| Owner | Filings | Most Recent |
|---|---|---|
| MASTER GC MANAGEMENT | 1 | 09/13/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| PAPA ARCHITECTURE PC | 5 | 05/04/2026 |
| A & T ENGINEERING, P.C. | 13 | 06/14/2023 |
| AUTOMATED DESIGN ENGINEERING, PLLC | 4 | 05/03/2023 |
| AFM INSPECTIONS & ENGINEERING, PLLC | 1 | 01/13/2021 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| A & T DESIGN GROUP LLC | 1088 | 13 | 06/14/2023 |
| AUTOMATED DESIGN CONSULTA | 895 | 3 | 05/03/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Support of Excavation | Permit Issued | ALL STATE 12 GENERAL CONT | 01/02/2026 |
| DOB NOW | Foundation | Permit Issued | ALL STATE 12 GENERAL CONT | 01/02/2026 |
| DOB NOW | Foundation | Permit Issued | ALL STATE 12 GENERAL CONT | 01/02/2026 |
| DOB NOW | Construction Fence | Signed-off | ALL STATE 12 GENERAL CONT | 12/19/2025 |
| DOB NOW | Construction Fence | Permit Issued | NY DRILLING INC | 03/11/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 04/21/2023 | — | — | Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Mitsubishi Electric MSZ-FS06NA 6,000 BTU · Ahu ×160 MSZ-FS12NA 12,000 BTU · Ahu ×102 MXC-3C24NAHZ2 22,000 BTU · Vrf Outdoor ×52 MXC-2C20NAHZ2 18,000 BTU · Heat Pump Outdoor ×46 PLFY-P08NFMU-E 8,000 BTU · Vrf Indoor ×28 MUZ-FS12NAH 12,000 BTU · Heat Pump Outdoor ×14 PKLY-P12NLMU-E 12,000 BTU · Vrf Indoor ×6 PKLY-P15NLMU-E 15,000 BTU · Vrf Indoor ×4 MXZ-SM48NAMHZ 48,000 BTU · Heat Pump Outdoor ×2 PKLY-P04NLMU-E 4,000 BTU · Vrf Indoor ×2 PUHY-EP168TNU-A 168,000 BTU · Vrf Outdoor ×2 Heating Mitsubishi Electric MSZ-FS06NA 8,700 BTU · Ahu ×160 MSZ-FS12NA 12,300 BTU · Ahu ×102 MXC-3C24NAHZ2 25,000 BTU · Vrf Outdoor ×52 MXC-2C20NAHZ2 22,000 BTU · Heat Pump Outdoor ×46 PLFY-P08NFMU-E 9,000 BTU · Vrf Indoor ×28 PKLY-P12NLMU-E 13,500 BTU · Vrf Indoor ×16 MUZ-FS12NAH 12,300 BTU · Heat Pump Outdoor ×14 PKLY-P15NLMU-E 17,000 BTU · Vrf Indoor ×4 MXZ-SM48NAMHZ 54,000 BTU · Heat Pump Outdoor ×2 PKLY-P04NLMU-E 4,500 BTU · Vrf Indoor ×2 PUHY-EP168TNU-A 188,000 BTU · Vrf Outdoor ×2 King LPW1227T 5,115 BTU · Electric Heater ×38 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/21/2023 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/13/2026 | Permit Issued | AL-LECTRIC ELECT'L CONTRG | 1 meters, 1 new_meters |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/14/2023 | — | — | Steel, Concrete, Masonry |
| 04/25/2023 | Permit Issued | ALL STATE 12 GENERAL CONT | 1 scope_items |
| 04/25/2023 | Permit Issued | ALL STATE 12 GENERAL CONT | 4 scope_items |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 02/17/2026 | Wall Panels, Curtain Walls, and Veneers | — | special |
| 02/17/2026 | Fire-Resistance Rated Construction | Christopher Papa | progress |
| 02/17/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 02/17/2026 | Energy Code Compliance Inspections | Christopher Papa | progress |
| 02/17/2026 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | — | special |
| 02/16/2026 | Fenestration air leakage | — | energy_progress |
| 02/16/2026 | Fenestration areas | — | energy_progress |
| 02/16/2026 | Lowest Floor Elevation | — | progress |
| 02/16/2026 | Air barrier - visual inspection | — | energy_progress |
| 02/16/2026 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 02/16/2026 | Insulation placement and R values | — | energy_progress |
| 06/20/2023 | Masonry | ROBERT LIN | special |
| 06/20/2023 | Final | ROBERT LIN | progress |
| 06/20/2023 | Post-installed Anchors | ROBERT LIN | special |
| 06/20/2023 | Structural Steel - Details | ROBERT LIN | special |
| 06/20/2023 | Concrete - Cast-In-Place | ROBERT LIN | special |
| 06/20/2023 | Structural Steel - Welding | ROBERT LIN | special |
| 06/20/2023 | Structural Cold-Formed Steel | ROBERT LIN | special |
| 06/20/2023 | Structural Steel - High Strength Bolting | ROBERT LIN | special |
| 06/12/2023 | Structural Steel - Welding | ROBERT LIN | special |
| 06/12/2023 | Concrete - Cast-In-Place | ROBERT LIN | special |
| 06/12/2023 | Masonry | ROBERT LIN | special |
| 06/12/2023 | Post-installed Anchors | ROBERT LIN | special |
| 06/12/2023 | Structural Cold-Formed Steel | ROBERT LIN | special |
| 06/12/2023 | Structural Steel - Details | ROBERT LIN | special |