← Back
Old law tenement
3 QUINCY STREET
BROOKLYN · BIN 3056395
💬 Discuss this project
1930Year Built
4Stories
C4Building Class
R6BZoning
7,708 sfGross Floor Area
8Units
Rent Stabilized18 Open Violations ▸
Old law tenement · Owner of record: 3 QUINCY CORP. · 2,342 sf lot · 3.29 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanical
Roof1p · 1 filing · 3 docs
Floor 14p · 1 filing · 12 docs
Cellar4p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3 QUINCY3507/08/2026
GONZAGA REMODELING INC103/22/2026
ABEL & BRIDGES PARTNERSHIP703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIZA WORKS OF ARCHITECTURE PLLC510/03/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NIZA WORKS OF ARCHITECTURE1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AILA CONSTRUCTION CORPGeneral Contractor707/08/2026
AKIE LAWRENCEGeneral Contractor303/21/2026
WEBSTAR ELECL CONTRS INCElectrical103/22/2026
JOHN EVAN CONTRACTING CORGeneral Contractor104/09/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIZA WORKS OF ARCH PLLC6101510/03/2025
AR CONSULTING ENGINEER P.4054203/22/2023
Building Lifecycle
All (100)Filed (5)Permit Issued (6)Signed Off (4)Violation (60)Inspection (5)Objection (2)Special Inspection (18)
04/16/2026
Signed off — Alteration
REPAIR OF A DAMAGED SECTION OF THE PARAPET WALL. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01284892-I1
03/26/2026
Permit issued — General Construction
B01284892-I1-GC
11/07/2025
Violation issued (HPD, closed)
C
11/07/2025
Violation issued (HPD, closed)
C
10/15/2025
Objection resolved — Addressed
10/14/2025
Objection raised — Cost
10/03/2025
Filed — Alteration
REPAIR OF A DAMAGED SECTION OF THE PARAPET WALL. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01284892-I1
03/17/2024
Violation issued (HPD, closed)
B
03/17/2024
Violation issued (HPD, open)
C
10/10/2023
Signed off — Alteration
B00879189-I1
10/06/2023
Permit issued — Mechanical Systems
B00879189-I1-MS
07/08/2023
Filed — Alteration
B00879189-I1
04/12/2023
Signed off — Alteration
INTERIOR ALTERATION OF A 3 BEDROOM APARTMENT (UNIT 1 BACK). BATHROOM, KITCHEN AND PARTITIONS TO BE RELOCATED. NEW CONVENIENCE STAIR TO BE ADDED FOR THE ACCESSORY CELLAR SPACE. NEW DUCTLESS HEAT PUMP TO BE INSTALLED. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00666328-I1
03/22/2023
Filed — Alteration
INTERIOR ALTERATION OF A 3 BEDROOM APARTMENT (UNIT 1 BACK). BATHROOM, KITCHEN AND PARTITIONS TO BE RELOCATED. NEW CONVENIENCE STAIR TO BE ADDED FOR THE ACCESSORY CELLAR SPACE. NEW DUCTLESS HEAT PUMP TO BE INSTALLED. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00666328-P1
03/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
Nicolas Zapata
03/21/2023
Special inspection requirement — Fenestration areas
Nicolas Zapata
03/21/2023
Special inspection requirement — Fenestration air leakage
Nicolas Zapata
03/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Zapata
03/21/2023
Special inspection requirement — Masonry
Nicolas Zapata
03/21/2023
Special inspection requirement — Mechanical Systems
Nicolas Zapata
03/21/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
QAZI RAZZAK
03/21/2023
Special inspection requirement — Energy Code Compliance Inspections
Nicolas Zapata
03/21/2023
Special inspection requirement — Final
Nicolas Zapata
03/21/2023
Special inspection requirement — Fire-Resistance Rated Construction
Nicolas Zapata
03/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicolas Zapata
03/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
Nicolas Zapata
03/21/2023
Special inspection requirement — Insulation placement and R values
Nicolas Zapata
03/21/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Nicolas Zapata
03/21/2023
Special inspection requirement — Interior lighting power
Nicolas Zapata
03/21/2023
Special inspection requirement — Air barrier - visual inspection
Nicolas Zapata
03/17/2023
Permit issued — Mechanical Systems
B00666328-I1-ST
03/17/2023
Permit issued — Structural
B00666328-I1-MS
10/19/2022
Signed off — Alteration
PLUMBING SCOPE FOR JOB NUMBER B00666328. RELOCATE EXISTING BATHROOM AND KITCHEN AT FIRST FLOOR. CREATE NEW POWDER ROOM AT THE CELLAR. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00679078-I1
09/29/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/20/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/20/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/20/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/20/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/28/2022
Permit issued — Plumbing
B00679078-I1-PL
04/25/2022
Filed — Alteration
PLUMBING SCOPE FOR JOB NUMBER B00666328. RELOCATE EXISTING BATHROOM AND KITCHEN AT FIRST FLOOR. CREATE NEW POWDER ROOM AT THE CELLAR. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00679078-I1
04/19/2022
Permit issued — General Construction
B00666328-I1-GC
04/05/2022
Special inspection requirement — Energy Code Compliance Inspections
Nicolas Zapata
04/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Zapata
03/01/2022
Violation issued (HPD, closed)
A
01/26/2022
Filed — Alteration
INTERIOR ALTERATION OF A 3 BEDROOM APARTMENT (UNIT 1 BACK). BATHROOM, KITCHEN AND PARTITIONS TO BE RELOCATED. NEW CONVENIENCE STAIR TO BE ADDED FOR THE ACCESSORY CELLAR SPACE. NEW DUCTLESS HEAT PUMP TO BE INSTALLED. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00666328-I1
10/17/2018
Violation issued (ECB, closed)
Construction
09/19/2018
Violation issued (HPD, open)
B
09/19/2018
Violation issued (HPD, open)
B
09/19/2018
Violation issued (HPD, open)
B
09/03/2018
Violation issued (ECB, closed)
Construction
07/31/2018
Violation issued (HPD, open)
B
07/31/2018
Violation issued (HPD, open)
B
07/31/2018
Violation issued (HPD, open)
A
07/31/2018
Violation issued (HPD, open)
A
07/31/2018
Violation issued (HPD, open)
A
05/09/2018
Violation issued (HPD, closed)
B
05/09/2018
Violation issued (HPD, closed)
B
04/23/2018
Violation issued (HPD, closed)
C
04/23/2018
Violation issued (HPD, closed)
C
02/23/2018
Violation issued (HPD, closed)
C
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJOHN EVAN CONTRACTING COR03/26/2026
DOB NOWMechanical SystemsSigned-offAKIE LAWRENCE10/06/2023
DOB NOWMechanical SystemsSigned-offAILA CONSTRUCTION CORP03/17/2023
DOB NOWStructuralSigned-offAILA CONSTRUCTION CORP03/17/2023
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC04/28/2022
DOB NOWGeneral ConstructionSigned-offAILA CONSTRUCTION CORP04/19/2022
BISOTISSUEDAKIE LAWRENCE02/10/2022
BISMHISSUEDAKIE LAWRENCE02/01/2022
BISMHISSUEDAKIE LAWRENCE12/10/2021
BISPLISSUEDROCK E SMALL PLBG&HTG INC09/10/2018
BISOTISSUEDGONZAGA REMODELING INC07/24/2018
BISPLISSUEDTOP DOG PLBG & HTG CORP03/17/2017
BISOTISSUEDBO7 CONSTRUCTION CORP03/17/2017
BISPLISSUEDPLBG P & H INC07/09/2014
BISOTISSUEDA&A BUILDING CONSULTANTS06/04/2014
BISPLISSUEDMETROPOLITAN HEAT & POWER CO03/18/2004
BISBLISSUEDMETROPOLITAN HEAT & POWER CO03/18/2004
BISOTISSUEDROSS FACILITIES SERVICES04/25/2001
2 projects · most recent 04/06/2022
General Wiring
FiledStatusContractorScope
04/06/2022CompleteWEBSTAR ELECL CONTRS INCGeneral Wiring
09/07/2018CompleteALL-RITE ELECT CORP OF NY—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/29/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/20/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/20/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/20/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
03/21/2023HVAC-R and service water heating system controlsNicolas Zapataenergy_progress
03/21/2023Fenestration areasNicolas Zapataenergy_progress
03/21/2023Fenestration air leakageNicolas Zapataenergy_progress
03/21/2023Fire-Resistant Penetrations and JointsNicolas Zapataspecial
03/21/2023MasonryNicolas Zapataspecial
03/21/2023Mechanical SystemsNicolas Zapataspecial
03/21/2023Structural Stability – Alterations of existing buildingsQAZI RAZZAKspecial
03/21/2023Energy Code Compliance InspectionsNicolas Zapataprogress
03/21/2023FinalNicolas Zapataprogress
03/21/2023Fire-Resistance Rated ConstructionNicolas Zapataprogress
03/21/2023HVAC-R and service water piping design and insulationNicolas Zapataenergy_progress
03/21/2023HVAC-R and service water heating equipmentNicolas Zapataenergy_progress
03/21/2023Insulation placement and R valuesNicolas Zapataenergy_progress
03/21/2023Fenestration and door U-factor and product ratingsNicolas Zapataenergy_progress
03/21/2023Interior lighting powerNicolas Zapataenergy_progress
03/21/2023Air barrier - visual inspectionNicolas Zapataenergy_progress
04/05/2022Energy Code Compliance InspectionsNicolas Zapataprogress
04/05/2022Fire-Resistant Penetrations and JointsNicolas Zapataspecial
▾Documents — 132 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/31/2026B00666328-P1Request digital key ↗
08/31/2026B00666328-I1Request digital key ↗
08/29/2026B00679078-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits32
▸BISPLAN / WORK APPROVAL APPLICATION18
02/10/2022340619628Open ↗
01/25/2022340619628Open ↗
12/09/2021320927324Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION10
02/12/2022340619628Open ↗
02/03/2022340619628Open ↗
12/10/2021340619628Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
05/07/2019340619628Open ↗
12/19/2017321540524Open ↗
06/26/2017321540524Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications26
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
07/11/2018321540524Open ↗
06/29/2018321540524Open ↗
04/25/2018321540524Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/31/2026B00666328-I1Open ↗
08/31/2026B00666328-P1Open ↗
08/27/2026B00879189-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/19/2026B00666328-P1Open ↗
09/19/2026B00666328-P1Open ↗
09/19/2026B00666328-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/19/2026B00666328-P1Open ↗
09/19/2026B00666328-P1Open ↗
09/01/2026B00679078-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/18/2018340619628Open ↗
03/20/2017321540524Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/20/2017321540524Open ↗
07/02/2014320927324Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/18/2018340619628Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/18/2018340619628Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/02/2014320927324Open ↗
▸Trade Schedules & Equipment16
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
06/07/2019340619628Open ↗
01/10/2018321540524Open ↗
07/19/2017321540524Open ↗
Showing 3 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
04/15/2015320927324Open ↗
04/15/2015320927324Open ↗
03/25/2015320927324Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING4
08/22/2019340619628Open ↗
03/26/2019340619628Open ↗
07/18/2018340619628Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
07/18/2018340619628Open ↗
03/20/2017321540524Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026B00666328-I1Open ↗
08/31/2026B00666328-P1Open ↗
08/13/2026B00679078-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/18/2018340619628Open ↗
03/20/2017321540524Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
06/29/2018321540524Open ↗
04/25/2018321540524Open ↗
04/25/2018321540524Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/30/2022340619628Open ↗
07/18/2018340619628Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/25/2018321540524Open ↗
▸BISTR8: Energy Code Progress Inspections1
07/02/2014320927324Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/30/2022340619628Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/18/2018340619628Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/31/2026B00666328-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
05/30/2022340619628Open ↗
07/18/2018340619628Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
05/31/2022340619628Open ↗
07/11/2018321540524Open ↗
06/29/2018321540524Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
07/02/2014320927324Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT4
07/18/2018340619628Open ↗
04/25/2018321540524Open ↗
03/20/2017321540524Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
05/30/2022340619628Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
03/23/2017321540524Open ↗
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION10
02/10/2022340619628Open ↗
08/22/2019340619628Open ↗
07/22/2019340619628Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM5
07/11/2018321540524Open ↗
06/29/2018321540524Open ↗
06/14/2018321540524Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET2
03/21/2017321540524Open ↗
07/02/2014320927324Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/18/2018340619628Open ↗