← Back
Elevator cooperative
30 BOGARDUS PLACE
MANHATTAN · Washington Heights (North) · BIN 1064133
💬 Discuss this project
1941Year Built
6Stories
D4Building Class
R7-2Zoning
43,737 sfGross Floor Area
50Units
LL97 CoveredRent Stabilized9 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: MNK REALTY INC · 10,000 sf lot · 4.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilOther
Roof1p · 1 filing · 5 docs
Floor 16p · 1 filing · 3 docs
Cellar1 filing · 2 docs
Site & exterior6p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLUE WOODS MANAGEMENT GROUP, INC.1107/08/2026
30 BOGARDUS OWNERS603/21/2026
PHOENIX SUTTON STR INC503/22/2026
HKS CONSTRUCTION407/08/2026
MNK REALTY INC103/22/2026
J & N CONSTRUCTION GROUP103/21/2026
METRO MANAGEMENT DEVELOPMENT INC.103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS103/21/2026
MERRITT ENGINEERING CONSULTANT DPC203/21/2026
HAIDER ENGINEERING, P.E.103/21/2026
HAIDER ENGINEERING P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PHOENIX SUTTON STR INCGeneral Contractor203/21/2026
BRIAN FAERBERElectrical203/21/2026
IRVING BAPTISTEElectrical103/21/2026
JOE MIDDLETONElectrical103/21/2026
HKS CONSTRUCTION CORPGeneral Contractor107/08/2026
JRR CONTRACTING INCGeneral Contractor107/08/2026
CAPE PLUMBING INCPlumbing107/08/2026
HEMANCHAL DEONARINEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GEORGE J. XERAKIAS, PE1658111/26/2024
MASTROGIACOMO ENGINEERING4237111/13/2024
COWLEY ENGINEERING186101/10/2023
MERRITT ENGINEERING CONSU460101/10/2023
Building Lifecycle
All (91)Filed (5)Permit Issued (5)Signed Off (3)Facade (FISP) (12)Violation (49)Inspection (7)Special Inspection (10)
07/07/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/07/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
07/01/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/01/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/01/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/11/2025
Signed off — Alteration
Installation of outriggers & hoist for facade repair & inspection.
M01147506-I1
12/10/2024
Permit issued — Suspended Scaffold
M01147506-I1-SC
11/27/2024
Permit issued — Plumbing
M01125581-I1-PL
11/26/2024
Filed — Alteration
Installation of outriggers & hoist for facade repair & inspection.
M01147506-I1
11/25/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
11/25/2024
Special inspection requirement — Post-installed Anchors
George Xerakias
11/13/2024
Filed — Alteration
M01125581-I1
04/04/2024
Signed off — Alteration
FACADE RESTORATION INCLUDING INDOW LINTEL REPLACEMENT, MASONRY REPLACEMENT, MORTAR RE-POINTING, SILL REPLACEMENT, LINTEL PAINT AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00809977-I1
02/20/2024
Cycle 9 facade report submitted
02/16/2024
Cycle 9 facade report signed — SAFE
02/05/2024
Cycle 9 facade inspection completed
01/03/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/29/2023
Signed off — Alteration
M00878884-I1
07/18/2023
Permit issued — General Construction
M00809977-I1-GC
05/25/2023
Permit issued — Sidewalk Shed
M00878884-I1-SH
05/24/2023
Filed — Alteration
M00878884-I1
01/10/2023
Filed — Alteration
FACADE RESTORATION INCLUDING INDOW LINTEL REPLACEMENT, MASONRY REPLACEMENT, MORTAR RE-POINTING, SILL REPLACEMENT, LINTEL PAINT AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00809977-I1
01/09/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Eric Cowley
01/09/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christopher Krepcio
01/09/2023
Special inspection requirement — Energy Code Compliance Inspections
Christopher Krepcio
01/09/2023
Special inspection requirement — Tenant Protection Plan Compliance
Eric Cowley
01/09/2023
Special inspection requirement — Fenestration air leakage
Christopher Krepcio
01/09/2023
Special inspection requirement — Air barrier - visual inspection
Christopher Krepcio
01/09/2023
Special inspection requirement — Final
Christopher Krepcio
01/09/2023
Special inspection requirement — Masonry
Christopher Krepcio
03/02/2020
Violation issued (ECB, closed)
Construction
09/15/2019
Cycle 8 facade report signed — SAFE
09/12/2019
Cycle 8 facade report submitted
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/03/2019
Cycle 8 facade inspection completed
07/31/2019
Violation issued (HPD, open)
B
05/02/2019
Violation issued (ECB, closed)
Construction
05/02/2019
Violation issued (ECB, closed)
Construction
05/02/2019
Violation issued (ECB, closed)
Construction
05/02/2019
Violation issued (ECB, closed)
Construction
05/02/2019
Violation issued (ECB, closed)
Cranes and Derricks
05/02/2019
Violation issued (ECB, closed)
Construction
05/02/2019
Violation issued (ECB, closed)
Construction
05/02/2019
Violation issued (ECB, closed)
Construction
05/02/2019
Violation issued (ECB, closed)
Construction
05/02/2019
Violation issued (ECB, closed)
Construction
05/02/2019
Violation issued (ECB, closed)
Construction
05/02/2019
Violation issued (ECB, closed)
Construction
05/02/2019
Violation issued (ECB, closed)
Construction
05/02/2019
Violation issued (ECB, closed)
Construction
05/01/2019
Violation issued (ECB, closed)
Construction
05/01/2019
Violation issued (ECB, closed)
Construction
05/01/2019
Violation issued (ECB, closed)
Construction
04/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/21/2019
Permit issued — Sidewalk Shed
M00131183-I1-SH
02/20/2019
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00131183-I1
12/20/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/06/2017
Violation issued (HPD, closed)
I
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offJRR CONTRACTING INC12/10/2024
DOB NOWPlumbingPermit IssuedCAPE PLUMBING INC11/27/2024
DOB NOWGeneral ConstructionSigned-offJRR CONTRACTING INC07/18/2023
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC05/25/2023
DOB NOWSidewalk ShedPermit IssuedHKS CONSTRUCTION CORP02/21/2019
BISOTISSUEDREAL DEPENDABL CONTR CORP06/10/2019
BISOTISSUEDREAL DEPENDABL CONTR CORP04/23/2019
BISEQISSUEDJ & N CONSTRUCTION GROUP05/21/2012
BISOTISSUEDSIENA CONSTRUCTION LTD06/22/2009
BISEQISSUEDBAY RESTORATION CORP10/04/2006
BISBLISSUEDBETA STEAM & POWER,INC.08/20/1991
3 projects · most recent 05/23/2023
General Wiring
FiledStatusContractorScope
05/23/2023CompleteELPO ELECTRICAL CONTG INC—
08/06/2020CompleteCENTURY ELECTRIC LLCGeneral Wiring
02/11/2019Permit IssuedRICHARD NEU—
1 project · most recent 02/20/2019
Sidewalk Shed
FiledStatusContractorScope
02/20/2019Permit IssuedHKS CONSTRUCTION CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/07/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/07/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/01/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/01/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/03/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
11/25/2024Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
11/25/2024Post-installed AnchorsGeorge Xerakiasspecial
01/09/2023Construction Operations Influencing Adjacent StructuresEric Cowleyspecial
01/09/2023Structural Stability – Alterations of existing buildingsChristopher Krepciospecial
01/09/2023Energy Code Compliance InspectionsChristopher Krepcioprogress
01/09/2023Tenant Protection Plan ComplianceEric Cowleyspecial
01/09/2023Fenestration air leakageChristopher Krepcioenergy_progress
01/09/2023Air barrier - visual inspectionChristopher Krepcioenergy_progress
01/09/2023FinalChristopher Krepcioprogress
01/09/2023MasonryChristopher Krepciospecial
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch4
09/01/2026M00809977-I1Request digital key ↗
08/31/2026M00878884-I1Request digital key ↗
08/25/2026M01125581-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00131183-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION6
03/27/2019123454243Open ↗
03/26/2019123454243Open ↗
11/15/2018123454243Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION4
06/11/2019123454243Open ↗
04/24/2019123454243Open ↗
05/23/2012121084352Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications19
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
07/15/2019123454243Open ↗
11/14/2018123454243Open ↗
12/02/2009120058267Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026M00809977-I1Open ↗
08/31/2026M00878884-I1Open ↗
08/25/2026M01125581-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026M00809977-I1Open ↗
08/29/2026M00809977-I1Open ↗
08/28/2026M01147506-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/14/2018123454243Open ↗
05/22/2012121084352Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026M00809977-I1Open ↗
08/29/2026M00809977-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/14/2018123454243Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/22/2012121084352Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
11/14/2018123454243Open ↗
▸Environmental & Asbestos3
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
04/24/2019123454243Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/08/2009120058267Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/01/2026M00809977-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
07/15/2019123454243Open ↗
11/14/2018123454243Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/15/2019123454243Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
07/15/2019123454243Open ↗
12/02/2009120058267Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
05/22/2012121084352Open ↗
06/08/2009120058267Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/15/2019123454243Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
07/15/2019123454243Open ↗
11/14/2018123454243Open ↗
12/02/2009120058267Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
11/14/2018123454243Open ↗
05/22/2012121084352Open ↗
▸BISBOROUGH INTAKE FORM2
07/15/2019123454243Open ↗
03/26/2019123454243Open ↗
▸Other Documents3
▸DOB NOWManufacturer's Specifications1
08/13/2026M01147506-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026M00131183-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01147506-I1Open ↗