← Back
BuildNYC
Elevator apt, semi-fireproof without stores
The Parisian
30-78 29TH STREET · BIN 4007096
💬 Discuss this project
2024Year Built
7Stories
D1Building Class
R6AZoning
22,960 sfGross Floor Area
27Units
3 Active Violations 2 unresolved · 1 paperwork only ▸
Elevator apt, semi-fireproof without stores · Owner of record: 3078 LLC · 6,050 sf lot · 3.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMechanical system installation287p · 5 filings · 20 docs
BulkheadMechanical system installation9p · 4 filings · 20 docs
Floor 7Mechanical system installation282p · 5 filings · 20 docs
Floor 6Mechanical system installation281p · 5 filings · 20 docs
Floor 5Mechanical system installation282p · 5 filings · 20 docs
Floor 4Mechanical system installation281p · 5 filings · 20 docs
Floor 3Mechanical system installation279p · 5 filings · 20 docs
Floor 2Mechanical system installation284p · 5 filings · 20 docs
Floor 1Mechanical system installation306p · 7 filings · 20 docs
CellarMechanical system installation286p · 6 filings · 20 docs
Site & exteriorRolling Gate Hardware Construction Fence280p · 11 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/17/2023$5.3M—Private party → 3078 LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J Witkin Consulting6403/21/2026
HS Design Studio203/21/2026
A1 Expediting Service1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Identity ConstructionGeneral Contractor3007/08/2026
Identity ConstructionScaffold907/08/2026
Precision Hoist & Scaffo*Scaffold807/08/2026
Hexagon GroupScaffold807/08/2026
AmokFire Protection207/08/2026
Elm Suspension Systems*Scaffold207/08/2026
QMB Plumbing & HeatingPlumbing107/08/2026
Tuxedo Electrical ContractingElectrical103/22/2026
AmokPlumbing107/08/2026
Greenway Plumbing NYPlumbing107/08/2026
M.R. Electrical ServiceElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Badaly Architect71371209/04/2026
Concrete Solutions Lab Co53442108/10/2026
Lombardo Prof Engineering8566104/16/2025
Building Lifecycle
All (239)Filed (51)Permit Issued (52)Signed Off (18)Violation (41)Inspection (9)Objection (38)Special Inspection (30)
10/02/2026
Signed off — New Building
HEREBY FILING NEW 7 STORY, 27 UNIT MULTI-FAMILY RESIDENTIAL BUILDING
Q00963181-S1
09/28/2026
Objection raised — Other
09/28/2026
Objection resolved — Resolved
09/04/2026
Filed — New Building
HEREBY FILING NEW 7 STORY, 27 UNIT MULTI-FAMILY RESIDENTIAL BUILDING
Q00963181-P9
09/03/2026
Signed off — Alteration
PAA SUBMITTED IN ORDER TO SUBMIT REVISED AS BUILT DRAWINGS. NO CHANGE TO USE, OCCUPANCY OR EGRESS PROPOSED.
Q00990138-I1
09/02/2026
Special inspection requirement — Lighting controls
SHAHIN BADALY
09/02/2026
Special inspection requirement — Exterior lighting power
SHAHIN BADALY
09/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHIN BADALY
09/02/2026
Special inspection requirement — Air barrier - visual inspection
SHAHIN BADALY
09/02/2026
Special inspection requirement — Combustible Exterior Wall Coverings
SHAHIN BADALY
09/02/2026
Special inspection requirement — Air barrier — testing
SHAHIN BADALY
09/02/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
SHAHIN BADALY
09/02/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHIN BADALY
09/02/2026
Special inspection requirement — Electrical motors and elevators
SHAHIN BADALY
09/02/2026
Special inspection requirement — Protection of exposed foundation insulation
SHAHIN BADALY
09/02/2026
Special inspection requirement — Maintenance information
SHAHIN BADALY
09/02/2026
Special inspection requirement — Vestibules
SHAHIN BADALY
09/02/2026
Special inspection requirement — Fenestration areas
SHAHIN BADALY
09/02/2026
Special inspection requirement — Insulation placement and R values
SHAHIN BADALY
09/02/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SHAHIN BADALY
09/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
09/02/2026
Special inspection requirement — Masonry
SHAHIN BADALY
09/02/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SHAHIN BADALY
09/02/2026
Special inspection requirement — Lowest Floor Elevation
SHAHIN BADALY
09/02/2026
Special inspection requirement — Interior lighting power
SHAHIN BADALY
09/02/2026
Special inspection requirement — Fenestration air leakage
SHAHIN BADALY
09/02/2026
Special inspection requirement — Lighting in dwelling units
SHAHIN BADALY
09/02/2026
Special inspection requirement — Metering
SHAHIN BADALY
09/02/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
SHAHIN BADALY
09/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHIN BADALY
08/21/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/18/2026
Signed off — Alteration
PROVIDE NEW 8FT PLYWOOD CONSTRUCTION FENCE
Q00945208-I1
08/13/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MINA HANNA
08/10/2026
Filed — Alteration
PAA SUBMITTED IN ORDER TO SUBMIT REVISED AS BUILT DRAWINGS. NO CHANGE TO USE, OCCUPANCY OR EGRESS PROPOSED.
Q00990138-P6
08/04/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MINA HANNA
06/30/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
SHAHIN BADALY
06/30/2026
Special inspection requirement — Masonry
SHAHIN BADALY
06/30/2026
Special inspection requirement — Combustible Exterior Wall Coverings
SHAHIN BADALY
06/16/2026
Signed off — Alteration
INSTALLATION OF NEW MECHANICAL SYSTEM TO INCLUDE NEW DUCTING AND HVAC SYSTEMS IN CONJUNCTION WITH NB #Q00963181. NO CHANGE TO USE, OCCUPANCY OR EGRESS PROPOSED UNDER THIS APPLICAITON.
Q00990135-I1
06/04/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION SHANTY (OFFICE) TO BE USED BY STAFF AND TO HOUSE CONSTRUCTION DOCUMENTS FOR THE DURATION OF CONSTRUCITON ACTIVITIES ON SITE. NO CHANGE TO USE, OCCUPANCY OR EGRESS PROPOSED UNDER THIS APPLICAITON.
Q01152675-I1
06/01/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01129876-S1
06/01/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01129876-I1
06/01/2026
Permit issued — General Construction
Q00963181-I1-GC
06/01/2026
Permit issued — Construction Fence
Q00945208-I1-FN
06/01/2026
Permit issued — General Construction
Q01152675-I1-GC
06/01/2026
Permit issued — Mechanical Systems
Q00990135-I1-MS
05/29/2026
Signed off — Alteration
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01200584-I1
05/29/2026
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01200569-I1
05/29/2026
Signed off — Alteration
Installation of temporary material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01200591-I1
05/29/2026
Signed off — Alteration
Installation of temporary debris chute per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01200589-I1
05/12/2026
Signed off — Alteration
INSTALLATION OF NEW SPRINKLER SYSTEM IN CONJUNCTION WITH NEW BUILDING FILING Q00963181. NO CHANGE TO USE, OCCUPANCY OR EGRESS PROPOSED UNDER THIS APPLICATION.
Q00990139-I1
05/08/2026
Permit issued — Curb Cut
Q00963181-S1-CC
04/30/2026
Filed — Alteration
PAA SUBMITTED IN ORDER TO SUBMIT REVISED AS BUILT DRAWINGS. NO CHANGE TO USE, OCCUPANCY OR EGRESS PROPOSED.
Q00990138-P5
04/30/2026
Violation issued (ECB, closed)
Construction
04/30/2026
Violation issued (ECB, closed)
Construction
04/28/2026
Filed — New Building
HEREBY FILING NEW 7 STORY, 27 UNIT MULTI-FAMILY RESIDENTIAL BUILDING
Q00963181-P7
04/24/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
04/23/2026
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
04/23/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/21/2026
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01200569-P2
Latest 60 of 239 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedIdentity Construction06/01/2026
DOB NOWConstruction FenceSigned-offIdentity Construction06/01/2026
DOB NOWGeneral ConstructionSigned-offIdentity Construction06/01/2026
DOB NOWMechanical SystemsSigned-offIdentity Construction06/01/2026
DOB NOWCurb CutSigned-offIdentity Construction05/08/2026
DOB NOWProtection and Mechanical MethodsSigned-offPrecision Hoist & Scaffo*03/16/2026
DOB NOWProtection and Mechanical MethodsSigned-offPrecision Hoist & Scaffo*03/16/2026
DOB NOWProtection and Mechanical MethodsSigned-offPrecision Hoist & Scaffo*03/13/2026
DOB NOWSupported ScaffoldSigned-offPrecision Hoist & Scaffo*03/12/2026
DOB NOWConstruction FenceSigned-offHexagon Group02/10/2026
DOB NOWSidewalk ShedSigned-offHexagon Group02/10/2026
DOB NOWPlumbingSigned-offAmok08/28/2025
DOB NOWSprinklersSigned-offAmok08/27/2025
DOB NOWMechanical SystemsSigned-offIdentity Construction07/07/2025
DOB NOWMechanical SystemsSigned-offIdentity Construction07/01/2025
DOB NOWGeneral ConstructionPermit IssuedIdentity Construction07/01/2025
DOB NOWGeneral ConstructionSigned-offIdentity Construction07/01/2025
DOB NOWFoundationSigned-offIdentity Construction06/30/2025
DOB NOWStructuralSigned-offIdentity Construction06/30/2025
DOB NOWConstruction FenceSigned-offIdentity Construction06/30/2025
DOB NOWGeneral ConstructionPermit IssuedIdentity Construction06/02/2025
DOB NOWStructuralSigned-offIdentity Construction05/28/2025
DOB NOWConstruction FenceSigned-offIdentity Construction05/28/2025
DOB NOWFoundationSigned-offIdentity Construction05/28/2025
DOB NOWSuspended ScaffoldSigned-offElm Suspension Systems*04/29/2025
DOB NOWSuspended ScaffoldSigned-offElm Suspension Systems*04/16/2025
DOB NOWProtection and Mechanical MethodsSigned-offPrecision Hoist & Scaffo*03/27/2025
DOB NOWProtection and Mechanical MethodsSigned-offPrecision Hoist & Scaffo*03/27/2025
DOB NOWProtection and Mechanical MethodsSigned-offPrecision Hoist & Scaffo*03/27/2025
DOB NOWSupported ScaffoldSigned-offPrecision Hoist & Scaffo*03/26/2025
DOB NOWMechanical SystemsSigned-offIdentity Construction03/17/2025
DOB NOWSidewalk ShedSigned-offHexagon Group01/22/2025
DOB NOWConstruction FenceSigned-offHexagon Group01/21/2025
DOB NOWGeneral ConstructionSigned-offIdentity Construction01/08/2025
DOB NOWPlumbingSigned-offQMB Plumbing & Heating12/10/2024
DOB NOWSidewalk ShedSigned-offHexagon Group10/24/2024
DOB NOWConstruction FenceSigned-offHexagon Group10/24/2024
DOB NOWPlumbingSigned-offGreenway Plumbing NY08/29/2024
DOB NOWSprinklersSigned-offAmok08/27/2024
DOB NOWGeneral ConstructionPermit IssuedIdentity Construction08/01/2024
+ 10 more permits on file
1 project · most recent 01/27/2026
FiledStatusContractorScope
01/27/2026Signed-offAmok546 heads
2 projects · most recent 08/10/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/10/2026Signed-offAmokGas, Storm, Water/Sanitary
01/27/2026———
4 projects · most recent 06/24/2026
General Wiring
FiledStatusContractorScope
06/24/2026CompleteCity Wide Electrical ContsGeneral Wiring
10/22/2024Permit IssuedHigh Quality Electric of—
08/05/2024CompleteTuxedo Electrical Contracting—
07/23/2024CompleteM.R. Electrical Service1 meters, 1 new_meters
3 projects · most recent 04/21/2026
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
04/21/2026Signed-offPrecision Hoist & Scaffo*Scaffold
08/14/2025Signed-offHexagon GroupFence, Sidewalk Shed
09/02/2024Signed-offIdentity ConstructionFence
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/21/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/24/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
04/23/2026Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
04/23/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/21/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/25/2025Pass-Final House ConnectionPassView ↗
09/26/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/05/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/02/2026Fenestration areasSHAHIN BADALYenergy_progress
09/02/2026Air barrier — testing SHAHIN BADALYenergy_progress
09/02/2026Insulation placement and R valuesSHAHIN BADALYenergy_progress
09/02/2026Combustible Exterior Wall CoveringsSHAHIN BADALYspecial
09/02/2026Construction Operations Influencing Adjacent StructuresSHAHIN BADALYspecial
09/02/2026Exterior Insulation and Finish Systems (EIFS)SHAHIN BADALYspecial
09/02/2026Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
09/02/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)SHAHIN BADALYspecial
09/02/2026MasonrySHAHIN BADALYspecial
09/02/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSHAHIN BADALYspecial
09/02/2026Energy Code Compliance InspectionsSHAHIN BADALYprogress
09/02/2026Fire-Resistance Rated ConstructionSHAHIN BADALYprogress
09/02/2026Lowest Floor ElevationSHAHIN BADALYprogress
09/02/2026Interior lighting powerSHAHIN BADALYenergy_progress
09/02/2026Electrical motors and elevatorsSHAHIN BADALYenergy_progress
09/02/2026Fenestration air leakageSHAHIN BADALYenergy_progress
09/02/2026Lighting in dwelling unitsSHAHIN BADALYenergy_progress
09/02/2026Protection of exposed foundation insulationSHAHIN BADALYenergy_progress
09/02/2026Air barrier - visual inspectionSHAHIN BADALYenergy_progress
09/02/2026Lighting controlsSHAHIN BADALYenergy_progress
09/02/2026MeteringSHAHIN BADALYenergy_progress
09/02/2026Fenestration and door U-factor and product ratingsSHAHIN BADALYenergy_progress
09/02/2026Exterior lighting powerSHAHIN BADALYenergy_progress
09/02/2026VestibulesSHAHIN BADALYenergy_progress
09/02/2026Maintenance informationSHAHIN BADALYenergy_progress
Latest 25 of 150.
▾Documents — 326 on file (BIS + DOB NOW)
▸Plans & Drawings49
▸DOB NOWPlans/Sketch49
08/23/2026Q01019123-I1Request digital key ↗
08/23/2026Q00945218-I1Request digital key ↗
08/22/2026Q00990285-P1Request digital key ↗
Showing 3 of 49 on file for this type
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZD1: DOB Zoning Diagram9
10/04/2026Q00963181-P9Open ↗
Showing 1 of 9 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWZoning Exhibit form (1-5)1
10/04/2026Q00963181-P9Open ↗
▸Seals & Professional Certifications210
▸DOB NOWProgress Inspector Seal & Signature96
10/04/2026Q00963181-P9Open ↗
10/04/2026Q00963181-P9Open ↗
09/25/2026Q00990135-P1Open ↗
Showing 3 of 96 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature62
10/04/2026Q00963181-P9Open ↗
09/25/2026Q00990135-P1Open ↗
09/25/2026Q00990135-P1Open ↗
Showing 3 of 62 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature51
10/04/2026Q00963181-P9Open ↗
08/23/2026Q01019123-I1Open ↗
08/23/2026Q00945218-I1Open ↗
Showing 3 of 51 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/27/2024440816299Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWWater Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWElectric Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSewer Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWGas Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist8
10/04/2026Q00963181-P9Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos2
▸DOB NOWRodent Control1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026Q00945218-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
02/27/2024440816299Open ↗
▸Other Documents33
▸DOB NOWSite Survey: Initial8
10/04/2026Q00963181-P9Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone8
10/04/2026Q00963181-P9Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWProperty Ownership Certification7
10/04/2026Q00963181-P9Open ↗
08/23/2026Q00945218-I1Open ↗
Showing 2 of 7 on file for this type
▸DOB NOWAdjoining Owners Notification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)2
08/23/2026Q01019123-I1Open ↗
Showing 1 of 2 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
03/08/2024440816299Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStructure Photographs1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCommunity Board Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type