← Back
Building
3 MADERA STREET
BIN 5177112
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
StructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction2p · 1 filing · 20 docs
Floor 1Under Construction2p · 1 filing · 20 docs
CellarUnder Construction3p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A TECH ENGINEERING NYC, PLLC.103/05/2026
SANNA & LOCCISANO ARCHITECTS, PC401/14/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SANNA LOCCISANO ARCHITECTS P C603/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARBUTUS HYLAN REALTY CORPGeneral Contractor304/09/2026
FLOW-RIGHT PLBG & HTG CORPlumbing206/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738112/23/2025
Building Lifecycle
All (43)Filed (5)Permit Issued (5)Inspection (3)Special Inspection (30)
07/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/06/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/29/2026
Permit issued — Plumbing
S01297148-S3-PL
04/29/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/22/2026
Permit issued — Plumbing
S01297148-S1-PL
03/23/2026
Permit issued — Construction Fence
S01182693-I1-FN
03/18/2026
Permit issued — Mechanical Systems
S01297148-I1-GC
03/05/2026
Filed — New Building
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
S01297148-S3
01/14/2026
Filed — New Building
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
S01297148-S2
01/14/2026
Filed — New Building
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
S01297148-S1
01/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
01/13/2026
Special inspection requirement — Maintenance information
anthony santoro
01/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
01/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
01/12/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
12/23/2025
Filed — New Building
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
S01297148-I1
12/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
12/23/2025
Special inspection requirement — Metering
anthony santoro
12/23/2025
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
12/23/2025
Special inspection requirement — Structural Wood Frame
anthony santoro
12/23/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
12/23/2025
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
12/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
12/23/2025
Special inspection requirement — Structural Steel - Welding
anthony santoro
12/23/2025
Special inspection requirement — Structural Steel - High Strength Bolting
anthony santoro
12/23/2025
Special inspection requirement — Subgrade Inspections
anthony santoro
12/23/2025
Special inspection requirement — Maintenance information
anthony santoro
12/23/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
12/23/2025
Special inspection requirement — Lighting in dwelling units
anthony santoro
12/22/2025
Special inspection requirement — Air barrier - visual inspection
anthony santoro
12/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
12/22/2025
Special inspection requirement — Air barrier — testing
anthony santoro
12/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
12/22/2025
Special inspection requirement — Structural Steel - Details
anthony santoro
12/22/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
12/22/2025
Special inspection requirement — Permanent certificate
anthony santoro
12/22/2025
Special inspection requirement — Fenestration air leakage
anthony santoro
12/22/2025
Special inspection requirement — Fenestration areas
anthony santoro
12/22/2025
Special inspection requirement — Insulation placement and R values
anthony santoro
12/22/2025
Special inspection requirement — Ventilation and air distribution system
anthony santoro
12/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
03/17/2025
Permit issued — Construction Fence
S01182693-I1-FN
02/24/2025
Filed — Alteration
Fence application filed in conjunction with Demo Application Job # S01162404 and future NB applications filed in the DOB NOW for tentative lots 110, 111 and 112.
S01182693-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedFLOW-RIGHT PLBG & HTG COR04/29/2026
DOB NOWPlumbingPermit IssuedFLOW-RIGHT PLBG & HTG COR04/22/2026
DOB NOWConstruction FencePermit IssuedARBUTUS HYLAN REALTY CORP03/23/2026
DOB NOWMechanical SystemsPermit IssuedARBUTUS HYLAN REALTY CORP03/18/2026
DOB NOWConstruction FencePermit IssuedARBUTUS HYLAN REALTY CORP03/17/2025
1 project · most recent 03/05/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/05/2026Permit IssuedARBUTUS HYLAN REALTY CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric SUZ-AK48NL 48,000 BTU · Split System ×2
SUZ-AA18NL 18,000 BTU · Split System ×1
Heating
Mitsubishi Electric SEZ-AD18NL 20,000 BTU · Heat Pump Outdoor ×2
SVZ-AP48NL 60,000 BTU · Heat Pump Outdoor ×1
Ventilation
Panasonic FV-10VE2 100 CFM · Erv ×2
1 project · most recent 03/05/2026
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
03/05/2026Permit IssuedFLOW-RIGHT PLBG & HTG CORPlumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 06/19/2026
General Wiring
FiledStatusContractorScope
06/19/2026Permit IssuedD AND H ELECTRICAL CONSTGeneral Wiring
1 project · most recent 03/05/2026
Steel Wood
FiledStatusContractorScope
03/05/2026Permit IssuedFLOW-RIGHT PLBG & HTG CORSteel, Wood
1 project · most recent 02/24/2025
Fence
FiledStatusContractorScope
02/24/2025Permit IssuedARBUTUS HYLAN REALTY CORPFence
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/06/2026Pass-Final PL - UndergroundPassView ↗
04/29/2026Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
01/13/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
01/13/2026Maintenance informationanthony santoroenergy_progress
01/13/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
01/13/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
01/12/2026Energy Code Compliance Inspectionsanthony santoroprogress
12/23/2025Fire-Resistance Rated Constructionanthony santoroprogress
12/23/2025Meteringanthony santoroenergy_progress
12/23/2025Duct leakage testing, insulation and designanthony santoroenergy_progress
12/23/2025Structural Wood Frameanthony santoroprogress
12/23/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
12/23/2025Concrete - Cast-In-Placeanthony santorospecial
12/23/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
12/23/2025Structural Steel - Weldinganthony santorospecial
12/23/2025Structural Steel - High Strength Boltinganthony santorospecial
12/23/2025Subgrade Inspectionsanthony santorospecial
12/23/2025Maintenance informationanthony santoroenergy_progress
12/23/2025Energy Code Compliance Inspectionsanthony santoroprogress
12/23/2025Lighting in dwelling unitsanthony santoroenergy_progress
12/22/2025Air barrier - visual inspectionanthony santoroenergy_progress
12/22/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
12/22/2025Air barrier — testing anthony santoroenergy_progress
12/22/2025HVAC-R and service water piping design and insulationanthony santoroenergy_progress
12/22/2025Structural Steel - Detailsanthony santorospecial
12/22/2025Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
12/22/2025Permanent certificateanthony santoroenergy_progress
Latest 25 of 33.
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026S01182693-I1Request digital key ↗
08/17/2026S01297148-S3Request digital key ↗
08/17/2026S01297148-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01297148-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S01297148-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S01297148-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026S01297148-S3Open ↗
08/17/2026S01297148-S2Open ↗
08/17/2026S01297148-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/27/2026S01297148-S1Open ↗
08/27/2026S01297148-S1Open ↗
08/25/2026S01297148-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026S01297148-I1Open ↗
08/25/2026S01297148-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S01297148-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01297148-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/17/2026S01297148-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01297148-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S01297148-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/17/2026S01297148-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S01297148-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S01297148-I1Open ↗