← Back
Office with commercial, 7-19 stories
30 BAY STREET
STATEN ISLAND · BIN 5000028
💬 Discuss this project
1924Year Built
7Stories
O6Building Class
C4-2Zoning
31,500 sfGross Floor Area
1Units
58 Open Violations 55 unresolved · 3 paperwork only ▸FDNY Report ↗
Office with commercial, 7-19 stories · 10,000 sf lot · 3.15 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof10p · 2 filings · 8 docs
Floor 310p · 4 filings · 20 docs
Floor 28p · 4 filings · 20 docs
Floor 1
Cellar1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THIRTY BAY ST CO3007/08/2026
30 BAY ST CO203/22/2026
BUILDCOX CONSTRUCTION CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.103/06/2025
ASHRAF CORP104/08/2022
GC ENG & ASSOCIATES, PC207/19/2021
TERRENCE O'NEAL ARCHITECT LLC307/07/2021
R SCOTT LEWIS PE PC209/15/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.1003/21/2026
BUILDING BROTHERS403/21/2026
Rigid Structural Design, LLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FM95NY LLCGeneral Contractor407/08/2026
2323 DEVELOPMENT CORPGeneral Contractor407/08/2026
BUILDCOX CONSTRUCTION CORGeneral Contractor303/21/2026
RICHARD NEUElectrical103/22/2026
SETANTA INCGeneral Contractor107/08/2026
ACCESS PLUMBING CORPPlumbing107/08/2026
FM95 NYScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COLE TECHNOLOGIES/CONTROL1290207/13/2021
SOIL MECHANICS DRILLING C2325109/15/2020
Building Lifecycle
All (114)Filed (9)Permit Issued (10)Signed Off (6)Violation (60)Inspection (5)Objection (8)Special Inspection (16)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/23/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/11/2025
Permit issued — Boiler Equipment
S01183421-I1-BE
03/06/2025
Filed — Alteration
FILING OF REPLACEMENT BOILER AND OIL BURNER FILED IN CONJUNCTION WITH EWN-S00242755. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01183421-I1
03/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Bazini
03/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Bazini
03/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/17/2024
Violation issued (ECB, open)
Boilers
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/06/2023
Signed off — Alteration
EXISTING NON-CONFORMING ADVERTISING SIGN WITH CHANGEABLE COPY. STRUCTURE FILED UNDER SEPARATE APPLICATION.
S00343834-I1
08/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/23/2023
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/10/2022
Signed off — Alteration
Modification to HVAC system as per plans filed herewith. No change in use egress or occupancy under this application.
S00502898-I1
11/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/13/2022
Signed off — Alteration
Interior renovation on the 2nd and3rd floor as per plans filed herewith. No change in use egress or occupancy under this application.
S00502884-I1
08/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/29/2022
Signed off — Alteration
Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
S00711683-I1
06/01/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/11/2022
Permit issued — Sidewalk Shed
S00711683-I1-SH
04/08/2022
Filed — Alteration
Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
S00711683-I1
03/31/2022
Signed off — Alteration
Removal of remove interior partitions and doors at 2nd and 3rd floor as per plans. No change in use egress or occupancy under this applciation.
S00481589-I1
03/30/2022
Signed off — Alteration
Modification to plumbing fixtures as per plans filed herewith. No change in use, egress, or occupancy under this application.
S00546200-I1
03/21/2022
Permit issued — Structural
S00343772-I1-ST
03/01/2022
Permit issued — Structural
S00343772-I1-ST
02/16/2022
Permit issued — Sign
S00343834-I1-SG
02/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/02/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/21/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/19/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/14/2021
Permit issued — Plumbing
S00546200-I1-PL
10/14/2021
Permit issued — General Construction
S00502884-I1-GC
09/09/2021
Permit issued — General Construction
S00502884-I1-GC
09/09/2021
Permit issued — Mechanical Systems
S00502898-I1-MS
08/02/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/19/2021
Filed — Alteration
Modification to plumbing fixtures as per plans filed herewith. No change in use, egress, or occupancy under this application.
S00546200-I1
07/13/2021
Filed — Alteration
Modification to HVAC system as per plans filed herewith. No change in use egress or occupancy under this application.
S00502898-I1
07/07/2021
Filed — Alteration
Interior renovation on the 2nd and3rd floor as per plans filed herewith. No change in use egress or occupancy under this application.
S00502884-I1
06/02/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/11/2021
Permit issued — General Construction
S00481589-I1-GC
05/04/2021
Special inspection requirement — Final
Terrence O'Neal
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/22/2021
Filed — Alteration
Removal of remove interior partitions and doors at 2nd and 3rd floor as per plans. No change in use egress or occupancy under this applciation.
S00481589-P1
04/22/2021
Special inspection requirement — Final
04/13/2021
Special inspection requirement — Final
GEORGE ANDERSEN
Latest 60 of 114 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offMICHAEL S. KAPLAN03/11/2025
DOB NOWSidewalk ShedSigned-offBUILDCOX CONSTRUCTION COR04/11/2022
DOB NOWStructuralPermit IssuedFM95NY LLC03/21/2022
DOB NOWStructuralPermit IssuedFM95NY LLC03/01/2022
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT02/16/2022
DOB NOWPlumbingSigned-offACCESS PLUMBING CORP10/14/2021
DOB NOWGeneral ConstructionSigned-off2323 DEVELOPMENT CORP10/14/2021
DOB NOWGeneral ConstructionSigned-off2323 DEVELOPMENT CORP09/09/2021
DOB NOWMechanical SystemsSigned-off2323 DEVELOPMENT CORP09/09/2021
DOB NOWGeneral ConstructionSigned-offSETANTA INC05/11/2021
BISEQISSUEDROCKLEDGE SCAFFOLD CORP11/15/2011
BISMHISSUEDF & T SERVICE COMPANY LLC03/12/2004
BISMHISSUEDSCARAN PLBG INC.07/24/2000
4 projects · most recent 08/05/2026
General Wiring
FiledStatusContractorScope
08/05/2026Permit IssuedERIN ELEC'L CONTR'G INCORGeneral Wiring
08/15/2024CompleteALBA ELECTRIC CORP1 meters
04/11/2022CompleteRICHARD NEU—
03/24/2022CompleteLAREDO ELECTRIC, INC.General Wiring
1 project · most recent 09/15/2020
FiledStatusContractorScope
09/15/2020Permit IssuedFM95NY LLC1 scope_items
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/23/2025Pass-Final Boiler Equipment InspectionPassView ↗
06/23/2023Pass-Final Sign Permit InspectionPassView ↗
02/02/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/21/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/19/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
03/06/2025HVAC-R and service water piping design and insulationJoseph Bazinienergy_progress
03/06/2025HVAC-R and service water heating system controlsJoseph Bazinienergy_progress
03/06/2025HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
05/04/2021FinalTerrence O'Nealprogress
04/22/2021Final—progress
04/13/2021FinalGEORGE ANDERSENprogress
04/13/2021Ventilation and air distribution systemGEORGE ANDERSENenergy_progress
04/13/2021Lighting controlsGEORGE ANDERSENenergy_progress
04/13/2021Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
04/13/2021FinalGEORGE ANDERSENprogress
04/13/2021Interior lighting powerGEORGE ANDERSENenergy_progress
04/13/2021Mechanical SystemsGEORGE ANDERSENspecial
09/11/2020Structural Steel - DetailsSTEPHEN LAWNICZAKspecial
09/11/2020Structural Steel - WeldingSTEPHEN LAWNICZAKspecial
09/11/2020Structural Steel - High Strength BoltingSTEPHEN LAWNICZAKspecial
04/22/2020FinalSTEPHEN LAWNICZAKprogress
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch7
08/25/2026S00481589-P1Request digital key ↗
08/25/2026S00481589-I1Request digital key ↗
08/25/2026S00502884-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Structural1
08/15/2026S00343772-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
08/14/2026S00343834-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
11/17/2011520083757Open ↗
11/24/2008510061013Open ↗
▸BISWORK PERMIT APPLICATION2
11/17/2011520083757Open ↗
12/30/2008510061013Open ↗
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026S00343834-I1Open ↗
08/25/2026S00481589-I1Open ↗
08/25/2026S00481589-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/28/2026S00502884-I1Open ↗
09/28/2026S00502884-I1Open ↗
09/28/2026S00502884-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/28/2026S00502884-I1Open ↗
09/01/2026S00502898-I1Open ↗
08/27/2026S00343772-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/17/2011520083757Open ↗
11/24/2008510061013Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
11/17/2011520083757Open ↗
11/24/2008510061013Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/12/2009510061013Open ↗
▸Trade Schedules & Equipment2
▸BISEQUIPMENT USE PERMITS1
01/12/2009510061013Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
11/24/2008510061013Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026S00481589-P1Open ↗
08/25/2026S00481589-I1Open ↗
08/25/2026S00502898-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/24/2008510061013Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026S00502884-I1Open ↗
08/13/2026S00502898-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISADMINISTRATIVE OBJECTIONS2
11/17/2011520083757Open ↗
11/24/2008510061013Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
07/26/2012520083757Open ↗
01/05/2009510061013Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/17/2011520083757Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/12/2009510061013Open ↗
11/24/2008510061013Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
11/17/2011520083757Open ↗