DOB07/15/2021UNABLE TO VERIFY WORK DONE UNDER LAA# Q00540315 DUE TO NO ACCESS AND UNRESPONSIVE AUDIT OBJECTIONS. 0% WORK DONE
HPD03/12/2011§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEYOPERATED LOCK INSTALLED IN THE ENTRANCE LOCATED AT APT 2FT, 2nd STORY
HPD08/13/1985D26-19.07 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 50 WATTS INCANDESCENT OR EQUIVALENT.
Three families · 2,504 sf lot · 1.63 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.