← Back
BuildNYC
One story retail building
30-50 77TH STREET
QUEENS · Jackson Heights · BIN 4463821
💬 Discuss this project
1995Year Built
1Stories
K1Building Class
R4Zoning
15,062 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
One story retail building · 26,132 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofAutoZone2p · 2 filings · 20 docs
Floor 1AutoZone7p · 3 filings · 20 docs
MezzanineAutoZone1p · 1 filing · 4 docs
Site & exteriorAutoZone6p · 4 filings · 14 docs
Filed — no permit issuedRevel9p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Muss Development3207/08/2026
Jackson Heights Shopping CTR Co603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Dewberry Engineers104/08/2026
HC Engineering412/22/2021
Paul J Ford and Company209/29/2021
Lewis Ellis108/11/2021
Advanced Consulting Engineers108/11/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JP Expedite803/21/2026
Municipal Building Consultants403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jayeff ConstructionGeneral Contractor507/08/2026
Signs CadSign hanger407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Whitestone Associates1475209/29/2021
Whitestone Associates Engineering8144108/11/2021
Building Lifecycle
All (63)Filed (9)Permit Issued (7)Signed Off (5)Violation (3)Objection (22)Special Inspection (17)
05/04/2026
Objection resolved — Addressed
05/04/2026
Objection resolved — Addressed
05/04/2026
Objection resolved — Addressed
05/04/2026
Objection resolved — Addressed
05/04/2026
Objection resolved — Addressed
05/04/2026
Objection resolved — Addressed
05/04/2026
Objection resolved — Addressed
05/04/2026
Objection resolved — Addressed
04/29/2026
Objection raised — Scope
04/29/2026
Objection raised — Scope
04/29/2026
Objection raised — Scope
04/29/2026
Objection raised — Admin
04/29/2026
Objection raised — Admin
04/29/2026
Objection raised — Other
04/29/2026
Objection raised — Scope
04/29/2026
Objection raised — Admin
04/08/2026
Filed — Alteration
HEREWITH FILING CIVIL/SITE WORK FOR EV CHARGING SITE PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01360926-I1
06/22/2024
Violation issued (FDNY_NOV, closed)
10/13/2023
Signed off — Alteration
Installation of HVAC units and associated ducts and piping. There is no change in occupancy, use, or egress.
Q00550542-I1
09/12/2022
Violation issued (FDNY_NOV, closed)
02/10/2022
Signed off — Alteration
REPLACE NON-ILLUMINATED ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-D @WEST ELEVATION, INSIDE OF PROPERTY LINE, REMOVE A PREVIOUS JOB #401243677, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Q00601057-I1
02/10/2022
Signed off — Alteration
REPLACE ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-C, REMOVE A PREVIOUS JOB #401243702, NO CHANGE TO USE, EGRESS OR OCCUPATION
Q00601044-I1
02/10/2022
Signed off — Alteration
REPLACE NON-ILLUMINATED ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-B @77 ST ELEVATION, REMOVE A PREVIOUS JOB #401243711, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Q00600869-I1
02/10/2022
Signed off — Alteration
REPLACE ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-A, REMOVE A PREVIOUS JOB #401243668, INSIDE OF PROPERTY LINE, NO CHANGE TO USE, EGRESS OR OCCUPATION
Q00600828-I1
12/27/2021
Permit issued — Sign
Q00600828-I1-SG
12/23/2021
Permit issued — Sign
Q00601057-I1-SG
12/23/2021
Permit issued — Sign
Q00601044-I1-SG
12/23/2021
Permit issued — Sign
Q00600869-I1-SG
12/22/2021
Filed — Alteration
REPLACE NON-ILLUMINATED ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-D @WEST ELEVATION, INSIDE OF PROPERTY LINE, REMOVE A PREVIOUS JOB #401243677, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Q00601057-I1
12/22/2021
Filed — Alteration
REPLACE ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-C, REMOVE A PREVIOUS JOB #401243702, NO CHANGE TO USE, EGRESS OR OCCUPATION
Q00601044-I1
12/22/2021
Filed — Alteration
REPLACE NON-ILLUMINATED ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-B @77 ST ELEVATION, REMOVE A PREVIOUS JOB #401243711, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Q00600869-I1
12/22/2021
Filed — Alteration
REPLACE ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-A, REMOVE A PREVIOUS JOB #401243668, INSIDE OF PROPERTY LINE, NO CHANGE TO USE, EGRESS OR OCCUPATION
Q00600828-I1
10/01/2021
Permit issued — Structural
Q00550565-I1-ST
10/01/2021
Permit issued — General Construction
Q00554166-I1-GC
10/01/2021
Permit issued — Mechanical Systems
Q00550542-I1-MS
09/30/2021
Special inspection requirement — Structural Steel - Welding
Kevin Feath
09/30/2021
Special inspection requirement — Masonry
Kevin Feath
09/30/2021
Special inspection requirement — Structural Cold-Formed Steel
Kevin Feath
09/30/2021
Special inspection requirement — Structural Steel - Details
Kevin Feath
09/30/2021
Special inspection requirement — Final
Kevin Feath
09/29/2021
Filed — Alteration
Structural scope as per plans filed. There is no change in occupancy, use, or egress.
Q00550565-P1
09/29/2021
Special inspection requirement — Structural Steel - Welding
Kevin Feath
09/29/2021
Special inspection requirement — Masonry
Kevin Feath
09/29/2021
Special inspection requirement — Structural Cold-Formed Steel
Kevin Feath
09/29/2021
Special inspection requirement — Structural Steel - Details
Kevin Feath
09/29/2021
Special inspection requirement — Final
Kevin Feath
09/27/2021
Special inspection requirement — Final
Hackjong Choi
09/27/2021
Special inspection requirement — Final
Hackjong Choi
09/27/2021
Special inspection requirement — Final
Hackjong Choi
09/27/2021
Special inspection requirement — Final
Hackjong Choi
08/18/2021
Filed — Alteration
Structural scope as per plans filed. There is no change in occupancy, use, or egress.
Q00550565-I1
08/13/2021
Objection raised — Energy
08/13/2021
Objection resolved — Addressed
08/13/2021
Objection raised — Scope
08/13/2021
Objection resolved — Addressed
08/13/2021
Objection raised — Scope
08/13/2021
Objection resolved — Addressed
08/11/2021
Filed — Alteration
Installation of HVAC units and associated ducts and piping. There is no change in occupancy, use, or egress.
Q00550542-I1
08/11/2021
Filed — Alteration
Q00554166-I1
07/08/2021
Special inspection requirement — Final
Kevin Feath
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offSigns Cad12/27/2021
DOB NOWSignSigned-offSigns Cad12/23/2021
DOB NOWSignSigned-offSigns Cad12/23/2021
DOB NOWSignSigned-offSigns Cad12/23/2021
DOB NOWStructuralPermit IssuedJayeff Construction10/01/2021
DOB NOWGeneral ConstructionPermit IssuedJayeff Construction10/01/2021
DOB NOWMechanical SystemsSigned-offJayeff Construction10/01/2021
BIS—RE-ISSUEDBerger Sign Fabrication06/28/2001
BIS—RE-ISSUEDBerger Sign Fabrication06/28/2001
BIS—RE-ISSUEDBerger Sign Fabrication06/28/2001
BISOTRE-ISSUEDBerger Sign Fabrication06/28/2001
BISPLISSUEDAspro PLG03/29/1996
BIS—ISSUEDSpectrum Signs03/12/1996
BIS—ISSUEDSpectrum Signs03/12/1996
BIS—ISSUEDSpectrum Signs03/12/1996
BIS—ISSUEDSpectrum Signs12/07/1995
BIS—ISSUEDSpectrum Signs12/07/1995
BIS—ISSUEDHM and JLM Development Co04/14/1995
BISPLISSUEDAspro Mechanical Contracting04/13/1995
BIS—ISSUEDHM and JLM Development Co03/08/1995
BISEQISSUEDHM and JLM Development Co10/21/1994
4 projects · most recent 08/02/2022
General Wiring
FiledStatusContractorScope
08/02/2022CompleteAFA Protective SystemsGeneral Wiring
12/29/2021CompleteSigns Cad—
12/29/2021CompleteSigns Cad—
10/05/2021CompleteIlluminations Unlmtd ElectricGeneral Wiring
2 projects · most recent 04/08/2026
Steel Concrete Masonry
FiledStatusContractorScope
04/08/2026——1 scope_items
09/29/2021Permit IssuedJayeff ConstructionSteel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
09/30/2021Structural Steel - WeldingKevin Feathspecial
09/30/2021MasonryKevin Feathspecial
09/30/2021Structural Cold-Formed SteelKevin Feathspecial
09/30/2021Structural Steel - DetailsKevin Feathspecial
09/30/2021FinalKevin Feathprogress
09/29/2021Structural Steel - WeldingKevin Feathspecial
09/29/2021MasonryKevin Feathspecial
09/29/2021Structural Cold-Formed SteelKevin Feathspecial
09/29/2021Structural Steel - DetailsKevin Feathspecial
09/29/2021FinalKevin Feathprogress
09/27/2021FinalHackjong Choiprogress
09/27/2021FinalHackjong Choiprogress
09/27/2021FinalHackjong Choiprogress
09/27/2021FinalHackjong Choiprogress
07/08/2021FinalKevin Feathprogress
07/01/2021FinalKevin Feathprogress
07/01/2021Mechanical SystemsKevin Feathspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
AutoZoneRetailFloor 1
Project Q00600828 Alteration · LOC Issued · 12/22/2021
Project Q00600869 Alteration · LOC Issued · 12/22/2021
Project Q00601044 Alteration · LOC Issued · 12/22/2021
Project Q00601057 Alteration · LOC Issued · 12/22/2021
Project Q00550565 Alteration · Permit Entire · 08/18/2021
Project Q00550542 Alteration · LOC Issued · 08/11/2021
Project Q00554166 Alteration · Permit Entire · 08/11/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/27/2026Q00554166-I1Request digital key ↗
08/27/2026Q00550565-I1Request digital key ↗
08/27/2026Q00550565-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/29/2026Q01360926-I1Open ↗
08/27/2026Q00550542-I1Open ↗
08/27/2026Q00550565-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/29/2026Q00550565-I1Open ↗
08/29/2026Q00550565-I1Open ↗
08/29/2026Q00550565-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026Q00601044-I1Open ↗
08/29/2026Q00554166-I1Open ↗
08/29/2026Q00550565-I1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026Q00550565-I1Open ↗
08/14/2026Q00550542-I1Open ↗
08/13/2026Q00550565-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00550542-I1Open ↗