Miscellaneous garage
3 KNICKERBOCKER AVENUE
BROOKLYN · BIN 3070608
💬 Discuss this project
1931Year Built
2Stories
G9Building Class
M1-2Zoning
2,650 sfGross Floor Area
2Units
4 Open Violations ▸FDNY Report ↗
Miscellaneous garage · Owner of record: 3 KNICKERBOCKER, LLC · 1,575 sf lot · 1.68 FAR built · Flood zone X
Locations of Work
Fire ProtectionCivil
Floor 21p · 1 filing · 20 docs
Floor 1
Cellar1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3 KNICKERBOCKER2907/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/26/2019$1.5M—— → —$566/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN DESIGN CONSTRUCT, LLC803/10/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WAWEL PLBG AND HTG CORPPlumbing307/08/2026
NEW ERA DEVELOPMENT GROUPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN DESIGN CONSTRUCT, L4145603/10/2022
Building Lifecycle
All (54)Filed (8)Permit Issued (4)Signed Off (3)Violation (9)Special Inspection (30)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/18/2022
Signed off — Alteration
1. Amend Plans to show gas riser from Cel to 2nd floor (new rough-in for existing stove); 2. Provide Schedule C for Boiler inspection; 3. Amend plans to add 3 new floor drains, relabel (1) commercial sink to (1) floor sink, remove (2) funnel drains.
B00340190-I1
03/11/2022
Special inspection requirement — HVAC and service water heating system controls
john senisi
03/11/2022
Special inspection requirement — HVAC insulation and sealing
john senisi
03/11/2022
Special inspection requirement — Maintenance information
john senisi
03/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
john senisi
03/11/2022
Special inspection requirement — Fire-Resistance Rated Construction
john senisi
03/11/2022
Special inspection requirement — Energy Code Compliance Inspections
john senisi
03/11/2022
Special inspection requirement — HVAC and service water heating equipment
john senisi
03/10/2022
Filed — Alteration
1. Amend Plans to show gas riser from Cel to 2nd floor (new rough-in for existing stove); 2. Provide Schedule C for Boiler inspection; 3. Amend plans to add 3 new floor drains, relabel (1) commercial sink to (1) floor sink, remove (2) funnel drains.
B00340190-P6
03/10/2022
Permit issued — Plumbing
B00340190-I1-PL
03/10/2022
Special inspection requirement — HVAC insulation and sealing
john senisi
03/10/2022
Special inspection requirement — Energy Code Compliance Inspections
john senisi
03/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
john senisi
03/10/2022
Special inspection requirement — Maintenance information
john senisi
03/10/2022
Special inspection requirement — HVAC and service water heating equipment
john senisi
03/10/2022
Special inspection requirement — HVAC and service water heating system controls
john senisi
03/10/2022
Special inspection requirement — Fire-Resistance Rated Construction
john senisi
02/22/2022
Signed off — Alteration
B00340197-I1
12/10/2021
Signed off — Alteration
B00536434-I1
09/17/2021
Filed — Alteration
B00536434-P1
09/17/2021
Special inspection requirement — HVAC-R and service water heating equipment
john senisi
09/17/2021
Special inspection requirement — Maintenance information
john senisi
09/17/2021
Special inspection requirement — HVAC-R and service water heating system controls
john senisi
06/17/2021
Permit issued — Boiler Equipment
B00536434-I1-BE
06/14/2021
Filed — Alteration
B00536434-I1
06/02/2021
Filed — Alteration
1. Amend Plans to show gas riser from Cel to 2nd floor (new rough-in for existing stove); 2. Provide Schedule C for Boiler inspection; 3. Amend plans to add 3 new floor drains, relabel (1) commercial sink to (1) floor sink, remove (2) funnel drains.
B00340190-P3
04/02/2021
Filed — Alteration
1. Amend Plans to show gas riser from Cel to 2nd floor (new rough-in for existing stove); 2. Provide Schedule C for Boiler inspection; 3. Amend plans to add 3 new floor drains, relabel (1) commercial sink to (1) floor sink, remove (2) funnel drains.
B00340190-P2
04/01/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
john senisi
04/01/2021
Special inspection requirement — HVAC insulation and sealing
john senisi
04/01/2021
Special inspection requirement — HVAC and service water heating equipment
john senisi
04/01/2021
Special inspection requirement — HVAC and service water heating system controls
john senisi
04/01/2021
Special inspection requirement — Maintenance information
john senisi
04/01/2021
Special inspection requirement — Fire-Resistance Rated Construction
john senisi
04/01/2021
Special inspection requirement — Energy Code Compliance Inspections
john senisi
02/25/2021
Permit issued — Plumbing
B00340190-I1-PL
01/26/2021
Filed — Alteration
1. Amend Plans to show gas riser from Cel to 2nd floor (new rough-in for existing stove); 2. Provide Schedule C for Boiler inspection; 3. Amend plans to add 3 new floor drains, relabel (1) commercial sink to (1) floor sink, remove (2) funnel drains.
B00340190-P1
12/08/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
john senisi
12/08/2020
Special inspection requirement — Energy Code Compliance Inspections
john senisi
12/08/2020
Special inspection requirement — Fire-Resistance Rated Construction
john senisi
12/08/2020
Special inspection requirement — HVAC and service water heating equipment
john senisi
12/08/2020
Special inspection requirement — Maintenance information
john senisi
12/08/2020
Special inspection requirement — HVAC insulation and sealing
john senisi
12/03/2020
Permit issued — Mechanical Systems
B00340197-I1-MS
10/19/2020
Filed — Alteration
B00340197-I1
09/03/2020
Filed — Alteration
1. Amend Plans to show gas riser from Cel to 2nd floor (new rough-in for existing stove); 2. Provide Schedule C for Boiler inspection; 3. Amend plans to add 3 new floor drains, relabel (1) commercial sink to (1) floor sink, remove (2) funnel drains.
B00340190-I1
08/19/2018
Violation issued (ECB, closed)
Construction
07/13/2005
Violation issued (ECB, closed)
Construction
07/13/2005
Violation issued (ECB, closed)
Quality of Life
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/25/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWAWEL PLBG AND HTG CORP03/10/2022
DOB NOWBoiler EquipmentSigned-offWAWEL PLBG AND HTG CORP06/17/2021
DOB NOWPlumbingSigned-offWAWEL PLBG AND HTG CORP02/25/2021
DOB NOWMechanical SystemsSigned-offNEW ERA DEVELOPMENT GROUP12/03/2020
BISOTISSUEDBROOKLYN SOLARWORKS LLC02/10/2022
BIS—ISSUEDNEW ERA DEVELOPMENT GROUP08/06/2021
BISOTISSUEDNEW ERA DEVELOPMENT GROUP12/15/2020
BIS—ISSUEDNEW ERA DEVELOPMENT GROUP08/03/2020
BIS—ISSUEDH & H BLDG CONSULTANTS INC09/14/2005
4 projects · most recent 07/17/2023
General Wiring
FiledStatusContractorScope
07/17/2023CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
04/05/2022CompleteBROOKYLN SOLARWORKS, LLC—
12/27/2021CompleteSPICE ELECTRIC COMPANYGeneral Wiring
01/28/2021CompleteAMRA ELECTRICAL CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
03/11/2022HVAC and service water heating system controls john senisienergy_progress
03/11/2022HVAC insulation and sealing john senisienergy_progress
03/11/2022Maintenance informationjohn senisienergy_progress
03/11/2022Fire-Resistant Penetrations and Jointsjohn senisispecial
03/11/2022Fire-Resistance Rated Constructionjohn senisiprogress
03/11/2022Energy Code Compliance Inspectionsjohn senisiprogress
03/11/2022HVAC and service water heating equipment john senisienergy_progress
03/10/2022HVAC insulation and sealing john senisienergy_progress
03/10/2022Energy Code Compliance Inspectionsjohn senisiprogress
03/10/2022Fire-Resistant Penetrations and Jointsjohn senisispecial
03/10/2022Maintenance informationjohn senisienergy_progress
03/10/2022HVAC and service water heating equipment john senisienergy_progress
03/10/2022HVAC and service water heating system controls john senisienergy_progress
03/10/2022Fire-Resistance Rated Constructionjohn senisiprogress
09/17/2021HVAC-R and service water heating equipmentjohn senisienergy_progress
09/17/2021Maintenance informationjohn senisienergy_progress
09/17/2021HVAC-R and service water heating system controlsjohn senisienergy_progress
04/01/2021Fire-Resistant Penetrations and Jointsjohn senisispecial
04/01/2021HVAC insulation and sealing john senisienergy_progress
04/01/2021HVAC and service water heating equipment john senisienergy_progress
04/01/2021HVAC and service water heating system controls john senisienergy_progress
04/01/2021Maintenance informationjohn senisienergy_progress
04/01/2021Fire-Resistance Rated Constructionjohn senisiprogress
04/01/2021Energy Code Compliance Inspectionsjohn senisiprogress
12/08/2020Fire-Resistant Penetrations and Jointsjohn senisispecial
Latest 25 of 31.
▾Documents — 173 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch - Plumbing5
09/02/2026B00340190-I1Request digital key ↗
09/02/2026B00340190-P3Request digital key ↗
08/15/2026B00340190-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch2
09/01/2026B00536434-I1Request digital key ↗
09/01/2026B00536434-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00340197-I1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION11
05/11/2022322034222Open ↗
02/08/2022340835074Open ↗
10/19/2020340770892Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION5
02/10/2022340835074Open ↗
12/15/2020340770892Open ↗
08/03/2020322034222Open ↗
Showing 3 of 5 on file for this type
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)2
12/15/2020340770892Open ↗
07/19/2020322034222Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
12/15/2020340770892Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/01/2022322034222Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
03/04/2022322034222Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
05/15/2022322034222Open ↗
▸Seals & Professional Certifications38
▸DOB NOWProgress Inspector Seal & Signature21
09/22/2026B00340190-P2Open ↗
09/22/2026B00340190-P2Open ↗
09/22/2026B00340190-P2Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/01/2026B00536434-P1Open ↗
09/01/2026B00536434-I1Open ↗
08/13/2026B00340190-P3Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
10/22/2019321965771Open ↗
08/06/2019321965771Open ↗
06/12/2019321965771Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/22/2026B00340190-P2Open ↗
08/30/2026B00340190-I1Open ↗
08/23/2026B00340190-P6Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
02/08/2022340835074Open ↗
10/19/2020340770892Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/19/2020340770892Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/12/2019321965771Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
05/13/2022322034222Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
12/20/2019301996151Open ↗
▸Safety & Tenant Protection14
▸DOB NOWTenant Protection Plan6
08/13/2026B00340190-P3Open ↗
08/13/2026B00340190-P1Open ↗
08/13/2026B00340190-P2Open ↗
Showing 3 of 6 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES3
10/19/2020340770892Open ↗
05/01/2020322034222Open ↗
07/08/2019321965771Open ↗
▸BISSTREET TREE CHECKLIST2
04/29/2020322034222Open ↗
04/29/2020322034222Open ↗
▸BISSTREET TREE SIGNOFF1
05/13/2022322034222Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
02/10/2022340835074Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
04/29/2020322034222Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/01/2026B00536434-I1Open ↗
09/01/2026B00536434-P1Open ↗
08/13/2026B00340190-P1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
02/08/2022340835074Open ↗
10/19/2020340770892Open ↗
04/29/2020322034222Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance27
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
08/15/2022340835074Open ↗
02/08/2022340835074Open ↗
10/19/2020340770892Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
08/15/2022340835074Open ↗
06/27/2022340770892Open ↗
10/22/2019321965771Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
10/22/2019321965771Open ↗
08/06/2019321965771Open ↗
06/12/2019321965771Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
08/16/2022340835074Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
03/03/2022322034222Open ↗
▸BISFENESTRATION AREAS1
03/03/2022322034222Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
02/08/2022340835074Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/03/2022322034222Open ↗
▸BISLIGHTING IN DWELLING UNITS1
03/03/2022322034222Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/03/2022322034222Open ↗
▸BISLIGHTING CONTROLS1
03/03/2022322034222Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/03/2022322034222Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/19/2020340770892Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
03/03/2022322034222Open ↗
▸BISEXTERIOR LIGHTING POWER1
03/03/2022322034222Open ↗
▸BISFENESTRATION AIR LEAKAGE1
03/03/2022322034222Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
03/03/2022322034222Open ↗
▸BISINTERIOR LIGHTING POWER1
03/03/2022322034222Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00536434-I1Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY6
08/15/2022340835074Open ↗
06/27/2022340770892Open ↗
02/08/2022340835074Open ↗
Showing 3 of 6 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/03/2022322034222Open ↗
▸BISMASONRY1
03/03/2022322034222Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
10/22/2019321965771Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
11/18/2021340770892Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
03/03/2022322034222Open ↗
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/16/2022340835074Open ↗
07/01/2022340770892Open ↗
10/22/2019321965771Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
08/16/2022340835074Open ↗
04/30/2020322034222Open ↗
04/29/2020322034222Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
05/01/2020322034222Open ↗
04/28/2020322034222Open ↗
▸BISCONSTRUCTION (OT) SIGNOFF1
06/07/2022322034222Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
03/03/2022322034222Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT8
08/15/2022340835074Open ↗
06/27/2022340770892Open ↗
02/08/2022340835074Open ↗
Showing 3 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/04/2022322034222Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
07/10/2020322034222Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
08/03/2020322034222Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION6
06/07/2022322034222Open ↗
05/07/2020322034222Open ↗
04/29/2020322034222Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM3
12/20/2019301996151Open ↗
11/13/2019301996151Open ↗
10/22/2019321965771Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
02/08/2022340835074Open ↗
10/19/2020340770892Open ↗
▸BISEFILING COVER SHEET2
04/10/2020322034222Open ↗
06/12/2019321965771Open ↗
▸Other Documents3
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
12/20/2019301996151Open ↗
▸BISMAINTENANCE INFORMATION1
03/03/2022322034222Open ↗
▸BISPLOT DIAGRAM1
04/29/2020322034222Open ↗