← Back
Elevator apt, fireproof with stores
30-43 31 STREET
QUEENS · Astoria (Central) · BIN 4624081
💬 Discuss this project
2022Year Built
7Stories
D6Building Class
C4-3Zoning
20,802 sfGross Floor Area
19Units
Rent Stabilized0 Open Violations
Elevator apt, fireproof with stores · Owner of record: 168 ASTORIA REALTY LLC · 4,000 sf lot · 5.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof6p · 4 filings · 20 docs
Bulkhead4p · 2 filings · 20 docs
Floor 73p · 1 filing · 6 docs
Floor 67p · 3 filings · 20 docs
Floor 57p · 3 filings · 20 docs
Floor 47p · 3 filings · 20 docs
Floor 37p · 3 filings · 20 docs
Floor 24p · 2 filings · 20 docs
Floor 14p · 2 filings · 20 docs
Cellar6p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JASCO407/08/2026
168 ASTORIA REALTY2903/22/2026
99 CONSTRUCTION1803/22/2026
WINWAY DEVELOPMENT103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/30/2019$3.2M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRL SKYLINE803/21/2026
CNY ENGINEERING PC1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
99 CONSTRUCTION INCGeneral Contractor1907/08/2026
WINWAY DEVELOPMENT LLCGeneral Contractor707/08/2026
CATMAN PLUMBING INCPlumbing207/08/2026
XH&RC PLBG AND HTG INCFire Protection107/08/2026
JASCO, INCGeneral Contractor107/08/2026
L2 CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A & T DESIGN GROUP LLC1088701/23/2024
Building Lifecycle
All (126)Filed (21)Permit Issued (17)Signed Off (8)Violation (20)Inspection (8)Objection (22)Special Inspection (30)
03/27/2024
Signed off — Alteration
Install new plumbing and sprinkler system for new 7-story mix use building in conjunction with NB Job #421779132. No change in use, egress and occupancy.
Q00319341-I1
03/19/2024
Signed off — Alteration
INSTALL NEW HVAC SYSTEM FOR MIXED USE 7 STORIES BUILDING IN CONJUNCTION WITH NB JOB#421779132. NO CHANGE OF EGRESS, OCCUPANCY.
Q00319348-I1
02/08/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
01/30/2024
Special inspection requirement — HVAC insulation and sealing
ROBERT LIN
01/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT LIN
01/30/2024
Special inspection requirement — Sprinkler Systems
ROBERT LIN
01/30/2024
Special inspection requirement — Fire-Resistance Rated Construction
ROBERT LIN
01/30/2024
Special inspection requirement — Energy Code Compliance Inspections
ROBERT LIN
01/30/2024
Special inspection requirement — HVAC and service water heating system controls
ROBERT LIN
01/30/2024
Special inspection requirement — HVAC and service water heating equipment
ROBERT LIN
01/23/2024
Filed — Alteration
Install new plumbing and sprinkler system for new 7-story mix use building in conjunction with NB Job #421779132. No change in use, egress and occupancy.
Q00319341-P5
01/10/2024
Inspection — Fail-Final SP - Up to 9 Requested Floors
Fail
View inspection ↗
01/10/2024
Special inspection requirement — HVAC and service water heating equipment
ROBERT LIN
01/10/2024
Special inspection requirement — Fire-Resistance Rated Construction
ROBERT LIN
01/10/2024
Special inspection requirement — Energy Code Compliance Inspections
ROBERT LIN
01/10/2024
Special inspection requirement — Sprinkler Systems
ROBERT LIN
01/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT LIN
01/10/2024
Special inspection requirement — HVAC and service water heating system controls
ROBERT LIN
01/10/2024
Special inspection requirement — HVAC insulation and sealing
ROBERT LIN
01/04/2024
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
01/04/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/07/2023
Special inspection requirement — Maintenance information
ROBERT LIN
12/07/2023
Special inspection requirement — Mechanical Systems
ROBERT LIN
12/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT LIN
12/07/2023
Special inspection requirement — Energy Code Compliance Inspections
ROBERT LIN
12/07/2023
Special inspection requirement — Final
ROBERT LIN
12/07/2023
Special inspection requirement — HVAC insulation and sealing
ROBERT LIN
12/07/2023
Special inspection requirement — Shutoff dampers
ROBERT LIN
12/07/2023
Special inspection requirement — Electrical energy consumption
ROBERT LIN
12/07/2023
Special inspection requirement — HVAC and service water heating equipment
ROBERT LIN
12/07/2023
Special inspection requirement — HVAC and service water heating system controls
ROBERT LIN
12/07/2023
Special inspection requirement — Electrical motors
ROBERT LIN
12/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
ROBERT LIN
11/10/2023
Filed — Alteration
INSTALL NEW HVAC SYSTEM FOR MIXED USE 7 STORIES BUILDING IN CONJUNCTION WITH NB JOB#421779132. NO CHANGE OF EGRESS, OCCUPANCY.
Q00319348-P2
10/30/2023
Permit issued — Sprinklers
Q00319341-I1-EW-SP
10/25/2023
Signed off — Alteration
Q00434448-I1
10/25/2023
Signed off — Alteration
1.CLOSED AND RESTORED AN EXISTING CURB CUT 2.INSTALLED A NEW CURB CUT FOR PARKING
Q00411442-I1
10/24/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/23/2023
Objection raised — Scope
10/23/2023
Objection resolved — Addressed
10/23/2023
Special inspection requirement — Maintenance information
ROBERT LIN
10/23/2023
Special inspection requirement — Electrical motors
ROBERT LIN
10/23/2023
Special inspection requirement — HVAC and service water heating equipment
ROBERT LIN
10/23/2023
Special inspection requirement — HVAC and service water heating system controls
ROBERT LIN
10/18/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
10/17/2023
Filed — Alteration
1.CLOSED AND RESTORED AN EXISTING CURB CUT 2.INSTALLED A NEW CURB CUT FOR PARKING
Q00411442-P2
10/03/2023
Signed off — Alteration
Propose seven-story mixed-use building with commercial and community facility uses.
Q00391036-I1
10/03/2023
Objection resolved — Addressed
09/27/2023
Objection raised — Scope
09/19/2023
Filed — Alteration
1.CLOSED AND RESTORED AN EXISTING CURB CUT 2.INSTALLED A NEW CURB CUT FOR PARKING
Q00411442-P1
09/10/2023
Signed off — Alteration
PROPOSED INSTALLATION OF SUPPORT OF SCAFFOLD AS PER PLANS. IN CONJUNCTION WITH DOB NB APPLICATION #: 421779132. NO CHANGE IN USE, OCCUPANCY, BULK, OR EGRESS
Q00777276-I1
09/10/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FOOT. THE SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, BULK, OR EGRESS
Q00725248-I1
09/01/2023
Permit issued — Mechanical Systems
Q00319348-I1-MS
08/23/2023
Signed off — Alteration
Q00494353-I1
07/17/2023
Filed — Alteration
Install new plumbing and sprinkler system for new 7-story mix use building in conjunction with NB Job #421779132. No change in use, egress and occupancy.
Q00319341-P4
05/23/2023
Violation issued (ECB, closed)
Construction
05/23/2023
Violation issued (ECB, closed)
Site Safety
05/23/2023
Violation issued (ECB, closed)
Cranes and Derricks
05/23/2023
Violation issued (ECB, closed)
Construction
04/21/2023
Permit issued — Sidewalk Shed
Q00725248-I1-SH
Latest 60 of 126 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offXH&RC PLBG AND HTG INC10/30/2023
DOB NOWMechanical SystemsSigned-offSONG DONG09/01/2023
DOB NOWSidewalk ShedSigned-offSONG DONG04/21/2023
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC04/18/2023
DOB NOWConstruction FenceSigned-offSONG DONG03/21/2023
DOB NOWStructuralSigned-offSONG DONG08/28/2022
DOB NOWMechanical SystemsSigned-offSONG DONG08/26/2022
DOB NOWSupported ScaffoldSigned-offWINWAY DEVELOPMENT LLC07/19/2022
DOB NOWStructuralSigned-offSONG DONG06/13/2022
DOB NOWCurb CutSigned-offSONG DONG06/10/2022
DOB NOWMechanical SystemsSigned-offSONG DONG06/10/2022
DOB NOWSidewalk ShedSigned-offWINWAY DEVELOPMENT LLC04/26/2022
DOB NOWSprinklersSigned-offCATMAN PLUMBING INC01/21/2022
DOB NOWConstruction FenceSigned-offWINWAY DEVELOPMENT LLC01/06/2022
DOB NOWConstruction FenceSigned-offSONG DONG10/15/2021
DOB NOWSidewalk ShedSigned-offJASCO, INC03/29/2021
DOB NOWConstruction FenceSigned-offL2 CONSTRUCTION INC02/19/2021
BIS—ISSUED99 CONSTRUCTION INC09/01/2023
BIS—ISSUED99 CONSTRUCTION INC01/20/2023
BIS—ISSUED99 CONSTRUCTION INC08/26/2022
BIS—ISSUED99 CONSTRUCTION INC01/21/2022
BIS—ISSUED99 CONSTRUCTION INC09/13/2021
BIS—ISSUED99 CONSTRUCTION INC09/13/2021
BISPLISSUEDARIANA CONTRACTING INC11/19/2003
3 projects · most recent 04/15/2022
General Wiring
FiledStatusContractorScope
04/15/2022CompleteKJK ELECTRIC INCGeneral Wiring
03/02/2022CompleteKJK ELECTRIC INC—
04/07/2021CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
02/08/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
01/10/2024Fail-Final SP - Up to 9 Requested FloorsFailView ↗
01/04/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
01/04/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/24/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
10/18/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
03/30/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/28/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
01/30/2024HVAC insulation and sealing ROBERT LINenergy_progress
01/30/2024Fire-Resistant Penetrations and JointsROBERT LINspecial
01/30/2024Sprinkler SystemsROBERT LINspecial
01/30/2024Fire-Resistance Rated ConstructionROBERT LINprogress
01/30/2024Energy Code Compliance InspectionsROBERT LINprogress
01/30/2024HVAC and service water heating system controls ROBERT LINenergy_progress
01/30/2024HVAC and service water heating equipment ROBERT LINenergy_progress
01/10/2024HVAC and service water heating equipment ROBERT LINenergy_progress
01/10/2024Fire-Resistance Rated ConstructionROBERT LINprogress
01/10/2024Energy Code Compliance InspectionsROBERT LINprogress
01/10/2024Sprinkler SystemsROBERT LINspecial
01/10/2024Fire-Resistant Penetrations and JointsROBERT LINspecial
01/10/2024HVAC and service water heating system controls ROBERT LINenergy_progress
01/10/2024HVAC insulation and sealing ROBERT LINenergy_progress
12/07/2023Maintenance informationROBERT LINenergy_progress
12/07/2023Mechanical SystemsROBERT LINspecial
12/07/2023Fire-Resistant Penetrations and JointsROBERT LINspecial
12/07/2023Energy Code Compliance InspectionsROBERT LINprogress
12/07/2023FinalROBERT LINprogress
12/07/2023HVAC insulation and sealing ROBERT LINenergy_progress
12/07/2023Shutoff dampersROBERT LINenergy_progress
12/07/2023Electrical energy consumptionROBERT LINenergy_progress
12/07/2023HVAC and service water heating equipment ROBERT LINenergy_progress
12/07/2023HVAC and service water heating system controls ROBERT LINenergy_progress
12/07/2023Electrical motorsROBERT LINenergy_progress
Latest 25 of 53.
▾Documents — 191 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch7
08/27/2026Q00494353-I1Request digital key ↗
08/25/2026Q00725248-P1Request digital key ↗
08/25/2026Q00725248-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
08/27/2026Q00319341-P4Request digital key ↗
08/27/2026Q00319341-P5Request digital key ↗
08/27/2026Q00319341-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
08/27/2026Q00319341-P1Request digital key ↗
08/27/2026Q00319341-P5Request digital key ↗
08/27/2026Q00319341-P4Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/26/2026Q00319348-I1Request digital key ↗
08/26/2026Q00319348-P1Request digital key ↗
08/26/2026Q00319348-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut3
08/15/2026Q00411442-P2Request digital key ↗
08/15/2026Q00411442-P1Request digital key ↗
08/15/2026Q00411442-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/27/2026Q00391036-I1Request digital key ↗
08/14/2026Q00391036-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00434448-I1Request digital key ↗
▸Applications & Permits32
▸BISPLAN / WORK APPROVAL APPLICATION23
03/28/2025440594787Open ↗
06/24/2024421779132Open ↗
06/20/2024421779132Open ↗
Showing 3 of 23 on file for this type
▸BISWORK PERMIT APPLICATION4
05/26/2022421779132Open ↗
10/06/2021421779132Open ↗
10/06/2021421779132Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation4
08/30/2023440594787Open ↗
08/28/2023440594787Open ↗
11/17/2020440594787Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/13/2023421779132Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
09/12/2023421779132Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/12/2023421779132Open ↗
▸Seals & Professional Certifications38
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/27/2026Q00411442-I1Open ↗
08/27/2026Q00411442-P1Open ↗
08/27/2026Q00319341-P1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026Q00319341-P5Open ↗
09/02/2026Q00319341-P5Open ↗
09/01/2026Q00319348-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026Q00319341-P5Open ↗
09/01/2026Q00319348-P2Open ↗
08/26/2026Q00319348-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/06/2021421779132Open ↗
03/13/2020421779132Open ↗
▸Trade Schedules & Equipment4
▸BISHEATING SYSTEMS1
01/30/2024421779132Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
01/30/2024421779132Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/30/2024421779132Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/10/2024421779132Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREES SITE PLAN1
09/12/2023421779132Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
01/30/2024421779132Open ↗
▸BISSTREET TREE CHECKLIST1
08/24/2020421779132Open ↗
▸BISSTREET TREE SIGNOFF1
05/25/2023421779132Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026Q00391036-I1Open ↗
08/14/2026Q00391036-P1Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/06/2021421779132Open ↗
03/13/2020421779132Open ↗
▸BISFENESTRATION AIR LEAKAGE1
01/30/2024421779132Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
01/30/2024421779132Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
08/24/2020421779132Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/30/2024421779132Open ↗
▸BISFENESTRATION AREAS1
01/30/2024421779132Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
01/30/2024421779132Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/23/2021421779132Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/30/2024421779132Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/30/2024421779132Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/30/2024421779132Open ↗
▸BISLIGHTING CONTROLS1
01/30/2024421779132Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/30/2024421779132Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00319348-I1Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY5
12/23/2021421779132Open ↗
09/29/2021421779132Open ↗
08/24/2020421779132Open ↗
Showing 3 of 5 on file for this type
▸BISPOST-INSTALLED ANCHORS2
01/30/2024421779132Open ↗
01/30/2024421779132Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
04/03/2024421779132Open ↗
10/06/2021421779132Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
09/12/2023421779132Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
01/30/2024421779132Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/30/2024421779132Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/30/2024421779132Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
01/30/2024421779132Open ↗
▸BISMASONRY1
01/30/2024421779132Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
01/30/2024421779132Open ↗
▸BISSOIL REPORT1
08/24/2020421779132Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
08/24/2020421779132Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
10/06/2021421779132Open ↗
▸Approvals, Objections & Sign-offs13
▸BISSCHEDULE A - OCCUPANCY / USE10
06/24/2024421779132Open ↗
06/20/2024421779132Open ↗
07/07/2023421779132Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/28/2020421779132Open ↗
08/24/2020421779132Open ↗
▸BISSUPERSEDING LETTER1
05/26/2022421779132Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE1
10/06/2021421779132Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
05/26/2022421779132Open ↗
▸Filing & Intake Forms20
▸BISADDITIONAL INFORMATION16
06/26/2024421779132Open ↗
10/31/2023440594787Open ↗
10/11/2023440594787Open ↗
Showing 3 of 16 on file for this type
▸BISBOROUGH INTAKE FORM1
05/26/2022421779132Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/13/2020440594787Open ↗
▸BISEFILING COVER SHEET1
03/13/2020421779132Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/13/2020440594787Open ↗
▸Other Documents9
▸BISSHUTOFF DAMPERS1
01/30/2024421779132Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
08/24/2020421779132Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
01/30/2024421779132Open ↗
▸BISMAINTENANCE INFORMATION1
01/30/2024421779132Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
01/30/2024421779132Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
01/30/2024421779132Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
11/17/2020440594787Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
01/30/2024421779132Open ↗
▸BISAIR BARRIER CONTINUITY PLAN1
01/30/2024421779132Open ↗