTING CO02/06/2026
DOB NOWMechanical SystemsPermit IssuedV. DISALVO CONTRACTING CO02/06/2026
DOB NOWMechanical SystemsPermit IssuedV. DISALVO CONTRACTING CO08/04/2025
DOB NOWGeneral ConstructionPermit IssuedV. DISALVO CONTRACTING CO08/01/2025
DOB NOWPlumbingPermit IssuedSUPER PLUMBERS CORP08/01/2025
DOB NOWGeneral ConstructionSigned-offASA BUILDING MAINT07/26/2024
DOB NOWPlumbingSigned-offZEFI MECHANICAL INC06/24/2024
DOB NOWMechanical SystemsSigned-offASA BUILDING MAINT05/15/2024
DOB NOWGeneral ConstructionSigned-offSILVERLINING INTERIORS09/01/2023
DOB NOWGeneral ConstructionSigned-offASA BUILDING MAINT08/01/2023
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I06/22/2023
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS06/17/2023
DOB NOWMechanical SystemsSigned-offSILVERLINING INTERIORS01/19/2023
DOB NOWGeneral ConstructionSigned-offSILVERLINING INTERIORS01/19/2023
DOB NOWMechanical SystemsSigned-offSILVERLINING INTERIORS12/28/2022
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS06/08/2022
DOB NOWGeneral ConstructionSigned-offLEONIDAS INTERIORS LLC06/06/2022
DOB NOWGeneral ConstructionSigned-offSILVERLINING INTERIORS06/02/2022
DOB NOWPlumbingSigned-offPETER MICELI PLUMBING05/11/2022
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I04/02/2022
DOB NOWSupported ScaffoldSigned-offEMPIRE NY INSTALLATIONS I02/01/2022
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I02/01/2022
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I03/27/2021
DOB NOWSupported ScaffoldSigned-offEMPIRE NY INSTALLATIONS I03/27/2021
DOB NOWPlumbingSigned-offBK PLUMBING & HEATING CO01/15/2021
DOB NOWPlumbingSigned-offCHINATOWN PLBG & HTG INC08/21/2020
DOB NOWPlumbingSigned-offBK PLUMBING & HEATING CO08/16/2019
BISPLISSUEDHENRY MYERS P & H, INC08/23/2022
BISOTISSUEDDEMARI SERVICES INC04/15/2021
BISOTISSUEDBLUEBERRY BUILDERS LLC07/20/2020
BISOTISSUEDDUCE CONSTRUCTION CORP10/08/2019
BISOTISSUEDTAJ CONSTRUCTION CORP06/14/2019
BISOTISSUEDMANHATTAN RENOVATIONS INC.10/10/2018
BISPLISSUEDMARQUIS P & H CO., INC10/09/2018
+ 43 more permits on file
1 project · most recent 06/16/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/16/2025Permit IssuedDISALVO CONTRACTING LLCHeating and Air Conditioning Systems
Heat / Cool
Islandaire EZ12A241G4N44A6 12,000 BTU · Ptac ×2
EZ12C2CKG1N14AA 12,000 BTU · Ptac ×1
EZ15A241G4N44A6 14,500 BTU · Ptac ×1
Daikin FXSA30AAVJU 25,914 BTU · Vrf Indoor ×2
RXTA60AAVJU 59,100 BTU · Vrf Outdoor ×1
2 projects · most recent 06/16/2025
Water/Sanitary Gas
FiledStatusContractorScope
06/16/2025Permit IssuedDYNAMIC BLUE WATER MECHGas, Water/Sanitary
08/03/2020Signed-offCHINATOWN PLBG & HTG INCWater/Sanitary
18 projects · most recent 08/08/2026
General Wiring
FiledStatusContractorScope
08/08/2026Permit IssuedAPN ELECTRICAL CORPGeneral Wiring
05/11/2026Permit IssuedCINTRON ELECL SVCS & LIGTGeneral Wiring
04/30/2026Permit IssuedTRIPLE H ELECTRICAL CORPGeneral Wiring
08/04/2025Permit IssuedEINSTEIN ELEC'L CORP—
08/04/2025Permit IssuedEINSTEIN ELEC'L CORPGeneral Wiring
11/06/2024CompleteALL CITY ELECTRICAL INCGeneral Wiring
08/28/2023CompleteCRESCO ELECTRICAL CORP—
06/23/2023CompleteMEGA ELEC'L CONTR'G, INC—
05/11/2023CompleteTHE METRO GROUP ELECTRICGeneral Wiring
02/21/2023CompleteJAM ELECTRICAL CORP—
08/23/2022CompleteALL CITY ELECTRICAL INC—
08/23/2022CompleteP & Z ELECTRIC CORP—
05/16/2022CompleteZIP ELECTRIC INCGeneral Wiring
05/11/2022CompleteCRESCO ELECTRICAL CORPGeneral Wiring
11/18/2020Permit IssuedMEGA ELEC'L CONTR'G, INC—
1 project · most recent 07/30/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
07/30/2026Permit IssuedBLACK SQUARE BUILDERS CORTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
09/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/05/2026Pass-Final PL - UndergroundPassView ↗
08/03/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/03/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/21/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/19/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
06/24/2026Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
06/24/2026FinalLAURA KAEHLERprogress
01/28/2026Post-installed AnchorsALEKSANDR LEVINspecial
01/28/2026Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
12/17/2025FinalLAURA KAEHLERprogress
05/19/2025Heating SystemsWilliam Ryanspecial
05/19/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
05/16/2025Mechanical SystemsWilliam Ryanspecial
05/16/2025FinalWilliam Ryanprogress
05/09/2024FinalBarry Bergprogress
05/09/2024Mechanical SystemsBarry Bergspecial
05/09/2024FinalBarry Bergprogress
05/09/2024Fire-Resistant Penetrations and JointsMohammad Baalbakispecial
05/09/2024FinalBarry Bergprogress
05/09/2024Fire-Resistant Penetrations and JointsMohammad Baalbakispecial
01/22/2024Energy Code Compliance InspectionsPeter Vottoprogress
01/22/2024Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
07/11/2023Energy Code Compliance InspectionsPeter Vottoprogress
07/11/2023Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
06/28/2022FinalJOHN MCMONAGLEprogress
06/28/2022Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
06/28/2022Post-installed AnchorsJOHN MCMONAGLEspecial
07/27/2020Fire-Resistant Penetrations and JointsMARCH CHADWICKspecial
07/31/2019Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
▾Documents — 796 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch22
09/02/2026M00705426-I1Request digital key ↗
09/02/2026M00705394-I1Request digital key ↗
09/02/2026M00705060-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/03/2026M00429597-I1Request digital key ↗
08/15/2026M00429597-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00200592-I1Request digital key ↗
09/04/2026M00376363-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00429587-I1Request digital key ↗
▸Applications & Permits166
▸BISWORK PERMIT APPLICATION80
08/24/2022123095248Open ↗
04/15/2021140923400Open ↗
07/20/2020140913322Open ↗
Showing 3 of 80 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION62
10/01/2024121914722Open ↗
09/25/2024121914722Open ↗
07/22/2022123095248Open ↗
Showing 3 of 62 on file for this type
▸DOB NOWLPC Approval/Permit24
09/04/2026M00376363-I1Open ↗
08/18/2026M01336148-S1Open ↗
08/18/2026M01336148-I1Open ↗
Showing 3 of 24 on file for this type
▸Seals & Professional Certifications150
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION73
11/04/2019122844459Open ↗
09/10/2019122844459Open ↗
08/05/2019123712535Open ↗
Showing 3 of 73 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/04/2026M00376363-I1Open ↗
09/04/2026M00429587-I1Open ↗
09/03/2026M00429597-P1Open ↗
Showing 3 of 27 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
07/15/2020140913322Open ↗
07/13/2020140913322Open ↗
07/08/2020140913322Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
08/28/2026M00705063-P1Open ↗
08/28/2026M00376363-I1Open ↗
08/27/2026M00904831-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/28/2026M00705063-P1Open ↗
08/27/2026M00904831-P1Open ↗
08/25/2026M01336148-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
06/16/2020140913322Open ↗
08/01/2019123712535Open ↗
Showing 2 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
07/24/2020140923400Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/24/2020140923400Open ↗
▸BISProfessional and Owner Certification (POC3)1
07/17/2017123294096Open ↗
▸Trade Schedules & Equipment70
▸BISSELF-CERT PLUMBING NOTICE33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸BISSCHEDULE B - PLUMBING23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE14
06/05/2019123095248Open ↗
08/09/2017123090859Open ↗
08/03/2017123090859Open ↗
Showing 3 of 14 on file for this type
▸Safety & Tenant Protection15
▸BISTenant Protection Plan and Notes8
08/01/2019123712535Open ↗
08/24/2017123099020Open ↗
07/17/2017123294096Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTenant Protection Plan5
09/04/2026M00376363-I1Open ↗
09/04/2026M00429587-I1Open ↗
08/13/2026M00429597-P1Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/24/2017123099020Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos62
▸BISASBESTOS: CERTIFICATION (DEP ACP5)22
08/06/2020140923400Open ↗
07/24/2020140923400Open ↗
06/16/2020140913322Open ↗
Showing 3 of 22 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
09/04/2026M00376363-I1Open ↗
09/02/2026M00705394-I1Open ↗
09/02/2026M00705060-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/18/2026M01336148-S1Open ↗
08/18/2026M01336148-I1Open ↗
08/16/2026M01422016-I1Open ↗
Showing 3 of 7 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
08/13/2019123712535Open ↗
▸Energy Compliance47
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
11/04/2019122844459Open ↗
09/10/2019122844459Open ↗
08/01/2019123712535Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
10/03/2024121914722Open ↗
04/11/2022123712535Open ↗
04/15/2021140923400Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
11/04/2019122844459Open ↗
Showing 1 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
01/08/2025121914722Open ↗
04/11/2022123712535Open ↗
11/12/2020140913322Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISINTERIOR LIGHTING POWER1
01/09/2025121914722Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/09/2025121914722Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/24/2020140923400Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00705394-I1Open ↗
▸Inspections & Test Reports27
▸BISTECHNICAL REPORT: RESPONSIBILITY23
10/03/2024121914722Open ↗
09/09/2022123095248Open ↗
04/11/2022123712535Open ↗
Showing 3 of 23 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
01/09/2025121914722Open ↗
09/07/2022123095248Open ↗
▸BISTECHNICAL REPORT: EXT. WALLS & APPURTS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPILES: FINAL PILE PLAN/CREOSOTE LETTER1
09/10/2019122844459Open ↗
▸Approvals, Objections & Sign-offs99
▸BISLANDMARKS APPROVAL45
07/24/2020140923400Open ↗
06/16/2020140913322Open ↗
08/01/2019123712535Open ↗
Showing 3 of 45 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST22
11/29/2022123712535Open ↗
10/04/2022123712535Open ↗
09/09/2022123095248Open ↗
Showing 3 of 22 on file for this type
▸BISADMINISTRATIVE OBJECTIONS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
06/17/2019122844459Open ↗
08/21/2017120045307Open ↗
Showing 2 of 6 on file for this type
▸BISLANDMARKS SIGNOFF6
11/15/2024121914722Open ↗
09/08/2022123095248Open ↗
04/12/2022123712535Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL3
01/09/2025121914722Open ↗
09/07/2022123095248Open ↗
04/11/2022123712535Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION (OT) SIGNOFF1
11/29/2022123712535Open ↗
▸Cost, Insurance & Ownership59
▸BISCOST AFFIDAVIT54
09/02/2020123099020Open ↗
08/06/2020140923400Open ↗
06/16/2020140913322Open ↗
Showing 3 of 54 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
12/09/2024121914722Open ↗
10/04/2022123712535Open ↗
09/07/2022123095248Open ↗
Showing 3 of 4 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms57
▸BISEFILING COVER SHEET26
08/01/2019123712535Open ↗
09/27/2018122844459Open ↗
07/17/2017123294096Open ↗
Showing 3 of 26 on file for this type
▸BISADDITIONAL INFORMATION19
02/10/2020123712535Open ↗
10/07/2019123095248Open ↗
08/24/2017123099020Open ↗
Showing 3 of 19 on file for this type
▸BISBOROUGH INTAKE FORM8
08/24/2022123095248Open ↗
11/04/2019122844459Open ↗
09/10/2019122844459Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
07/24/2020140923400Open ↗
06/16/2020140913322Open ↗
Showing 2 of 4 on file for this type
▸Other Documents17
▸DOB NOWProof of Historic Building10
08/18/2026M01336148-I1Open ↗
08/13/2026M01227260-I1Open ↗
08/13/2026M00705052-I1Open ↗
Showing 3 of 10 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form4
10/24/2017123090859Open ↗
Showing 1 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTax Abatement Miscellaneous1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type