← Back
BuildNYC
Single or multiple dwelling with stores or offices
30-98 42ND STREET
QUEENS · BIN 4011285
💬 Discuss this project
1926Year Built
3Stories
S9Building Class
R5Zoning
3,415 sfGross Floor Area
4Units
0 Active Violations 3 likely answered ▸
Single or multiple dwelling with stores or offices · Owner of record: Athanasiades Cultural Foundation · 1,780 sf lot · 1.92 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 3Athanasiades Cultural Foundation19p · 2 filings · 20 docs
Floor 2Athanasiades Cultural Foundation13p · 2 filings · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Athanasiades Cultural Foundation1603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MR Associates406/25/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D.D.S. Mechanical Plumbingspecialty_contractor403/21/2026
D.D.S. Mechanical PBG & HeatingPlumbing207/08/2026
E & M Electrical ContractingElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SM Studio8173406/25/2025
Building Lifecycle
All (43)Filed (4)Permit Issued (4)Signed Off (2)Violation (10)Inspection (5)Objection (2)Special Inspection (16)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/28/2025
Signed off — Alteration
Proposed Plumbing work in Apartments at 2nd and 3rd Floor, as shown on plans. Filed in Conjunction with Job no. Q00597098.
Q00629715-I1
08/28/2025
Signed off — Alteration
PROPOSED INTERIOR RENOVATION OF EXISTING 2 APARTMENTS @ 2nd AND 3rd FLOOR AS SHOWN ON PLANS. NO CHANGE IN USE, EGREES OR OCCUPANCY.
Q00597098-I1
08/14/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/14/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/30/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/24/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARIJA RISTIC
07/07/2025
Objection resolved — Addressed
07/02/2025
Objection raised — Cost
06/25/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF EXISTING 2 APARTMENTS @ 2nd AND 3rd FLOOR AS SHOWN ON PLANS. NO CHANGE IN USE, EGREES OR OCCUPANCY.
Q00597098-P1
06/17/2025
Filed — Alteration
Proposed Plumbing work in Apartments at 2nd and 3rd Floor, as shown on plans. Filed in Conjunction with Job no. Q00597098.
Q00629715-P1
06/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
MARIJA RISTIC
06/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
MARIJA RISTIC
06/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MARIJA RISTIC
03/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
MARIJA RISTIC
03/26/2025
Special inspection requirement — Lighting controls
MARIJA RISTIC
03/26/2025
Special inspection requirement — Air barrier - visual inspection
MARIJA RISTIC
03/26/2025
Special inspection requirement — Fenestration air leakage
MARIJA RISTIC
03/26/2025
Special inspection requirement — Fenestration areas
MARIJA RISTIC
03/26/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MARIJA RISTIC
03/26/2025
Special inspection requirement — Lighting in dwelling units
MARIJA RISTIC
03/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARIJA RISTIC
03/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARIJA RISTIC
03/26/2025
Special inspection requirement — Mechanical Systems
MARIJA RISTIC
03/26/2025
Special inspection requirement — Energy Code Compliance Inspections
MARIJA RISTIC
03/26/2025
Special inspection requirement — Final
MARIJA RISTIC
10/02/2024
Permit issued — Plumbing
Q00629715-I1-PL
10/02/2024
Permit issued — General Construction
Q00597098-I1-GC-CX
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/05/2023
Permit issued — General Construction
Q00597098-I1-GC-CX
10/03/2023
Permit issued — Plumbing
Q00629715-I1-PL
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/01/2022
Filed — Alteration
Proposed Plumbing work in Apartments at 2nd and 3rd Floor, as shown on plans. Filed in Conjunction with Job no. Q00597098.
Q00629715-I1
11/12/2021
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF EXISTING 2 APARTMENTS @ 2nd AND 3rd FLOOR AS SHOWN ON PLANS. NO CHANGE IN USE, EGREES OR OCCUPANCY.
Q00597098-I1
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offD.D.S. Mechanical PBG & Heating10/02/2024
DOB NOWGeneral ConstructionSigned-offD.D.S. Mechanical Plumbing10/02/2024
DOB NOWGeneral ConstructionSigned-offD.D.S. Mechanical Plumbing10/05/2023
DOB NOWPlumbingSigned-offD.D.S. Mechanical PBG & Heating10/03/2023
BIS—ISSUEDJoanne's Construction Co01/13/2021
BISFPISSUEDNY Fire03/11/2016
BISPLISSUEDS & L Plumbing11/24/2015
BISOTISSUEDGlobal Group Industries11/24/2015
BISPLISSUEDAll Pro Plumbing & Heating06/05/2012
BISFPISSUEDUnique Fire Systems04/05/2012
BISOTISSUEDA International01/20/2012
BIS—ISSUEDLazaridis Brothers Construction12/13/2011
BISPLISSUEDNM Mechanical12/13/2011
BISMHISSUEDA International12/05/2011
BISPLISSUEDAll Pro Plumbing & Heating07/11/2011
BISOTISSUEDA International06/24/2011
BISPLISSUEDN & D Plumbing & Heating02/17/1999
BIS—ISSUEDReno General Construction01/20/1999
BISFPISSUEDProtection System Specialists03/16/1990
BISPLISSUEDUS-1 P&H03/06/1990
BISOTISSUEDJR Grech Construction01/23/1990
1 project · most recent 08/13/2025
General Wiring
FiledStatusContractorScope
08/13/2025CompleteXtreme ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/14/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/30/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/24/2025Fail-Final General Construction Non-Directive 14FailView ↗
12/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
07/08/2025Fire-Resistant Penetrations and JointsMARIJA RISTICspecial
06/16/2025HVAC-R and service water heating system controlsMARIJA RISTICenergy_progress
06/16/2025HVAC-R and service water heating equipmentMARIJA RISTICenergy_progress
06/16/2025HVAC-R and service water piping design and insulationMARIJA RISTICenergy_progress
03/26/2025Fire-Resistance Rated ConstructionMARIJA RISTICprogress
03/26/2025Lighting controlsMARIJA RISTICenergy_progress
03/26/2025Air barrier - visual inspectionMARIJA RISTICenergy_progress
03/26/2025Fenestration air leakageMARIJA RISTICenergy_progress
03/26/2025Fenestration areasMARIJA RISTICenergy_progress
03/26/2025Fenestration and door U-factor and product ratingsMARIJA RISTICenergy_progress
03/26/2025Lighting in dwelling unitsMARIJA RISTICenergy_progress
03/26/2025Fire-Resistant Penetrations and JointsMARIJA RISTICspecial
03/26/2025Fire-Resistant Penetrations and JointsMARIJA RISTICspecial
03/26/2025Mechanical SystemsMARIJA RISTICspecial
03/26/2025Energy Code Compliance InspectionsMARIJA RISTICprogress
03/26/2025FinalMARIJA RISTICprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Athanasiades Cultural FoundationArts / Culture / EntertainmentFloors 2, 3
Project Q00629715 Alteration · LOC Issued · 02/01/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026Q00597098-I1Request digital key ↗
08/19/2026Q00597098-P1Request digital key ↗
▸Applications & Permits18
▸BISWORK PERMIT APPLICATION10
03/25/2021400896492Open ↗
03/17/2016421272492Open ↗
12/02/2015421241365Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
03/09/2016421272492Open ↗
12/02/2015421241365Open ↗
12/07/2011420371555Open ↗
Showing 3 of 7 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
03/15/2016421241365Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature12
08/30/2026Q00597098-P1Open ↗
08/30/2026Q00597098-P1Open ↗
08/30/2026Q00597098-P1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
03/15/2016421241365Open ↗
12/02/2015421241365Open ↗
07/23/2012420371555Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/30/2026Q00597098-P1Open ↗
08/30/2026Q00597098-P1Open ↗
08/28/2026Q00629715-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
06/27/2011420371555Open ↗
06/27/2011420371555Open ↗
06/27/2011420371555Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/02/2015421241365Open ↗
06/27/2011420371555Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026Q00597098-I1Open ↗
08/13/2026Q00597098-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/02/2015421241365Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING3
11/25/2011420507838Open ↗
11/15/2011420371555Open ↗
06/27/2011420371555Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
06/12/2012420371555Open ↗
06/12/2012420507838Open ↗
05/24/2012420371555Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/02/2015421241365Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
11/25/2011420507838Open ↗
06/27/2011420371555Open ↗
▸Environmental & Asbestos6
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
11/25/2011420507838Open ↗
06/27/2011420371555Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
03/09/2016421272492Open ↗
12/02/2015421241365Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026Q00597098-I1Open ↗
08/13/2026Q00597098-P1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/15/2016421241365Open ↗
12/02/2015421241365Open ↗
▸BISTECHNICAL REPORT: ENERGY2
11/25/2011420507838Open ↗
06/27/2011420371555Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
03/15/2016421241365Open ↗
07/23/2012420371555Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00597098-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS4
03/09/2016421272492Open ↗
12/02/2015421241365Open ↗
11/25/2011420507838Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
05/02/2016421272492Open ↗
03/15/2016421241365Open ↗
07/23/2012420371555Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
05/02/2016421272492Open ↗
03/15/2016421241365Open ↗
03/09/2016421272492Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET4
03/09/2016421272492Open ↗
12/02/2015421241365Open ↗
11/25/2011420507838Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
03/25/2021400896492Open ↗
▸Other Documents2
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS2
06/12/2012420371555Open ↗
05/02/2016421272492Open ↗