← Back
QUEENS
30-24 32 STREET
QUEENS · BIN 4626046
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
RoofUnder Construction1 filing · 20 docs
Floor 5Under Construction1 filing · 20 docs
Floor 4Under Construction1 filing · 20 docs
Floor 3Under Construction1 filing · 20 docs
Floor 2Under Construction1 filing · 20 docs
Floor 1Under Construction1 filing · 20 docs
CellarUnder Construction1 filing · 20 docs
1 job · most recent 06/01/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/01/2026Permit IssuedN.Y. PREFERRED DEVELOPMENHeating and Air Conditioning Systems
Heat / Cool
Fujitsu AOU36RLAVS4 36,000 BTU · Heat Pump Outdoor ×5
Fujitsu AOU12RL2 12,000 BTU · Heat Pump Outdoor ×1
Fujitsu AOU48RLAVS4 48,000 BTU · Heat Pump Outdoor ×1
1 job · most recent 06/01/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/01/2026Signed-offPIPING & PLUMBING SOLUTIOStorm, Water/Sanitary
Building Lifecycle
All (73)Filed (13)Permit Issued (11)Signed Off (6)Inspection (12)Objection (1)Special Inspection (30)
07/08/2026
Objection raised — Other
07/06/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
06/01/2026
Filed — New Building
Herewith filing for sprinkler system throughout proposed 5-story residential new building.
Q00985440-P9
05/28/2026
Special inspection requirement — Fenestration areas
GLEN LANGER
05/28/2026
Special inspection requirement — Insulation placement and R values
GLEN LANGER
05/28/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
GLEN LANGER
05/28/2026
Special inspection requirement — Protection of exposed foundation insulation
GLEN LANGER
05/28/2026
Special inspection requirement — Sprayed fire-resistant materials
GLEN LANGER
05/28/2026
Special inspection requirement — Energy Code Compliance Inspections
GLEN LANGER
05/28/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
GLEN LANGER
05/28/2026
Special inspection requirement — Masonry
GLEN LANGER
05/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
05/28/2026
Special inspection requirement — Air barrier - visual inspection
GLEN LANGER
05/28/2026
Special inspection requirement — Fenestration air leakage
GLEN LANGER
05/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
GLEN LANGER
05/28/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
GLEN LANGER
02/10/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
GLEN LANGER
02/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
GLEN LANGER
02/10/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
GLEN LANGER
02/10/2026
Special inspection requirement — Fenestration air leakage
GLEN LANGER
02/10/2026
Special inspection requirement — Energy Code Compliance Inspections
GLEN LANGER
02/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
GLEN LANGER
02/10/2026
Special inspection requirement — Air barrier - visual inspection
GLEN LANGER
02/10/2026
Special inspection requirement — Sprayed fire-resistant materials
GLEN LANGER
02/10/2026
Special inspection requirement — Protection of exposed foundation insulation
GLEN LANGER
02/10/2026
Special inspection requirement — Fenestration areas
GLEN LANGER
02/10/2026
Special inspection requirement — Masonry
GLEN LANGER
02/10/2026
Special inspection requirement — Insulation placement and R values
GLEN LANGER
02/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
01/27/2026
Filed — New Building
Herewith filing for sprinkler system throughout proposed 5-story residential new building.
Q00985440-P5
01/27/2026
Special inspection requirement — Sprayed fire-resistant materials
GLEN LANGER
01/27/2026
Special inspection requirement — Masonry
GLEN LANGER
01/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
01/27/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
GLEN LANGER
12/23/2025
Signed off — New Building
Herewith filing for sprinkler system throughout proposed 5-story residential new building.
Q00985440-S3
12/23/2025
Signed off — New Building
Herewith filing for sprinkler system throughout proposed 5-story residential new building.
Q00985440-S2
12/23/2025
Signed off — New Building
Herewith filing for sprinkler system throughout proposed 5-story residential new building.
Q00985440-S1
12/19/2025
Signed off — New Building
Herewith filing for sprinkler system throughout proposed 5-story residential new building.
Q00985440-S6
11/26/2025
Filed — New Building
Herewith filing for sprinkler system throughout proposed 5-story residential new building.
Q00985440-P4
11/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/03/2025
Filed — New Building
Herewith filing for sprinkler system throughout proposed 5-story residential new building.
Q00985440-P3
10/03/2025
Filed — New Building
Herewith filing for sprinkler system throughout proposed 5-story residential new building.
Q00985440-P2
09/26/2025
Permit issued — General Construction
Q00985440-I1-GC
08/04/2025
Permit issued — General Construction
Q00985440-I1-GC
07/09/2025
Permit issued — General Construction
Q00985440-I1-GC
07/03/2025
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
06/27/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
06/04/2025
Filed — New Building
Herewith filing for sprinkler system throughout proposed 5-story residential new building.
Q00985440-P1
04/11/2025
Permit issued — General Construction
Q00985440-I1-GC
04/09/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/25/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/12/2024
Permit issued — Plumbing
Q00985440-S2-PL
11/09/2024
Signed off — New Building
Herewith filing for sprinkler system throughout proposed 5-story residential new building.
Q00985440-S5
11/06/2024
Permit issued — Sprinklers
Q00985440-S3-EW-SP
10/18/2024
Permit issued — Mechanical Systems
Q00985440-S1-MS
10/15/2024
Permit issued — Structural
Q00985440-S6-ST
09/30/2024
Signed off — New Building
Herewith filing for sprinkler system throughout proposed 5-story residential new building.
Q00985440-S7
08/15/2024
Permit issued — Foundation
Q00985440-S5-FO
Latest 60 of 73 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NDKAZALAS ARCHITECTURE P.C.806/01/2026
SIDERIS KEFALAS ENGINEERS PC510/03/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
S&S CONCRETE & SOIL TESTI10081306/01/2026
BRIAN E. FLYNN, PE, PC2837210/03/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedN.Y. PREFERRED DEVELOPMEN09/26/2025
DOB NOWGeneral ConstructionPermit IssuedN.Y. PREFERRED DEVELOPMEN08/04/2025
DOB NOWGeneral ConstructionPermit IssuedN.Y. PREFERRED DEVELOPMEN07/09/2025
DOB NOWGeneral ConstructionPermit IssuedN.Y. PREFERRED DEVELOPMEN04/11/2025
DOB NOWPlumbingSigned-offEMPIRE PLUMBING INC11/12/2024
DOB NOWSprinklersSigned-offEMPIRE PLUMBING INC11/06/2024
DOB NOWMechanical SystemsSigned-offN.Y. PREFERRED DEVELOPMEN10/18/2024
DOB NOWStructuralSigned-offN.Y. PREFERRED DEVELOPMEN10/15/2024
DOB NOWFoundationSigned-offN.Y. PREFERRED DEVELOPMEN08/15/2024
DOB NOWSupport of ExcavationSigned-offN.Y. PREFERRED DEVELOPMEN08/09/2024
DOB NOWGeneral ConstructionPermit IssuedN.Y. PREFERRED DEVELOPMEN08/06/2024
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
07/06/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
11/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/03/2025Pass-Final SD - Fire PumpPassView ↗
06/27/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/09/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/25/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/14/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/14/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/14/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/14/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 98
DateRequirementInspectorRole
05/28/2026Exterior Insulation and Finish Systems (EIFS)GLEN LANGERspecial
05/28/2026Fenestration air leakageGLEN LANGERenergy_progress
05/28/2026Fenestration and door U-factor and product ratingsGLEN LANGERenergy_progress
05/28/2026Insulation placement and R valuesGLEN LANGERenergy_progress
05/28/2026Fenestration areasGLEN LANGERenergy_progress
05/28/2026Protection of exposed foundation insulationGLEN LANGERenergy_progress
05/28/2026Air barrier - visual inspectionGLEN LANGERenergy_progress
05/28/2026Fire-Resistance Rated ConstructionGLEN LANGERprogress
05/28/2026Energy Code Compliance InspectionsGLEN LANGERprogress
05/28/2026Wall Panels, Curtain Walls, and VeneersGLEN LANGERspecial
05/28/2026Sprayed fire-resistant materialsGLEN LANGERspecial
05/28/2026MasonryGLEN LANGERspecial
05/28/2026Fire-Resistant Penetrations and JointsGLEN LANGERspecial
02/10/2026Fire-Resistant Penetrations and JointsGLEN LANGERspecial
02/10/2026Wall Panels, Curtain Walls, and VeneersGLEN LANGERspecial
02/10/2026MasonryGLEN LANGERspecial
02/10/2026Sprayed fire-resistant materialsGLEN LANGERspecial
02/10/2026Energy Code Compliance InspectionsGLEN LANGERprogress
02/10/2026Fire-Resistance Rated ConstructionGLEN LANGERprogress
02/10/2026Insulation placement and R valuesGLEN LANGERenergy_progress
02/10/2026Fenestration areasGLEN LANGERenergy_progress
02/10/2026Protection of exposed foundation insulationGLEN LANGERenergy_progress
02/10/2026Air barrier - visual inspectionGLEN LANGERenergy_progress
02/10/2026Fenestration and door U-factor and product ratingsGLEN LANGERenergy_progress
02/10/2026Exterior Insulation and Finish Systems (EIFS)GLEN LANGERspecial
Latest 25 of 98.
▾Documents — 83 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/20/2026Q00985440-P4Request digital key ↗
08/20/2026Q00985440-P3Request digital key ↗
08/20/2026Q00985440-P2Request digital key ↗
Showing 3 of 12 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00985440-P5Open ↗
08/13/2026Q00985440-I1Open ↗
08/13/2026Q00985440-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026Q00985440-P5Open ↗
08/13/2026Q00985440-P1Open ↗
08/13/2026Q00985440-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00985440-I1Open ↗
▸Seals & Professional Certifications42
▸DOB NOWSpecial Inspector Seal & Signature16
09/01/2026Q00985440-P2Open ↗
09/01/2026Q00985440-S7Open ↗
08/31/2026Q00985440-S3Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026Q00985440-P2Open ↗
09/01/2026Q00985440-P2Open ↗
08/28/2026Q00985440-S2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/20/2026Q00985440-P4Open ↗
08/20/2026Q00985440-P3Open ↗
08/20/2026Q00985440-P1Open ↗
Showing 3 of 12 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026Q00985440-I1Open ↗
08/13/2026Q00985440-P4Open ↗
08/13/2026Q00985440-P5Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/20/2026Q00985440-P4Open ↗
08/20/2026Q00985440-P1Open ↗
08/20/2026Q00985440-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00985440-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00985440-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00985440-I1Open ↗
▸Other Documents9
▸DOB NOWProperty Ownership Certification4
08/20/2026Q00985440-P4Open ↗
08/20/2026Q00985440-P1Open ↗
08/20/2026Q00985440-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00985440-I1Open ↗
08/13/2026Q00985440-P4Open ↗
08/13/2026Q00985440-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00985440-S7Open ↗