← Back
Two stories - detached, small or mid-size
3 ST AUSTINS PLACE
STATEN ISLAND · BIN 5003652
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R2Zoning
1,860 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,880 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RONALD D.VICTORIO R.A.207/09/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D.C.F. CONTRACTING INCGeneral Contractor204/09/2026
K-10 ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738107/09/2025
Building Lifecycle
All (17)Filed (2)Permit Issued (2)Signed Off (2)Special Inspection (11)
12/09/2025
Signed off — Alteration
Partial demolition of screenhouse structure at rear of building. New frame wall, windows & roof to be installed. No change in floor area, Use, # of stories, egress and/or lot coverage.
S01253216-I1
11/06/2025
Signed off — Alteration
installation of 8' - 0" high plywood temporary construction fence around the area of scope of work at rear of residence
S01233084-I1
08/07/2025
Permit issued — General Construction
S01253216-I1-GC-CX
08/07/2025
Permit issued — Construction Fence
S01233084-I1-FN
07/09/2025
Filed — Alteration
Partial demolition of screenhouse structure at rear of building. New frame wall, windows & roof to be installed. No change in floor area, Use, # of stories, egress and/or lot coverage.
S01253216-I1
07/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
anthony santoro
07/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
anthony santoro
07/09/2025
Special inspection requirement — Final
anthony santoro
07/09/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
07/09/2025
Special inspection requirement — Structural Wood Frame
anthony santoro
07/09/2025
Special inspection requirement — Air barrier - visual inspection
anthony santoro
07/09/2025
Special inspection requirement — Insulation placement and R values
anthony santoro
07/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
07/09/2025
Special inspection requirement — Fenestration air leakage
anthony santoro
07/09/2025
Special inspection requirement — Fenestration areas
anthony santoro
07/09/2025
Special inspection requirement — Interior lighting power
anthony santoro
05/29/2025
Filed — Alteration
installation of 8' - 0" high plywood temporary construction fence around the area of scope of work at rear of residence
S01233084-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offD.C.F. CONTRACTING INC08/07/2025
DOB NOWConstruction FenceSigned-offD.C.F. CONTRACTING INC08/07/2025
1 project · most recent 08/27/2025
General Wiring
FiledStatusContractorScope
08/27/2025Permit IssuedK-10 ELECTRIC CORPGeneral Wiring
1 project · most recent 07/09/2025
Wood
FiledStatusContractorScope
07/09/2025Signed-offD.C.F. CONTRACTING INCWood
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
07/09/2025Structural Stability – Alterations of existing buildingsanthony santorospecial
07/09/2025Tenant Protection Plan Complianceanthony santorospecial
07/09/2025Finalanthony santoroprogress
07/09/2025Energy Code Compliance Inspectionsanthony santoroprogress
07/09/2025Structural Wood Frameanthony santoroprogress
07/09/2025Air barrier - visual inspectionanthony santoroenergy_progress
07/09/2025Insulation placement and R valuesanthony santoroenergy_progress
07/09/2025Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
07/09/2025Fenestration air leakageanthony santoroenergy_progress
07/09/2025Fenestration areasanthony santoroenergy_progress
07/09/2025Interior lighting poweranthony santoroenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026S01233084-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026S01253216-I1Open ↗
08/13/2026S01233084-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026S01253216-I1Open ↗
08/23/2026S01253216-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026S01253216-I1Open ↗
▸Other Documents1
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S01253216-I1Open ↗