← Back
Elevator apt, converted
30-55 VERNON BOULEVARD
QUEENS · BIN 4005484
💬 Discuss this project
1961Year Built
2Stories
D5Building Class
R5BZoning
158,375 sfGross Floor Area
122Units
0 Open ViolationsFDNY Report ↗
Elevator apt, converted · Owner of record: 3055 VERNON LLC · 37,116 sf lot · 4.27 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof165p · 1 filing · 20 docs
Floor 9160p · 1 filing · 20 docs
Floor 8163p · 1 filing · 20 docs
Floor 7153p · 1 filing · 20 docs
Floor 6161p · 1 filing · 20 docs
Floor 5159p · 1 filing · 20 docs
Floor 4162p · 1 filing · 20 docs
Floor 3160p · 1 filing · 20 docs
Floor 2161p · 1 filing · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3055 VERNON11509/13/2026
OWNERS REP1007/08/2026
ALBA SERVICES407/08/2026
6241 FOREST AVE LLC703/22/2026
PIONEER PROPERTY GROUP LL503/22/2026
VERNON SUTTON INC1003/22/2026
AA LLC CONSTRUCTION MNGT303/22/2026
CONSTRUCTION MNGT AA303/22/2026
EASTONE 26 AVE LLC103/22/2026
C/O CONTRACTORS SUPPLY203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z BUILDING NY6603/21/2026
AE DESIGN SOLUTION1403/21/2026
Rigid Structural Design, LLC203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
KD DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSTRUCTION MNGT. AA,LLCGeneral Contractor4007/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor1107/08/2026
LIS PIPING SOLUTION INCFire Protection607/08/2026
STREAM PLUMBING INCPlumbing307/08/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor303/21/2026
ALBA SERVICES INCGeneral Contractor207/08/2026
INTERSYSTEMS INSTAL S&SGeneral Contractor107/08/2026
RIGHTWAY ELECTRICAL INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC56132301/22/2025
GEORGE J. XERAKIAS, PE1658106/12/2024
Building Lifecycle
All (230)Filed (47)Permit Issued (42)Signed Off (16)Violation (36)Inspection (15)Objection (44)Special Inspection (30)
08/27/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/27/2026
Special inspection requirement — Insulation placement and R values
08/27/2026
Special inspection requirement — Air barrier - visual inspection
08/27/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
08/27/2026
Special inspection requirement — Fenestration air leakage
08/27/2026
Special inspection requirement — Lowest Floor Elevation
08/27/2026
Special inspection requirement — Fenestration areas
08/11/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 9 STORY MIX-USE BUILDING WITH HORIZONTAL AND VERTICAL ENLARGEMENT. OBTAIN NEW C OF O.
Q00795057-C2
08/10/2026
Objection resolved — Resolved
08/10/2026
Objection resolved — Resolved
08/10/2026
Objection resolved — Resolved
08/10/2026
Objection resolved — Resolved
07/31/2026
Objection raised — Fire_Protection
07/31/2026
Objection raised — Fire_Protection
07/31/2026
Objection raised — Scope
07/31/2026
Objection raised — Structural
07/31/2026
Objection raised — Inspections
07/31/2026
Objection raised — Fire_Protection
07/31/2026
Objection raised — Fire_Protection
06/25/2026
Filed — Alteration
Q01415489-I1
04/23/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 9 STORY MIX-USE BUILDING WITH HORIZONTAL AND VERTICAL ENLARGEMENT. OBTAIN NEW C OF O.
Q00795057-C1
04/01/2026
Objection resolved — Addressed
03/29/2026
Objection raised — Other
03/23/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 9 STORY MIX-USE BUILDING WITH HORIZONTAL AND VERTICAL ENLARGEMENT. OBTAIN NEW C OF O.
Q00795057-B9
03/23/2026
Special inspection requirement — Lowest Floor Elevation
03/23/2026
Special inspection requirement — Insulation placement and R values
03/23/2026
Special inspection requirement — Fenestration areas
03/23/2026
Special inspection requirement — Fenestration air leakage
03/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/23/2026
Special inspection requirement — Air barrier - visual inspection
02/10/2026
Objection raised — Admin
01/15/2026
Objection resolved — Resolved
01/09/2026
Objection raised — Zoning
12/10/2025
Objection resolved — Resolved
12/05/2025
Objection raised — Admin
11/11/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 9 STORY MIX-USE BUILDING WITH HORIZONTAL AND VERTICAL ENLARGEMENT. OBTAIN NEW C OF O.
Q00795057-B8
11/11/2025
Special inspection requirement — Insulation placement and R values
11/11/2025
Special inspection requirement — Air barrier - visual inspection
11/11/2025
Special inspection requirement — Lowest Floor Elevation
11/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
11/11/2025
Special inspection requirement — Fenestration areas
11/11/2025
Special inspection requirement — Fenestration air leakage
11/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
11/05/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 9 STORY MIX-USE BUILDING WITH HORIZONTAL AND VERTICAL ENLARGEMENT. OBTAIN NEW C OF O.
Q00795057-S7
09/24/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 9 STORY MIX-USE BUILDING WITH HORIZONTAL AND VERTICAL ENLARGEMENT. OBTAIN NEW C OF O.
Q00795057-Z3
09/23/2025
Objection raised — Other
09/23/2025
Objection resolved — Addressed
09/22/2025
Objection raised — Admin
09/22/2025
Objection resolved — Addressed
08/25/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 9 STORY MIX-USE BUILDING WITH HORIZONTAL AND VERTICAL ENLARGEMENT. OBTAIN NEW C OF O.
Q00795057-B5
08/25/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
08/25/2025
Special inspection requirement — Fenestration air leakage
08/25/2025
Special inspection requirement — Fenestration areas
08/25/2025
Special inspection requirement — Insulation placement and R values
08/25/2025
Special inspection requirement — Lowest Floor Elevation
08/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/25/2025
Special inspection requirement — Air barrier - visual inspection
05/09/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/06/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 9 STORY MIX-USE BUILDING WITH HORIZONTAL AND VERTICAL ENLARGEMENT. OBTAIN NEW C OF O.
Q00795057-S8
Latest 60 of 230 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offCONSTRUCTION MNGT. AA,LLC04/28/2025
DOB NOWSuspended ScaffoldSigned-offSKYLINE WINDOWS, LLC03/06/2025
DOB NOWPlumbingSigned-offSTREAM PLUMBING INC01/17/2025
DOB NOWStandpipeSigned-offLIS PIPING SOLUTION INC01/17/2025
DOB NOWStandpipeSigned-offLIS PIPING SOLUTION INC01/16/2025
DOB NOWMechanical SystemsPermit IssuedCONSTRUCTION MNGT. AA,LLC01/15/2025
DOB NOWGeneral ConstructionSigned-offCONSTRUCTION MNGT. AA,LLC11/27/2024
DOB NOWGeneral ConstructionPermit IssuedCONSTRUCTION MNGT. AA,LLC11/25/2024
DOB NOWConstruction FenceSigned-offCONSTRUCTION MNGT. AA,LLC11/07/2024
DOB NOWGeneral ConstructionSigned-offCONSTRUCTION MNGT. AA,LLC11/06/2024
DOB NOWGeneral ConstructionPermit IssuedCONSTRUCTION MNGT. AA,LLC11/06/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/22/2024
DOB NOWSuspended ScaffoldSigned-offSKYLINE WINDOWS, LLC06/14/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC04/30/2024
DOB NOWStandpipeSigned-offLIS PIPING SOLUTION INC04/24/2024
DOB NOWPlumbingSigned-offSTREAM PLUMBING INC02/13/2024
DOB NOWStandpipeSigned-offLIS PIPING SOLUTION INC02/12/2024
DOB NOWSprinklersSigned-offLIS PIPING SOLUTION INC02/12/2024
DOB NOWGeneral ConstructionPermit IssuedCONSTRUCTION MNGT. AA,LLC11/16/2023
DOB NOWStructuralSigned-offCONSTRUCTION MNGT. AA,LLC11/06/2023
DOB NOWSupport of ExcavationSigned-offCONSTRUCTION MNGT. AA,LLC11/06/2023
DOB NOWConstruction FenceSigned-offCONSTRUCTION MNGT. AA,LLC11/06/2023
DOB NOWSupported ScaffoldSigned-offINTERSYSTEMS INSTAL S&S10/24/2023
DOB NOWStructuralSigned-offCONSTRUCTION MNGT. AA,LLC10/23/2023
DOB NOWSupport of ExcavationSigned-offCONSTRUCTION MNGT. AA,LLC10/23/2023
DOB NOWStructuralSigned-offCONSTRUCTION MNGT. AA,LLC10/23/2023
DOB NOWGeneral ConstructionPermit IssuedCONSTRUCTION MNGT. AA,LLC10/17/2023
DOB NOWConstruction FenceSigned-offCONSTRUCTION MNGT. AA,LLC10/16/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/31/2023
DOB NOWGeneral ConstructionPermit IssuedCONSTRUCTION MNGT. AA,LLC05/18/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC05/04/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC05/04/2023
DOB NOWStandpipeSigned-offLIS PIPING SOLUTION INC04/28/2023
DOB NOWStructuralSigned-offCONSTRUCTION MNGT. AA,LLC04/12/2023
DOB NOWStructuralSigned-offCONSTRUCTION MNGT. AA,LLC03/23/2023
DOB NOWPlumbingSigned-offSTREAM PLUMBING INC03/10/2023
DOB NOWFoundationSigned-offCONSTRUCTION MNGT. AA,LLC12/15/2022
DOB NOWSupport of ExcavationSigned-offCONSTRUCTION MNGT. AA,LLC12/02/2022
DOB NOWStructuralSigned-offALBA SERVICES INC10/28/2022
DOB NOWConstruction FenceSigned-offALBA SERVICES INC10/21/2022
+ 4 more permits on file
1 project · most recent 08/11/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/11/2026Signed-offCONSTRUCTION MNGT. AA,LLCHeating and Air Conditioning Systems
Heat / Cool
Gree GMV-36WL/B-T(U) 45,000 BTU · Vrf Outdoor ×88
GMV-48WL/B-T(U) 54,000 BTU · Vrf Outdoor ×35
GMV-72WM/B-F(U) 77,000 BTU · Vrf Outdoor ×3
GMV-24WL/C-T 28,000 BTU · Vrf Outdoor ×2
3VIR12HP230V1BO 12,000 BTU · Condensing Unit ×1
3VIR24HP230V1BO 24,000 BTU · Condensing Unit ×1
GMV-60WL/C-T(U) 64,000 BTU · Vrf Outdoor ×1
GMV-VQ72W/A-F(U) 77,000 BTU · Vrf Outdoor ×1
GWV-24WL/C-T(U) 24,000 BTU · Condensing Unit ×59
GWV-36WL/C-T(U) 37,500 BTU · Condensing Unit ×41
GWV-48WL/A-T(U) 48,000 BTU · Condensing Unit ×13
GWV-24WL/A-T(U) 24,000 BTU · Vrf Outdoor ×9
GWV-72WM/B-T(U) 72,000 BTU · Vrf Outdoor ×3
1 project · most recent 08/11/2026
Sprinkler System
FiledStatusContractorScope
08/11/2026Signed-offLIS PIPING SOLUTION INCSprinkler System
1 project · most recent 08/11/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/11/2026Signed-offSTREAM PLUMBING INCGas, Storm, Water/Sanitary
6 projects · most recent 04/14/2026
General Wiring
FiledStatusContractorScope
04/14/2026Permit IssuedL.D.M. ELECTL CONTRS INCGeneral Wiring
04/25/2025CompleteRIGHTWAY ELECTRICAL INCGeneral Wiring
08/01/2023CompleteKJK ELECTRIC INC—
05/03/2023CompleteSOLAS ELECTRICAL CORP—
05/03/2023CompleteSOLAS ELECTRICAL CORP—
12/28/2022CompleteRIGHTWAY ELECTRICAL INC1 meters, 1 new_meters
2 projects · most recent 08/11/2026
Concrete Masonry
FiledStatusContractorScope
08/11/2026Signed-offCONSTRUCTION MNGT. AA,LLCConcrete, Masonry
———1 scope_items
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
05/09/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
03/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/13/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
02/13/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/13/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
02/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/11/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/11/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/05/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
08/05/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
06/07/2023Pass-Final PL - UndergroundPassView ↗
04/05/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/27/2026Air barrier - visual inspection—energy_progress
08/27/2026Structural Stability – Alterations of existing buildings—special
08/27/2026Lowest Floor Elevation—progress
08/27/2026Fenestration areas—energy_progress
08/27/2026Fenestration air leakage—energy_progress
08/27/2026Fenestration and door U-factor and product ratings—energy_progress
08/27/2026Insulation placement and R values—energy_progress
03/23/2026Structural Stability – Alterations of existing buildings—special
03/23/2026Insulation placement and R values—energy_progress
03/23/2026Fenestration areas—energy_progress
03/23/2026Fenestration and door U-factor and product ratings—energy_progress
03/23/2026Fenestration air leakage—energy_progress
03/23/2026Air barrier - visual inspection—energy_progress
03/23/2026Lowest Floor Elevation—progress
11/11/2025Fenestration areas—energy_progress
11/11/2025Structural Stability – Alterations of existing buildings—special
11/11/2025Lowest Floor Elevation—progress
11/11/2025Fenestration and door U-factor and product ratings—energy_progress
11/11/2025Insulation placement and R values—energy_progress
11/11/2025Air barrier - visual inspection—energy_progress
11/11/2025Fenestration air leakage—energy_progress
08/25/2025Lowest Floor Elevation—progress
08/25/2025Fenestration air leakage—energy_progress
08/25/2025Insulation placement and R values—energy_progress
08/25/2025Air barrier - visual inspection—energy_progress
Latest 25 of 150.
▾Documents — 492 on file (BIS + DOB NOW)
▸Plans & Drawings51
▸DOB NOWPlans/Sketch51
08/29/2026Q08024332-I1Request digital key ↗
08/26/2026Q00670487-P3Request digital key ↗
08/26/2026Q00670487-P1Request digital key ↗
Showing 3 of 51 on file for this type
▸Applications & Permits28
▸DOB NOWDEP Stormwater Construction Permit13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
05/06/2025421841877Open ↗
03/06/2025440816431Open ↗
02/06/2025420558391Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
12/17/2024421841877Open ↗
12/17/2024421841877Open ↗
12/17/2024421841877Open ↗
▸BISWORK PERMIT APPLICATION2
06/11/2012420558391Open ↗
05/21/2012420558408Open ↗
▸Zoning, Tax Lot & Property Records30
▸DOB NOWZD1: DOB Zoning Diagram13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWZoning Exhibit form (1-5)13
08/17/2026Q00795057-I1Open ↗
Showing 1 of 13 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION1
12/17/2024421841877Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
12/17/2024421841877Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
12/17/2024421841877Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications210
▸DOB NOWProgress Inspector Seal & Signature81
09/01/2026Q00795057-B1Open ↗
09/01/2026Q00795057-B1Open ↗
09/01/2026Q00795057-B1Open ↗
Showing 3 of 81 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature72
09/01/2026Q00795057-B1Open ↗
09/01/2026Q00795057-B1Open ↗
09/01/2026Q00795057-B1Open ↗
Showing 3 of 72 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature49
08/25/2026Q08025127-I1Open ↗
08/24/2026Q00868770-I1Open ↗
08/24/2026Q00911363-I1Open ↗
Showing 3 of 49 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
06/11/2012420558391Open ↗
05/30/2012420574042Open ↗
04/25/2012420558408Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/25/2012420558408Open ↗
04/23/2012420558391Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
04/25/2012420558408Open ↗
04/23/2012420558391Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/27/2024440816431Open ↗
▸Trade Schedules & Equipment14
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/17/2026Q00795057-I1—
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST1
02/27/2024440816431Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
02/27/2024440816431Open ↗
▸BISBPP: STREET TREES SITE PLAN1
04/19/2024440816431Open ↗
▸DOB NOWStreet Tree Sign Off1
08/17/2026Q00795057-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/17/2026Q00795057-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026Q00795057-I1Open ↗
▸Environmental & Asbestos64
▸DOB NOWDEP ACP-5: Asbestos Assessment Report34
08/25/2026Q08025127-I1Open ↗
08/17/2026Q00795057-I1Open ↗
08/17/2026Q00795057-S3Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWOER: Notice to Proceed17
08/17/2026Q00795057-S3Open ↗
08/17/2026Q00795057-I1Open ↗
08/17/2026Q00795057-S5Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWOER: Notice of Satisfaction8
08/17/2026Q00795057-S5Open ↗
Showing 1 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
05/30/2012420574042Open ↗
04/25/2012420558408Open ↗
▸BISASBESTOS-CERTIFICATION (DEP ACP5)1
04/23/2012420558391Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/23/2012420558391Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
04/19/2024440816431Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports17
▸DOB NOWSOIL REPORT15
08/17/2026Q00795057-S3Open ↗
Showing 1 of 15 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/17/2026Q00795057-I1Open ↗
08/17/2026Q00795057-S3Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/15/2012420558408Open ↗
05/15/2012420558391Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/16/2024420558408Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
12/13/2024420558408Open ↗
12/13/2024420558408Open ↗
05/30/2012420574042Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET4
05/06/2025421841877Open ↗
05/30/2012420574042Open ↗
04/25/2012420558408Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
12/17/2024421841877Open ↗
04/19/2024440816431Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/27/2024440816431Open ↗
▸Other Documents55
▸DOB NOWSite Survey: Initial14
08/17/2026Q00795057-I1Open ↗
08/17/2026Q00795057-S5Open ↗
Showing 2 of 14 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone14
08/17/2026Q00795057-I1Open ↗
08/17/2026Q00795057-S5Open ↗
Showing 2 of 14 on file for this type
▸DOB NOWProperty Ownership Certification13
08/17/2026Q00795057-I1Open ↗
Showing 1 of 13 on file for this type
▸DOB NOWWaiver Document3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISENVIRONMENTAL(E) DEP NOTICE TO PROCEED2
05/16/2012420558408Open ↗
05/16/2012420558391Open ↗
▸DOB NOWAdjoining Owners Notification2
08/17/2026Q00795057-S3Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
02/27/2024440816431Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
12/17/2024421841877Open ↗
▸DOB NOWFinal Survey1
08/17/2026Q00795057-I1Open ↗
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type