← Back
BuildNYC
Elevator cooperative
3 EAST 71ST STREET
MANHATTAN · BIN 1041353
💬 Discuss this project
1944Year Built
13Stories
D4Building Class
R8BZoning
80,860 sfGross Floor Area
50Units
LL97 CoveredRent Stabilized0 Active Violations 1 likely answered ▸FISP: SWARMP
Elevator cooperative · 10,216 sf lot · 7.92 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofPipe scaffold7p · 1 filing · 6 docs
Floor 12Under Construction32p · 1 filing · 17 docs
Floor 11Unit 11AUnder Construction32p · 1 filing · 17 docs
Floor 10
Floor 9Unit 9D18p · 4 filings · 20 docs
Floor 8Unit 8A, Unit 8B4p · 1 filing · 6 docs
Floor 7Unit 7E4p · 2 filings · 9 docs
Floor 6
Floor 5Unit 5B2p · 1 filing · 6 docs
Floor 4Unit 4D, Unit 4EUnder Construction22p · 4 filings · 20 docs
Floor 3Under Construction6p · 1 filing · 5 docs
Floor 2Under Construction6p · 1 filing · 5 docs
Floor 1Under Construction6p · 1 filing · 5 docs
Sub-BasementUnder Construction6p · 1 filing · 5 docs
Site & exteriorTemporary sidewalk shed installation14p · 3 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
5 East 71st5503/21/2026
Mendik Realty Co303/21/2026
1155 Tenants203/21/2026
3 East 71st Street203/21/2026
Building203/21/2026
Brown Harris Stevens Residential Ma110/13/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Arpad Baksa Architect803/21/2026
B A Inspections1203/21/2026
AE Design Solution803/21/2026
Jack Callahan Consulting603/21/2026
Maryclare Nepogoda203/21/2026
Expedient Consulting203/21/2026
Rip CC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Silverlining InteriorsGeneral Contractor907/08/2026
Empire NY InstallationsScaffold607/08/2026
Asa Building MaintenanceGeneral Contractor407/08/2026
V. Disalvo Contracting CoGeneral Contractor407/01/2026
Leonidas InteriorsGeneral Contractor303/21/2026
Black Square BuildersGeneral Contractor209/09/2026
Disalvo ContractingGeneral Contractor207/02/2026
Arcon Plumbing SolutionsPlumbing207/08/2026
BK Plumbing & Heating CoPlumbing207/08/2026
Einstein ElectricalElectrical203/21/2026
Dynamic Blue Water MechanicalPlumbing207/30/2026
Gregg NY PlumbingPlumbing107/08/2026
Peter Miceli PlumbingPlumbing107/08/2026
Delta Phase ElectricalElectrical103/21/2026
ZFMPlumbing107/08/2026
Millennium Maintenance & ElectricalElectrical103/21/2026
Berger CarlosElectrical103/21/2026
Einstein ElectricalElectrical103/22/2026
Ampol Electrical ContElectrical103/21/2026
Megaris Electrical ContgElectrical103/21/2026
Saraceni AnthonyElectrical103/21/2026
Szlezak MarekElectrical103/21/2026
The Metro Group ElectricElectrical103/22/2026
P2 ElectricElectrical103/21/2026
Chinatown Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Integrity Consulting Service666307/30/2026
Ryan Special Engineering2018306/16/2025
Baalbaki & Associates Engineering1858205/09/2024
Bzinspection8294105/09/2024
Domani Inspection Service843701/17/2024
Ageloff & Associates1085104/07/2022
March Chadwick, Architect2253108/03/2020
Building Lifecycle
All (195)Filed (27)Permit Issued (33)Signed Off (13)Facade (FISP) (15)Violation (46)Inspection (15)Objection (22)Special Inspection (24)
09/08/2026
Permit issued — General Construction
M01422016-I1-GC
08/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/03/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/30/2026
Filed — Alteration
Provide new conduit from basement to fourth floor apartment and replace glass in windows as per plans filed herewith. No change to use. egress or occupancy.
M01422016-I1
07/29/2026
Permit issued — Plumbing
M01227260-S2-PL
07/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/30/2026
Permit issued — General Construction
M01227260-I1-GC
06/29/2026
Permit issued — Mechanical Systems
M01227260-S1-MS
06/24/2026
Special inspection requirement — Final
LAURA KAEHLER
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
06/05/2026
Permit issued — Plumbing
M01336148-S1-PL
06/01/2026
Permit issued — General Construction
M01336148-I1-GC
03/27/2026
Filed — Alteration
M01336148-S1
03/27/2026
Filed — Alteration
M01336148-I1
02/06/2026
Permit issued — Mechanical Systems
M01227260-S1-MS
02/06/2026
Permit issued — General Construction
M01227260-I1-GC
02/04/2026
Cycle 10 facade report signed — SWARMP
01/28/2026
Special inspection requirement — Post-installed Anchors
ALEKSANDR LEVIN
01/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
12/22/2025
Cycle 10 facade report submitted
12/17/2025
Special inspection requirement — Final
LAURA KAEHLER
12/09/2025
Cycle 10 facade inspection completed
08/04/2025
Permit issued — Mechanical Systems
M01227260-S1-MS
08/01/2025
Permit issued — Plumbing
M01227260-S2-PL
08/01/2025
Permit issued — General Construction
M01227260-I1-GC
07/16/2025
Objection resolved — Addressed
07/01/2025
Objection resolved — Addressed
07/01/2025
Objection resolved — Addressed
07/01/2025
Objection resolved — Addressed
07/01/2025
Objection resolved — Addressed
07/01/2025
Objection resolved — Addressed
07/01/2025
Objection resolved — Addressed
07/01/2025
Objection resolved — Addressed
06/27/2025
Objection resolved — Addressed
06/24/2025
Objection raised — Zoning
06/24/2025
Objection raised — Scope
06/24/2025
Objection raised — Other
06/24/2025
Objection raised — Scope
06/24/2025
Objection raised — Inspections
06/24/2025
Objection raised — Inspections
06/24/2025
Objection raised — Plumbing
06/24/2025
Objection raised — Scope
06/24/2025
Objection raised — Mechanical
06/16/2025
Filed — Alteration
Filing for mechanical renovations (PTAC, FCU and Air Cooled Heat Pump units) as per plans filed. No change of use, egress or occupancy.
M01227260-I1
06/16/2025
Filed — Alteration
Filing for mechanical renovations (PTAC, FCU and Air Cooled Heat Pump units) as per plans filed. No change of use, egress or occupancy.
M01227260-S1
06/16/2025
Filed — Alteration
Filing for mechanical renovations (PTAC, FCU and Air Cooled Heat Pump units) as per plans filed. No change of use, egress or occupancy.
M01227260-S2
05/19/2025
Special inspection requirement — Heating Systems
William Ryan
05/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
05/16/2025
Special inspection requirement — Mechanical Systems
William Ryan
05/16/2025
Special inspection requirement — Final
William Ryan
03/03/2025
Signed off — Alteration
REPLACE WINDOW UNITS WITH 3 PATAC SYSTEMS
M00904831-S2
02/24/2025
Signed off — Alteration
REPLACE WINDOW UNITS WITH 3 PATAC SYSTEMS
M00904831-I1
02/03/2025
Signed off — Alteration
REPLACE WINDOW UNITS WITH 3 PATAC SYSTEMS
M00904831-S1
12/10/2024
Filed — Alteration
REPLACE WINDOW UNITS WITH 3 PATAC SYSTEMS
M00904831-P4
11/22/2024
Violation issued (HPD, closed)
I
11/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/28/2024
Filed — Alteration
REPLACE WINDOW UNITS WITH 3 PATAC SYSTEMS
M00904831-P3
10/09/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/26/2024
Permit issued — General Construction
M00904831-I1-GC
Latest 60 of 195 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBlack Square Builders09/08/2026
DOB NOWPlumbingPermit IssuedDynamic Blue Water Mechanical07/29/2026
DOB NOWGeneral ConstructionPermit IssuedDisalvo Contracting06/30/2026
DOB NOWMechanical SystemsPermit IssuedDisalvo Contracting06/29/2026
DOB NOWPlumbingPermit IssuedGregg NY Plumbing06/05/2026
DOB NOWGeneral ConstructionPermit IssuedBlack Square Builders06/01/2026
DOB NOWMechanical SystemsPermit IssuedV. Disalvo Contracting Co02/06/2026
DOB NOWGeneral ConstructionPermit IssuedV. Disalvo Contracting Co02/06/2026
DOB NOWMechanical SystemsPermit IssuedV. Disalvo Contracting Co08/04/2025
DOB NOWPlumbingPermit IssuedSuper Plumbers08/01/2025
DOB NOWGeneral ConstructionPermit IssuedV. Disalvo Contracting Co08/01/2025
DOB NOWGeneral ConstructionSigned-offAsa Building Maintenance07/26/2024
DOB NOWPlumbingSigned-offZefi Mechanical06/24/2024
DOB NOWMechanical SystemsSigned-offAsa Building Maintenance05/15/2024
DOB NOWGeneral ConstructionSigned-offSilverlining Interiors09/01/2023
DOB NOWGeneral ConstructionSigned-offAsa Building Maintenance08/01/2023
DOB NOWSidewalk ShedSigned-offEmpire NY Installations I06/22/2023
DOB NOWPlumbingSigned-offArcon Plumbing Solutions06/17/2023
DOB NOWGeneral ConstructionSigned-offSilverlining Interiors01/19/2023
DOB NOWMechanical SystemsSigned-offSilverlining Interiors01/19/2023
DOB NOWMechanical SystemsSigned-offSilverlining Interiors12/28/2022
DOB NOWPlumbingSigned-offArcon Plumbing Solutions06/08/2022
DOB NOWGeneral ConstructionSigned-offLeonidas Interiors06/06/2022
DOB NOWGeneral ConstructionSigned-offSilverlining Interiors06/02/2022
DOB NOWPlumbingSigned-offPeter Miceli Plumbing05/11/2022
DOB NOWSidewalk ShedSigned-offEmpire NY Installations I04/02/2022
DOB NOWSupported ScaffoldSigned-offEmpire NY Installations I02/01/2022
DOB NOWSidewalk ShedSigned-offEmpire NY Installations I02/01/2022
DOB NOWSupported ScaffoldSigned-offEmpire NY Installations I03/27/2021
DOB NOWSidewalk ShedSigned-offEmpire NY Installations I03/27/2021
DOB NOWPlumbingSigned-offBK Plumbing & Heating Co01/15/2021
DOB NOWPlumbingSigned-offChinatown Plumbing & Heating08/21/2020
DOB NOWPlumbingSigned-offBK Plumbing & Heating Co08/16/2019
BISPLISSUEDHenry Myers P & H08/23/2022
BISOTISSUEDDemari Services04/15/2021
BISOTISSUEDBlueberry Builders07/20/2020
BISOTISSUEDDuce Construction10/08/2019
BISOTISSUEDTaj Construction06/14/2019
BISOTISSUEDManhattan Renovations10/10/2018
BISPLISSUEDMarquis P & H Co10/09/2018
+ 43 more permits on file
1 project · most recent 06/16/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/16/2025Permit IssuedDisalvo ContractingHeating and Air Conditioning Systems
Heat / Cool
Islandaire EZ12A241G4N44A6 12,000 BTU · Ptac ×2
EZ12C2CKG1N14AA 12,000 BTU · Ptac ×1
EZ15A241G4N44A6 14,500 BTU · Ptac ×1
Daikin FXSA30AAVJU 25,914 BTU · Vrf Indoor ×2
RXTA60AAVJU 59,100 BTU · Vrf Outdoor ×1
2 projects · most recent 06/16/2025
Water/Sanitary Gas
FiledStatusContractorScope
06/16/2025Permit IssuedDynamic Blue Water MechanicalGas, Water/Sanitary
08/03/2020Signed-offChinatown Plumbing & HeatingWater/Sanitary
18 projects · most recent 08/08/2026
General Wiring
FiledStatusContractorScope
08/08/2026Permit IssuedApn ElectricalGeneral Wiring
05/11/2026Permit IssuedCintron Electrical Services & LigtGeneral Wiring
04/30/2026Permit IssuedTriple H ElectricalGeneral Wiring
08/04/2025Permit IssuedEinstein Electrical—
08/04/2025Permit IssuedEinstein ElectricalGeneral Wiring
11/06/2024CompleteAll City ElectricalGeneral Wiring
08/28/2023CompleteCresco Electrical—
06/23/2023CompleteMega Electrical Contracting—
05/11/2023CompleteThe Metro Group ElectricGeneral Wiring
02/21/2023CompleteJam Electrical—
08/23/2022CompleteAll City Electrical—
08/23/2022CompleteP & Z Electric—
05/16/2022CompleteZip ElectricGeneral Wiring
05/11/2022CompleteCresco ElectricalGeneral Wiring
11/18/2020Permit IssuedMega Electrical Contracting—
1 project · most recent 07/30/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
07/30/2026Permit IssuedBlack Square BuildersTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
08/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/03/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/03/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/21/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/19/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
06/24/2026FinalLAURA KAEHLERprogress
06/24/2026Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
01/28/2026Post-installed AnchorsALEKSANDR LEVINspecial
01/28/2026Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
12/17/2025FinalLAURA KAEHLERprogress
05/19/2025Heating SystemsWilliam Ryanspecial
05/19/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
05/16/2025Mechanical SystemsWilliam Ryanspecial
05/16/2025FinalWilliam Ryanprogress
05/09/2024Mechanical SystemsBarry Bergspecial
05/09/2024Fire-Resistant Penetrations and JointsMohammad Baalbakispecial
05/09/2024FinalBarry Bergprogress
05/09/2024FinalBarry Bergprogress
05/09/2024Fire-Resistant Penetrations and JointsMohammad Baalbakispecial
05/09/2024FinalBarry Bergprogress
01/22/2024Energy Code Compliance InspectionsPeter Vottoprogress
01/22/2024Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
07/11/2023Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
07/11/2023Energy Code Compliance InspectionsPeter Vottoprogress
06/28/2022Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
06/28/2022FinalJOHN MCMONAGLEprogress
06/28/2022Post-installed AnchorsJOHN MCMONAGLEspecial
07/27/2020Fire-Resistant Penetrations and JointsMARCH CHADWICKspecial
07/31/2019Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
▾Documents — 796 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch22
09/02/2026M00705426-I1Request digital key ↗
09/02/2026M00705394-I1Request digital key ↗
09/02/2026M00705060-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/03/2026M00429597-I1Request digital key ↗
08/15/2026M00429597-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00200592-I1Request digital key ↗
09/04/2026M00376363-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00429587-I1Request digital key ↗
▸Applications & Permits166
▸BISWORK PERMIT APPLICATION80
08/24/2022123095248Open ↗
04/15/2021140923400Open ↗
07/20/2020140913322Open ↗
Showing 3 of 80 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION62
10/01/2024121914722Open ↗
09/25/2024121914722Open ↗
07/22/2022123095248Open ↗
Showing 3 of 62 on file for this type
▸DOB NOWLPC Approval/Permit24
09/04/2026M00376363-I1Open ↗
08/18/2026M01336148-S1Open ↗
08/18/2026M01336148-I1Open ↗
Showing 3 of 24 on file for this type
▸Seals & Professional Certifications150
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION73
11/04/2019122844459Open ↗
09/10/2019122844459Open ↗
08/05/2019123712535Open ↗
Showing 3 of 73 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/04/2026M00376363-I1Open ↗
09/04/2026M00429587-I1Open ↗
09/03/2026M00429597-P1Open ↗
Showing 3 of 27 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
07/15/2020140913322Open ↗
07/13/2020140913322Open ↗
07/08/2020140913322Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
08/28/2026M00705063-P1Open ↗
08/28/2026M00376363-I1Open ↗
08/27/2026M00904831-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/28/2026M00705063-P1Open ↗
08/27/2026M00904831-P1Open ↗
08/25/2026M01336148-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
06/16/2020140913322Open ↗
08/01/2019123712535Open ↗
Showing 2 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
07/24/2020140923400Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/24/2020140923400Open ↗
▸BISProfessional and Owner Certification (POC3)1
07/17/2017123294096Open ↗
▸Trade Schedules & Equipment70
▸BISSELF-CERT PLUMBING NOTICE33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸BISSCHEDULE B - PLUMBING23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE14
06/05/2019123095248Open ↗
08/09/2017123090859Open ↗
08/03/2017123090859Open ↗
Showing 3 of 14 on file for this type
▸Safety & Tenant Protection15
▸BISTenant Protection Plan and Notes8
08/01/2019123712535Open ↗
08/24/2017123099020Open ↗
07/17/2017123294096Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTenant Protection Plan5
09/04/2026M00376363-I1Open ↗
09/04/2026M00429587-I1Open ↗
08/13/2026M00429597-P1Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/24/2017123099020Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos62
▸BISASBESTOS: CERTIFICATION (DEP ACP5)22
08/06/2020140923400Open ↗
07/24/2020140923400Open ↗
06/16/2020140913322Open ↗
Showing 3 of 22 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
09/04/2026M00376363-I1Open ↗
09/02/2026M00705394-I1Open ↗
09/02/2026M00705060-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/18/2026M01336148-I1Open ↗
08/18/2026M01336148-S1Open ↗
08/16/2026M01422016-I1Open ↗
Showing 3 of 7 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
08/13/2019123712535Open ↗
▸Energy Compliance47
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
11/04/2019122844459Open ↗
09/10/2019122844459Open ↗
08/01/2019123712535Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
10/03/2024121914722Open ↗
04/11/2022123712535Open ↗
04/15/2021140923400Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
11/04/2019122844459Open ↗
Showing 1 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
01/08/2025121914722Open ↗
04/11/2022123712535Open ↗
11/12/2020140913322Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISINTERIOR LIGHTING POWER1
01/09/2025121914722Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/09/2025121914722Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/24/2020140923400Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00705394-I1Open ↗
▸Inspections & Test Reports27
▸BISTECHNICAL REPORT: RESPONSIBILITY23
10/03/2024121914722Open ↗
09/09/2022123095248Open ↗
04/11/2022123712535Open ↗
Showing 3 of 23 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
01/09/2025121914722Open ↗
09/07/2022123095248Open ↗
▸BISTECHNICAL REPORT: EXT. WALLS & APPURTS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPILES: FINAL PILE PLAN/CREOSOTE LETTER1
09/10/2019122844459Open ↗
▸Approvals, Objections & Sign-offs99
▸BISLANDMARKS APPROVAL45
07/24/2020140923400Open ↗
06/16/2020140913322Open ↗
08/01/2019123712535Open ↗
Showing 3 of 45 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST22
11/29/2022123712535Open ↗
10/04/2022123712535Open ↗
09/09/2022123095248Open ↗
Showing 3 of 22 on file for this type
▸BISADMINISTRATIVE OBJECTIONS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
06/17/2019122844459Open ↗
08/21/2017120045307Open ↗
Showing 2 of 6 on file for this type
▸BISLANDMARKS SIGNOFF6
11/15/2024121914722Open ↗
09/08/2022123095248Open ↗
04/12/2022123712535Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL3
01/09/2025121914722Open ↗
09/07/2022123095248Open ↗
04/11/2022123712535Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION (OT) SIGNOFF1
11/29/2022123712535Open ↗
▸Cost, Insurance & Ownership59
▸BISCOST AFFIDAVIT54
09/02/2020123099020Open ↗
08/06/2020140923400Open ↗
06/16/2020140913322Open ↗
Showing 3 of 54 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
12/09/2024121914722Open ↗
10/04/2022123712535Open ↗
09/07/2022123095248Open ↗
Showing 3 of 4 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms57
▸BISEFILING COVER SHEET26
08/01/2019123712535Open ↗
09/27/2018122844459Open ↗
07/17/2017123294096Open ↗
Showing 3 of 26 on file for this type
▸BISADDITIONAL INFORMATION19
02/10/2020123712535Open ↗
10/07/2019123095248Open ↗
08/24/2017123099020Open ↗
Showing 3 of 19 on file for this type
▸BISBOROUGH INTAKE FORM8
08/24/2022123095248Open ↗
11/04/2019122844459Open ↗
09/10/2019122844459Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
07/24/2020140923400Open ↗
06/16/2020140913322Open ↗
Showing 2 of 4 on file for this type
▸Other Documents17
▸DOB NOWProof of Historic Building10
08/18/2026M01336148-I1Open ↗
08/13/2026M00705052-I1Open ↗
08/13/2026M01320209-I1Open ↗
Showing 3 of 10 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form4
10/24/2017123090859Open ↗
Showing 1 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTax Abatement Miscellaneous1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type