| Owner | Filings | Most Recent |
|---|---|---|
| 3055 VERNON | 115 | 09/13/2026 |
| OWNERS REP | 10 | 07/08/2026 |
| ALBA SERVICES | 4 | 07/08/2026 |
| 6241 FOREST AVE LLC | 7 | 03/22/2026 |
| PIONEER PROPERTY GROUP LL | 5 | 03/22/2026 |
| VERNON SUTTON INC | 10 | 03/22/2026 |
| AA LLC CONSTRUCTION MNGT | 3 | 03/22/2026 |
| CONSTRUCTION MNGT AA | 3 | 03/22/2026 |
| EASTONE 26 AVE LLC | 1 | 03/22/2026 |
| C/O CONTRACTORS SUPPLY | 2 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| HPL ENGINEERING P.C. | 19 | 08/11/2026 |
| JIAN ENGINEERING PLLC | 3 | 06/25/2026 |
| HIDAMARI ENGINEERING SERVICES, P.C. | 6 | 01/22/2025 |
| PHILIP HABIB & ASSOCIATES | 1 | 10/18/2024 |
| GEORGE J. XERAKIAS, PE | 1 | 06/12/2024 |
| ASHRAF CORP | 3 | 03/19/2024 |
| PAUL PERDEK, PROF. ENG. PLLC | 6 | 07/31/2023 |
| ETTINGER ENGINEERING ASSOCIATES | 4 | 05/19/2023 |
| KN3 ENGINEERING LLC | 1 | 05/04/2023 |
| LU ENGINEERING SERVICE PC | 4 | 12/30/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| H Z BUILDING NY | 66 | 03/21/2026 |
| AE DESIGN SOLUTION | 14 | 03/21/2026 |
| Rigid Structural Design, LLC | 2 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 1 | 03/21/2026 |
| KD DESIGNS | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| CONSTRUCTION MNGT. AA,LLC | General Contractor | 40 | 07/08/2026 |
| CORE SCAFFOLD SYSTEMS INC. | General Contractor | 11 | 07/08/2026 |
| LIS PIPING SOLUTION INC | Fire Protection | 6 | 07/08/2026 |
| STREAM PLUMBING INC | Plumbing | 3 | 07/08/2026 |
| TRI BOROUGH SCAFFOLDING | General Contractor | 3 | 03/21/2026 |
| ALBA SERVICES INC | General Contractor | 2 | 07/08/2026 |
| INTERSYSTEMS INSTAL S&S | General Contractor | 1 | 07/08/2026 |
| RIGHTWAY ELECTRICAL INC | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| HPL ENGINEERING PC | 5613 | 23 | 01/22/2025 |
| GEORGE J. XERAKIAS, PE | 1658 | 1 | 06/12/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Curb Cut | Signed-off | CONSTRUCTION MNGT. AA,LLC | 04/28/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | SKYLINE WINDOWS, LLC | 03/06/2025 |
| DOB NOW | Plumbing | Signed-off | STREAM PLUMBING INC | 01/17/2025 |
| DOB NOW | Standpipe | Signed-off | LIS PIPING SOLUTION INC | 01/17/2025 |
| DOB NOW | Standpipe | Signed-off | LIS PIPING SOLUTION INC | 01/16/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | CONSTRUCTION MNGT. AA,LLC | 01/15/2025 |
| DOB NOW | General Construction | Signed-off | CONSTRUCTION MNGT. AA,LLC | 11/27/2024 |
| DOB NOW | General Construction | Permit Issued | CONSTRUCTION MNGT. AA,LLC | 11/25/2024 |
| DOB NOW | Construction Fence | Signed-off | CONSTRUCTION MNGT. AA,LLC | 11/07/2024 |
| DOB NOW | General Construction | Signed-off | CONSTRUCTION MNGT. AA,LLC | 11/06/2024 |
| DOB NOW | General Construction | Permit Issued | CONSTRUCTION MNGT. AA,LLC | 11/06/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | CORE SCAFFOLD SYSTEMS INC | 07/22/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | SKYLINE WINDOWS, LLC | 06/14/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | CORE SCAFFOLD SYSTEMS INC | 04/30/2024 |
| DOB NOW | Standpipe | Signed-off | LIS PIPING SOLUTION INC | 04/24/2024 |
| DOB NOW | Plumbing | Signed-off | STREAM PLUMBING INC | 02/13/2024 |
| DOB NOW | Standpipe | Signed-off | LIS PIPING SOLUTION INC | 02/12/2024 |
| DOB NOW | Sprinklers | Signed-off | LIS PIPING SOLUTION INC | 02/12/2024 |
| DOB NOW | General Construction | Permit Issued | CONSTRUCTION MNGT. AA,LLC | 11/16/2023 |
| DOB NOW | Structural | Signed-off | CONSTRUCTION MNGT. AA,LLC | 11/06/2023 |
| DOB NOW | Support of Excavation | Signed-off | CONSTRUCTION MNGT. AA,LLC | 11/06/2023 |
| DOB NOW | Construction Fence | Signed-off | CONSTRUCTION MNGT. AA,LLC | 11/06/2023 |
| DOB NOW | Supported Scaffold | Signed-off | INTERSYSTEMS INSTAL S&S | 10/24/2023 |
| DOB NOW | Structural | Signed-off | CONSTRUCTION MNGT. AA,LLC | 10/23/2023 |
| DOB NOW | Support of Excavation | Signed-off | CONSTRUCTION MNGT. AA,LLC | 10/23/2023 |
| DOB NOW | Structural | Signed-off | CONSTRUCTION MNGT. AA,LLC | 10/23/2023 |
| DOB NOW | General Construction | Permit Issued | CONSTRUCTION MNGT. AA,LLC | 10/17/2023 |
| DOB NOW | Construction Fence | Signed-off | CONSTRUCTION MNGT. AA,LLC | 10/16/2023 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | CORE SCAFFOLD SYSTEMS INC | 07/31/2023 |
| DOB NOW | General Construction | Permit Issued | CONSTRUCTION MNGT. AA,LLC | 05/18/2023 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | CORE SCAFFOLD SYSTEMS INC | 05/04/2023 |
| DOB NOW | Sidewalk Shed | Signed-off | CORE SCAFFOLD SYSTEMS INC | 05/04/2023 |
| DOB NOW | Standpipe | Signed-off | LIS PIPING SOLUTION INC | 04/28/2023 |
| DOB NOW | Structural | Signed-off | CONSTRUCTION MNGT. AA,LLC | 04/12/2023 |
| DOB NOW | Structural | Signed-off | CONSTRUCTION MNGT. AA,LLC | 03/23/2023 |
| DOB NOW | Plumbing | Signed-off | STREAM PLUMBING INC | 03/10/2023 |
| DOB NOW | Foundation | Signed-off | CONSTRUCTION MNGT. AA,LLC | 12/15/2022 |
| DOB NOW | Support of Excavation | Signed-off | CONSTRUCTION MNGT. AA,LLC | 12/02/2022 |
| DOB NOW | Structural | Signed-off | ALBA SERVICES INC | 10/28/2022 |
| DOB NOW | Construction Fence | Signed-off | ALBA SERVICES INC | 10/21/2022 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/11/2026 | Signed-off | CONSTRUCTION MNGT. AA,LLC | Heating and Air Conditioning Systems | Heat / Cool Gree GMV-36WL/B-T(U) 45,000 BTU · Vrf Outdoor ×88 GMV-48WL/B-T(U) 54,000 BTU · Vrf Outdoor ×35 GMV-72WM/B-F(U) 77,000 BTU · Vrf Outdoor ×3 GMV-24WL/C-T 28,000 BTU · Vrf Outdoor ×2 3VIR12HP230V1BO 12,000 BTU · Condensing Unit ×1 3VIR24HP230V1BO 24,000 BTU · Condensing Unit ×1 GMV-60WL/C-T(U) 64,000 BTU · Vrf Outdoor ×1 GMV-VQ72W/A-F(U) 77,000 BTU · Vrf Outdoor ×1 GWV-24WL/C-T(U) 24,000 BTU · Condensing Unit ×59 GWV-36WL/C-T(U) 37,500 BTU · Condensing Unit ×41 GWV-48WL/A-T(U) 48,000 BTU · Condensing Unit ×13 GWV-24WL/A-T(U) 24,000 BTU · Vrf Outdoor ×9 GWV-72WM/B-T(U) 72,000 BTU · Vrf Outdoor ×3 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2026 | Signed-off | LIS PIPING SOLUTION INC | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2026 | Signed-off | STREAM PLUMBING INC | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/14/2026 | Permit Issued | L.D.M. ELECTL CONTRS INC | General Wiring |
| 04/25/2025 | Complete | RIGHTWAY ELECTRICAL INC | General Wiring |
| 08/01/2023 | Complete | KJK ELECTRIC INC | — |
| 05/03/2023 | Complete | SOLAS ELECTRICAL CORP | — |
| 05/03/2023 | Complete | SOLAS ELECTRICAL CORP | — |
| 12/28/2022 | Complete | RIGHTWAY ELECTRICAL INC | 1 meters, 1 new_meters |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2026 | Signed-off | CONSTRUCTION MNGT. AA,LLC | Concrete, Masonry |
| — | — | — | 1 scope_items |
| Date | Type | Result | Report |
|---|---|---|---|
| 05/09/2025 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 03/14/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/03/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 02/13/2025 | Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test | Certified | View ↗ |
| 02/13/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/13/2025 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 02/11/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/11/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/11/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 03/05/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/30/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/05/2023 | Certified StandPipe - SD - Alarm Sys 64/09 - Finish | Certified | View ↗ |
| 08/05/2023 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 06/07/2023 | Pass-Final PL - Underground | Pass | View ↗ |
| 04/05/2023 | Pass-Final PL - Underground | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/27/2026 | Air barrier - visual inspection | — | energy_progress |
| 08/27/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 08/27/2026 | Lowest Floor Elevation | — | progress |
| 08/27/2026 | Fenestration areas | — | energy_progress |
| 08/27/2026 | Fenestration air leakage | — | energy_progress |
| 08/27/2026 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 08/27/2026 | Insulation placement and R values | — | energy_progress |
| 03/23/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 03/23/2026 | Insulation placement and R values | — | energy_progress |
| 03/23/2026 | Fenestration areas | — | energy_progress |
| 03/23/2026 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 03/23/2026 | Fenestration air leakage | — | energy_progress |
| 03/23/2026 | Air barrier - visual inspection | — | energy_progress |
| 03/23/2026 | Lowest Floor Elevation | — | progress |
| 11/11/2025 | Fenestration areas | — | energy_progress |
| 11/11/2025 | Structural Stability – Alterations of existing buildings | — | special |
| 11/11/2025 | Lowest Floor Elevation | — | progress |
| 11/11/2025 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 11/11/2025 | Insulation placement and R values | — | energy_progress |
| 11/11/2025 | Air barrier - visual inspection | — | energy_progress |
| 11/11/2025 | Fenestration air leakage | — | energy_progress |
| 08/25/2025 | Lowest Floor Elevation | — | progress |
| 08/25/2025 | Fenestration air leakage | — | energy_progress |
| 08/25/2025 | Insulation placement and R values | — | energy_progress |
| 08/25/2025 | Air barrier - visual inspection | — | energy_progress |