Four families
30-59 38 STREET
QUEENS · Astoria (East)-Woodside (North) · BIN 4010636
💬 Discuss this project
2007Year Built
4Stories
C3Building Class
R6BZoning
4,014 sfGross Floor Area
4Units
Rent Stabilized5 Open Violations ▸
Four families · Owner of record: 2524 MACLAY REALTY LLC · 1,867 sf lot · 2.15 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Floor 141p · 1 filing · 8 docs
Floor 13
Floor 121p · 1 filing · 8 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 415p · 2 filings · 20 docs
Floor 317p · 3 filings · 20 docs
Floor 216p · 2 filings · 20 docs
Floor 117p · 3 filings · 20 docs
Cellar16p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ENVIRONMENTAL MANAGEMENT SERVICES1907/08/2026
2524 MACLAY REALTY LLC203/22/2026
3059 ASTORIA REALTY GROUP203/22/2026
3059 ESTATE REALTY CORP103/22/2026
3059 ASTORIA REALTY903/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/09/2022$2.1M—3059 ASTORIA LLC → 2524 MACLAY REALTY LLC$513/sf building
04/11/2022$1.7M—— → —$431/sf building
10/10/2014$463K—— → —$115/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENVIRONMENTAL MANAGEMENT SERVICES,601/15/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRISTATE CONTRACTINGGeneral Contractor607/08/2026
G. G. ELECTRIC CORP.Electrical103/22/2026
KOSTA KAMBERISElectrical103/21/2026
SERAFIM TSIOUGRISElectrical103/21/2026
NM MECHANICAL CORPPlumbing107/08/2026
T.N.T. PLBG & HTG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENVIRONMENTAL MANAGEMENT1375601/15/2025
Building Lifecycle
All (102)Filed (6)Permit Issued (4)Signed Off (2)Violation (39)Inspection (13)Objection (8)Special Inspection (30)
05/08/2026
Violation issued (HPD, open)
A
11/21/2025
Violation issued (HPD, open)
I
07/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/07/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/28/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
02/13/2025
Special inspection requirement — Insulation placement and R values
Kosta Kamberis
02/13/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Kosta Kamberis
02/13/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Kosta Kamberis
02/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kosta Kamberis
02/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kosta Kamberis
02/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
Kosta Kamberis
02/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Kosta Kamberis
02/13/2025
Special inspection requirement — Air barrier - visual inspection
Kosta Kamberis
02/13/2025
Special inspection requirement — Air barrier — testing
Kosta Kamberis
02/13/2025
Special inspection requirement — Fenestration air leakage
Kosta Kamberis
02/03/2025
Objection resolved — Addressed
02/03/2025
Objection resolved — Addressed
02/03/2025
Objection resolved — Addressed
01/24/2025
Objection raised — Structural
01/24/2025
Objection raised — Zoning
01/24/2025
Objection raised — Structural
01/15/2025
Filed — Alteration CO
NON-LOAD BEARING PARTITION REMOVAL, NEW TERRACE AT 1ST, 2ND & 3RD FL, NEW BEDROOM AT 4TH FL.
Q08006991-P2
01/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Kosta Kamberis
01/09/2025
Special inspection requirement — Air barrier — testing
Kosta Kamberis
01/09/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Kosta Kamberis
01/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kosta Kamberis
01/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kosta Kamberis
01/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Kosta Kamberis
01/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
Kosta Kamberis
01/09/2025
Special inspection requirement — Air barrier - visual inspection
Kosta Kamberis
01/09/2025
Special inspection requirement — Fenestration air leakage
Kosta Kamberis
01/09/2025
Special inspection requirement — Insulation placement and R values
Kosta Kamberis
09/23/2024
Violation issued (HPD, open)
B
09/23/2024
Violation issued (HPD, open)
C
06/03/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/22/2024
Signed off — Alteration
PROPOSED PLUMBING WORK IN CONJUCTION WITH INTERIOR RENOVATION APPLICATION.
Q08006742-I1
04/16/2024
Violation issued (HPD, closed)
A
01/02/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/24/2023
Violation issued (HPD, closed)
I
11/02/2023
Permit issued — Plumbing
Q55727984-I1-PL
08/08/2023
Objection raised — Structural
08/08/2023
Objection resolved — Addressed
07/28/2023
Filed — Alteration CO
NON-LOAD BEARING PARTITION REMOVAL, NEW TERRACE AT 1ST, 2ND & 3RD FL, NEW BEDROOM AT 4TH FL.
Q08006991-P1
07/28/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/28/2023
Special inspection requirement — Air barrier — testing
Kosta Kamberis
07/28/2023
Special inspection requirement — Fenestration air leakage
Kosta Kamberis
07/28/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Kosta Kamberis
07/28/2023
Special inspection requirement — Air barrier - visual inspection
Kosta Kamberis
07/28/2023
Special inspection requirement — Insulation placement and R values
Kosta Kamberis
07/28/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Kosta Kamberis
07/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kosta Kamberis
07/28/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kosta Kamberis
07/28/2023
Special inspection requirement — Energy Code Compliance Inspections
Kosta Kamberis
07/28/2023
Special inspection requirement — Fire-Resistance Rated Construction
Kosta Kamberis
05/17/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/13/2023
Signed off — Alteration
MINOR INTERIOR RENOVATION AND FACADE REPAIR WORK
Q08001402-I1
03/30/2023
Violation issued (HPD, closed)
A
03/20/2023
Violation issued (HPD, closed)
A
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT.N.T. PLBG & HTG, INC11/02/2023
DOB NOWGeneral ConstructionPermit IssuedTRISTATE CONTRACTING12/08/2022
DOB NOWGeneral ConstructionSigned-offTRISTATE CONTRACTING10/18/2022
DOB NOWPlumbingSigned-offNM MECHANICAL CORP10/18/2022
BISPLISSUEDBT'S PLUMBING AND HEATING01/10/2020
BIS—ISSUEDJLS DESIGNS ARCHITECTURE08/19/2019
BISSPISSUEDORBIT SPRINKLER CORP08/29/2018
BIS—ISSUEDJLS DESIGNS ARCHITECTURE07/25/2018
BISPLISSUEDZARA PLUMBING CORP05/21/2018
BIS—ISSUEDJLS DESIGNS ARCHITECTURE02/01/2018
BIS—ISSUEDEPALINGES BUILDERS IN07/17/2007
BISPLISSUEDENTERPRISE PLUMBING & HTG INC06/22/2007
BISEQISSUEDEPALINGES BUILDERS INC10/06/2006
BIS—ISSUEDEPALINGES BUILDERS IN10/06/2006
BISEQISSUEDGOLDSMITH CONSTRUCTION CORP07/28/2006
BISEQISSUEDSANO CONSTRUCTION CORP.01/31/2006
BIS—ISSUEDSANO CONSTRUCTION CORP.01/31/2006
3 projects · most recent 01/27/2025
General Wiring
FiledStatusContractorScope
01/27/2025CompleteATTRACTIVE LIGHTING ELECLGeneral Wiring
06/17/2019CompleteG. G. ELECTRIC CORP.General Wiring
08/20/2018CompleteG. G. ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
07/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/07/2025Fail-Final CND-Occupancy InspectionFailView ↗
04/28/2025Fail-Final CND-Occupancy InspectionFailView ↗
06/03/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/08/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/28/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/20/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/05/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/23/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/07/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
02/13/2025Insulation placement and R valuesKosta Kamberisenergy_progress
02/13/2025Fenestration and door U-factor and product ratingsKosta Kamberisenergy_progress
02/13/2025Exterior Insulation and Finish Systems (EIFS)Kosta Kamberisspecial
02/13/2025Fire-Resistant Penetrations and JointsKosta Kamberisspecial
02/13/2025Structural Stability – Alterations of existing buildingsKosta Kamberisspecial
02/13/2025Fire-Resistance Rated ConstructionKosta Kamberisprogress
02/13/2025Energy Code Compliance InspectionsKosta Kamberisprogress
02/13/2025Air barrier - visual inspectionKosta Kamberisenergy_progress
02/13/2025Air barrier — testing Kosta Kamberisenergy_progress
02/13/2025Fenestration air leakageKosta Kamberisenergy_progress
01/09/2025Fenestration and door U-factor and product ratingsKosta Kamberisenergy_progress
01/09/2025Air barrier — testing Kosta Kamberisenergy_progress
01/09/2025Exterior Insulation and Finish Systems (EIFS)Kosta Kamberisspecial
01/09/2025Fire-Resistant Penetrations and JointsKosta Kamberisspecial
01/09/2025Structural Stability – Alterations of existing buildingsKosta Kamberisspecial
01/09/2025Energy Code Compliance InspectionsKosta Kamberisprogress
01/09/2025Fire-Resistance Rated ConstructionKosta Kamberisprogress
01/09/2025Air barrier - visual inspectionKosta Kamberisenergy_progress
01/09/2025Fenestration air leakageKosta Kamberisenergy_progress
01/09/2025Insulation placement and R valuesKosta Kamberisenergy_progress
07/28/2023Air barrier — testing Kosta Kamberisenergy_progress
07/28/2023Fenestration air leakageKosta Kamberisenergy_progress
07/28/2023Fenestration and door U-factor and product ratingsKosta Kamberisenergy_progress
07/28/2023Air barrier - visual inspectionKosta Kamberisenergy_progress
07/28/2023Insulation placement and R valuesKosta Kamberisenergy_progress
Latest 25 of 34.
▾Documents — 176 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026Q08001402-I1Request digital key ↗
08/25/2026Q08006742-P1Request digital key ↗
08/25/2026Q08006742-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION19
06/07/2022402373132Open ↗
12/30/2021402373132Open ↗
03/17/2020402373132Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION7
07/29/2021402373132Open ↗
01/13/2020402373132Open ↗
08/20/2019402373132Open ↗
Showing 3 of 7 on file for this type
▸BISINTENT TO REVOKE APPROVAL/PERMIT2
08/10/2015402397982Open ↗
08/10/2015402373132Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/12/2019402373132Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISVERIFY TAX LOT1
12/29/2021402373132Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
01/11/2019402373132Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/29/2021402373132Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08006991-I1Open ↗
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature23
09/25/2026Q08006991-P2Open ↗
09/25/2026Q08006991-P2Open ↗
09/25/2026Q08006991-P2Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/25/2026Q08006991-P2Open ↗
09/25/2026Q08006991-P2Open ↗
09/25/2026Q08006991-P2Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
11/08/2019402373132Open ↗
11/08/2019402373132Open ↗
11/08/2019402373132Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026Q08006991-I1Open ↗
08/21/2026Q08006991-P1Open ↗
08/21/2026Q08006991-P2Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
03/17/2020402373132Open ↗
11/15/2019402373132Open ↗
03/11/2019402373132Open ↗
Showing 3 of 12 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/18/2019402373132Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
01/07/2020421694278Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026Q08006991-P1Open ↗
08/13/2026Q08006991-I1Open ↗
08/13/2026Q08006991-P2Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/16/2018421630934Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY8
01/27/2022402373132Open ↗
01/19/2022402373132Open ↗
01/19/2022402373132Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION3
01/27/2022402373132Open ↗
12/14/2020402373132Open ↗
10/07/2020402373132Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS2
05/16/2018421630934Open ↗
05/16/2018421630934Open ↗
▸BISHYDRO FLOW TEST LETTER2
01/14/2019421630934Open ↗
10/23/2018421630934Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
11/18/2021402373132Open ↗
▸BIS* * BORINGS / TEST PITS (TR-4) 27-7201
04/19/2022402373132Open ↗
▸Approvals, Objections & Sign-offs12
▸BISSCHEDULE A - OCCUPANCY / USE4
02/25/2019402373132Open ↗
02/19/2019402373132Open ↗
01/03/2019402373132Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
03/12/2020421694278Open ↗
03/12/2020421694278Open ↗
11/08/2019421630934Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER3
07/29/2021402373132Open ↗
01/13/2020402373132Open ↗
06/01/2018402373132Open ↗
▸BISIntent to Rescind Letter1
04/24/2018402373132Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT6
03/12/2020421694278Open ↗
03/07/2020421694278Open ↗
01/26/2019421630934Open ↗
Showing 3 of 6 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
08/20/2019402373132Open ↗
08/07/2018402373132Open ↗
02/02/2018402373132Open ↗
▸Filing & Intake Forms29
▸BISADDITIONAL INFORMATION17
06/14/2022402373132Open ↗
04/19/2022402373132Open ↗
02/07/2022402373132Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM10
07/29/2021402373132Open ↗
03/12/2020421694278Open ↗
11/15/2019402373132Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET2
11/21/2018421694278Open ↗
05/16/2018421630934Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification3
08/21/2026Q08006991-P2Open ↗
08/21/2026Q08006991-I1Open ↗
08/15/2026Q08006991-P1Open ↗
▸BISPLOT DIAGRAM1
12/29/2021402373132Open ↗
▸BIS* * LT.GAUGE STEEL/WOOD FL.TRUSS/LAM.IBEAM TPPN2/001
12/29/2021402373132Open ↗