← Back
Two family converted from one family
30-82 36 STREET
QUEENS · BIN 4009961
💬 Discuss this project
1935Year Built
2Stories
B3Building Class
R5BZoning
2,720 sfGross Floor Area
2Units
Two family converted from one family · 2,500 sf lot · 1.09 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 21p · 1 filing · 8 docs
Floor 11p · 1 filing · 8 docs
Cellar3p · 2 filings · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GEORGIOS G GEORGOPOULOS, R.A.409/21/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAESTRO CONSTRUCTION CORP.General Contractor307/08/2026
N & D PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GEORGIOS G. GEORGOPOULOS,1192409/21/2021
Building Lifecycle
All (22)Filed (4)Permit Issued (4)Signed Off (2)Inspection (7)Objection (2)Special Inspection (3)
04/13/2022
Signed off — Alteration
REVERT 1ST FLOOR HOME OFFICE BACK TO DWELLING UNIT. REMOVE & ERECT MINOR INTERIOR PARTITIONS AT CELLAR 1ST. & 2ND FLOORS & AS SHOWN ON PLANS FILED HEREWITH. RELATED PLUMBING WORK FILED UNDER A SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Q00520991-I1
04/13/2022
Signed off — Alteration
Filing of related plumbing work in conjunction with DOB NOW Job #Q00520991. No change in use, egress or occupancy.
Q00521215-I1
04/01/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/28/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/08/2022
Permit issued — General Construction
Q00520991-I1-GC
11/15/2021
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/10/2021
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/18/2021
Permit issued — General Construction
Q00520991-I1-GC
10/08/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/07/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/07/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/21/2021
Filed — Alteration
REVERT 1ST FLOOR HOME OFFICE BACK TO DWELLING UNIT. REMOVE & ERECT MINOR INTERIOR PARTITIONS AT CELLAR 1ST. & 2ND FLOORS & AS SHOWN ON PLANS FILED HEREWITH. RELATED PLUMBING WORK FILED UNDER A SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Q00520991-P1
09/21/2021
Filed — Alteration
Filing of related plumbing work in conjunction with DOB NOW Job #Q00520991. No change in use, egress or occupancy.
Q00521215-P1
09/17/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Georgios Georgopoulos
09/17/2021
Special inspection requirement — Fire-Resistance Rated Construction
Georgios Georgopoulos
09/17/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Georgios Georgopoulos
07/22/2021
Permit issued — General Construction
Q00520991-I1-GC
07/15/2021
Permit issued — Plumbing
Q00521215-I1-PL
06/11/2021
Objection resolved — Addressed
06/03/2021
Objection raised — Other
05/17/2021
Filed — Alteration
REVERT 1ST FLOOR HOME OFFICE BACK TO DWELLING UNIT. REMOVE & ERECT MINOR INTERIOR PARTITIONS AT CELLAR 1ST. & 2ND FLOORS & AS SHOWN ON PLANS FILED HEREWITH. RELATED PLUMBING WORK FILED UNDER A SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Q00520991-I1
05/17/2021
Filed — Alteration
Filing of related plumbing work in conjunction with DOB NOW Job #Q00520991. No change in use, egress or occupancy.
Q00521215-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMAESTRO CONSTRUCTION CORP.03/08/2022
DOB NOWGeneral ConstructionSigned-offMAESTRO CONSTRUCTION CORP.10/18/2021
DOB NOWGeneral ConstructionSigned-offMAESTRO CONSTRUCTION CORP.07/22/2021
DOB NOWPlumbingSigned-offN & D PLBG & HTG CORP07/15/2021
BISPLISSUEDMASTER PLUMBER04/16/1996
BISOTISSUEDDR. GEORGE KOFINAS11/08/1995
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/01/2022Pass-Final General Construction Non-Directive 14PassView ↗
03/28/2022Fail-Final General Construction Non-Directive 14FailView ↗
11/15/2021Fail-Final General Construction Non-Directive 14FailView ↗
11/10/2021Fail-Final General Construction Non-Directive 14FailView ↗
10/08/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/07/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/07/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
09/17/2021Fire-Resistant Penetrations and JointsGeorgios Georgopoulosspecial
09/17/2021Fire-Resistance Rated ConstructionGeorgios Georgopoulosprogress
09/17/2021Fire-Resistant Penetrations and JointsGeorgios Georgopoulosspecial
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026Q00520991-P1Request digital key ↗
08/27/2026Q00521215-I1Request digital key ↗
08/27/2026Q00521215-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026Q00520991-I1Open ↗
08/27/2026Q00520991-P1Open ↗
08/27/2026Q00521215-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q00521215-P1Open ↗
08/26/2026Q00520991-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026Q00520991-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026Q00520991-P1Open ↗
08/27/2026Q00521215-P1Open ↗
08/27/2026Q00521215-I1Open ↗
Showing 3 of 4 on file for this type