← Back
Condo, office space
Cps Medical Condominium
30 CENTRAL PARK SOUTH · BIN 1035257
💬 Discuss this project
1921Year Built
14Stories
RBBuilding Class
R10HZoning
47,314 sfGross Floor Area
55Units
LL97 Covered3 Open Violations 2 unresolved · 1 paperwork only ▸FISP: SAFE
Condo, office space · Owner of record: 30 CENTRAL PK S MDCL CONDO · 5,020 sf lot · 9.43 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 3 docs
Floor 518p · 2 filings · 7 docs
Floor 4
Floor 3
Floor 2Under Construction7p · 1 filing · 7 docs
Floor 1
Cellar1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLENHEIM REALTY709/03/2026
515 SEVENTH AVENUE REALTY L P1407/08/2026
720-730 FORT WASHINGTON AVE OWNERS907/08/2026
LEMX CORP503/22/2026
30 CENTRAL PK S MDCL COND103/22/2026
30 CENTRAL PARK S MDCL CO103/22/2026
CENTRAL PARK SOUTH MEDICAL CONDO2203/22/2026
OWNER OF 30 C,P.S103/22/2026
CINZIAROCCA103/22/2026
30 CPS REALTY1503/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RITE ONE EXPEDITING203/21/2026
AE DESIGN SOLUTION403/21/2026
AGOUTI CONSTRUCTION CONSULTING203/21/2026
JENNY FLORES EXPEDITING303/21/2026
MODERN BUILDING CONSULTANT103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PUMA CONSTRUCTION CORPGeneral Contractor507/08/2026
LEMX CORPGeneral Contractor303/21/2026
JZ CONSTRUCTION GROUP INCGeneral Contractor303/21/2026
AMERICAN POWER ELECT CONSElectrical203/22/2026
MIKHAIL UMANSKIYElectrical203/21/2026
BUILDOPS INCGeneral Contractor107/08/2026
RAIDEN ELECTRIC, LLCElectrical103/22/2026
MKSSKR CONSULTING SERVICEGeneral Contractor104/09/2026
PRESERV BLD RESTOR MGT INGeneral Contractor107/08/2026
INTER CONNECTION ELETRICElectrical103/22/2026
GREGG NY PLUMBING, INCPlumbing109/03/2026
NICE PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LEO Y LEE ASSOCIATES2481201/05/2024
MSM ENGINEERING SERVICES,8449102/16/2023
ROBERT F. GERMAIN JR. PE5100106/15/2022
ANZ CONSULTING ENGINEERIN3946310/18/2021
Building Lifecycle
All (107)Filed (11)Permit Issued (13)Signed Off (3)Facade (FISP) (18)Violation (44)Inspection (3)Special Inspection (15)
09/02/2026
Permit issued — Plumbing
M01249595-S1-PL
08/12/2026
Violation issued (ECB, open)
Elevators
07/30/2025
Permit issued — General Construction
M01249595-I1-GC
07/15/2025
Filed — Alteration
RENOVATION OF EXISTING DENTAL OFFICE AS PER PLANS HEREWITH FILED.
M01249595-S1
07/15/2025
Filed — Alteration
RENOVATION OF EXISTING DENTAL OFFICE AS PER PLANS HEREWITH FILED.
M01249595-I1
07/01/2025
Special inspection requirement — Final
PETER SHINODA
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/11/2024
Cycle 9 facade report signed — SAFE
05/05/2024
Cycle 9 facade report submitted
04/30/2024
Signed off — Alteration
Localized repairs to building's facades related to FISP Cycle 9A, as per plans filed herewith. No change to use, egress, or occupancy.
M00887806-I1
03/12/2024
Cycle 9 facade inspection completed
01/17/2024
Permit issued — Suspended Scaffold
M00969627-P1-SC
01/17/2024
Special inspection requirement — Post-installed Anchors
Leo Lee
01/05/2024
Filed — Alteration
Installation of suspended scaffold for facade work or inspection. PAA1 amend Change in tieback and lifeline
M00969627-P1
01/05/2024
Special inspection requirement — Post-installed Anchors
Leo Lee
12/22/2023
Permit issued — Suspended Scaffold
M00969627-I1-SC
12/08/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00912680-I1
12/07/2023
Filed — Alteration
Installation of suspended scaffold for facade work or inspection. PAA1 amend Change in tieback and lifeline
M00969627-I1
12/05/2023
Permit issued — General Construction
M00887806-I1-GC
10/16/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/02/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00912680-I1
08/02/2023
Permit issued — Sidewalk Shed
M00912680-I1-SH
07/19/2023
Signed off — Alteration
Propose interior renovation @ 1st floor unit#1A of existing commercial office with partition and finish work as per plan. No change in use, egress & occupancy.
M00829084-I1
07/11/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/14/2023
Filed — Alteration
Localized repairs to building's facades related to FISP Cycle 9A, as per plans filed herewith. No change to use, egress, or occupancy.
M00887806-I1
02/27/2023
Permit issued — General Construction
M00829084-I1-GC
02/16/2023
Filed — Alteration
Propose interior renovation @ 1st floor unit#1A of existing commercial office with partition and finish work as per plan. No change in use, egress & occupancy.
M00829084-I1
02/14/2023
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
02/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
02/14/2023
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
02/14/2023
Special inspection requirement — Lighting in dwelling units
MOHAMED MAHMOUD
02/14/2023
Special inspection requirement — Interior lighting power
MOHAMED MAHMOUD
02/07/2023
Permit issued — General Construction
M00558753-I1-GC
12/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/24/2022
Cycle 9 facade report signed — SWARMP
06/21/2022
Permit issued — Boiler Equipment
M00741785-I1-BE
06/15/2022
Filed — Alteration
M00741785-I1
04/29/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/29/2022
Permit issued — Mechanical Systems
M00558806-I1-MS
03/29/2022
Permit issued — General Construction
M00558753-I1-GC
03/16/2022
Permit issued — Plumbing
M00558863-I1-PL
03/14/2022
Permit issued — General Construction
M00558753-I1-GC
02/21/2022
Cycle 9 facade report submitted
02/10/2022
Cycle 9 facade inspection completed
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/18/2021
Filed — Alteration
HEREBY FILING FOR THE REMOVAL AND INSTALLATION OF MECHANICAL EQUIPMENT. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M00558806-I1
10/18/2021
Filed — Alteration
HEREBY FILING FOR THE EXPANSION OF DENTAL OFFICE FROM SUITES BC TO SUITE BCD. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M00558753-I1
10/18/2021
Filed — Alteration
HEREY FILING FOR THE REMOVAL REPLACEMENT AND RELOCATION OF PLUMBING FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M00558863-I1
09/30/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERT ZIRINO
09/30/2021
Special inspection requirement — Fenestration air leakage
ALBERT ZIRINO
09/30/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
ALBERT ZIRINO
07/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERT ZIRINO
07/15/2021
Special inspection requirement — Final
ALBERT ZIRINO
07/15/2021
Special inspection requirement — Interior lighting power
ALBERT ZIRINO
07/15/2021
Special inspection requirement — Energy Code Compliance Inspections
ALBERT ZIRINO
11/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/23/2018
Violation issued (ECB, open)
Unknown
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedGREGG NY PLUMBING, INC09/02/2026
DOB NOWGeneral ConstructionPermit IssuedMKSSKR CONSULTING SERVICE07/30/2025
DOB NOWSuspended ScaffoldPermit IssuedPRESERV BLDG REST MNGT IN01/17/2024
DOB NOWSuspended ScaffoldPermit IssuedPRESERV BLDG REST MNGT IN12/22/2023
DOB NOWGeneral ConstructionSigned-offPRESERV BLD RESTOR MGT IN12/05/2023
DOB NOWSidewalk ShedSigned-offLEMX CORP08/02/2023
DOB NOWGeneral ConstructionSigned-offJZ CONSTRUCTION GROUP INC02/27/2023
DOB NOWGeneral ConstructionSigned-offBUILDOPS INC02/07/2023
DOB NOWBoiler EquipmentSigned-offC C CONTROLLED COMBUSTION06/21/2022
DOB NOWMechanical SystemsPermit IssuedINTERBORO SIGN & ELECTRIC03/29/2022
DOB NOWGeneral ConstructionSigned-offINTERBORO SIGN & ELECTRIC03/29/2022
DOB NOWPlumbingPermit IssuedNICE PLUMBING CORP03/16/2022
DOB NOWGeneral ConstructionSigned-offINTERBORO SIGN & ELECTRIC03/14/2022
BISOTISSUEDPRECISION WORLDWIDE09/18/2018
BISPLISSUEDZARA PLUMBING CORP06/26/2018
BISOTISSUEDPRECISION WORLDWIDE06/07/2018
BISPLISSUEDCATMAN PLUMBING INC12/28/2017
BISOTISSUEDNOBLE STAR CONSTRUCTION C12/26/2017
BISPLISSUEDVSP MECHANICAL INC08/11/2017
BISOTISSUEDVINO CONSTRUCTION INC07/31/2017
BISPLISSUEDKATAN P & H INC08/25/2016
BISMHISSUEDCARMELO BLANCO08/16/2016
BISOTISSUEDCARMELO BLANCO08/12/2016
BISPLISSUEDARCO PLBG AND HTG INC05/09/2016
BISOTISSUEDVINO CONSTRUCTION INC04/29/2016
BISPLISSUEDAMERICAN PLUMBING & HTNG01/04/2016
BISOTISSUEDVINO CONSTRUCTION INC01/04/2016
BISOTISSUEDMASI CONSTRUCTION INC12/22/2015
BISPLISSUEDARCO PLBG AND HTG INC09/11/2015
BISOTISSUEDVINO CONSTRUCTION INC09/03/2015
BISOTISSUEDPUMA CONSTRUCTION CORP03/11/2015
BISSPISSUEDPINNACLE PLBG & HTG CORP12/08/2011
BISPLISSUEDPINNACLE PLBG & HTG CORP12/08/2011
BISMHISSUEDTENTA NY CORP12/06/2011
BISOTISSUEDTENTA NY CORP12/06/2011
BISMHISSUEDTAI DESIGNS INC07/22/2011
BISOTISSUEDHIGH POWER CONSTR. CORP01/05/2011
BISMHISSUEDHIGH POWER CONSTR. CORP12/30/2010
BISOTISSUEDHIGH POWER CONSTR. CORP10/08/2010
BISPLISSUEDCK PLUMBING & MECH INC09/27/2010
+ 23 more permits on file
1 project · most recent 10/18/2021
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/18/2021Permit IssuedPUMA CONSTRUCTION CORPAir Conditioning Systems
Cooling
Aaon WHA-018B-0-C-2-0A0-00:0B-FB-0A-A0-C 550 CFM ×2
WHA-024-C-0-C-2-0A0-00:C 800 CFM · Rooftop Unit ×2
2 projects · most recent 07/15/2025
Water/Sanitary Medical Gas
FiledStatusContractorScope
07/15/2025Permit IssuedGREGG NY PLUMBING, INCWater/Sanitary
10/18/2021Permit IssuedLEVEL UP PLUMBING CORPMedical Gas, Water/Sanitary
14 projects · most recent 06/25/2025
General Wiring Boiler Controls Lighting
FiledStatusContractorScope
06/25/2025CompleteCMY ELECTRICAL CORPGeneral Wiring
01/28/2025CompleteAMERICAN POWER ELECT CONSGeneral Wiring
06/12/2024CompleteINTER CONNECTION ELETRICGeneral Wiring
02/13/2024CompleteAMERICAN POWER ELECT CONSGeneral Wiring
02/13/2024CompleteAMERICAN POWER ELECT CONSGeneral Wiring
02/07/2024CompleteAMERICAN POWER ELECT CONSGeneral Wiring
02/07/2024CompleteAMERICAN POWER ELECT CONSGeneral Wiring
02/06/2024CompleteAMERICAN POWER ELECT CONSGeneral Wiring
02/06/2024CompleteAMERICAN POWER ELECT CONSGeneral Wiring
02/06/2024CompleteAMERICAN POWER ELECT CONSGeneral Wiring
08/02/2023CompleteRICHARD NEU—
01/13/2023CompleteKRAFT ELECTRIC CORPBoiler Controls
03/21/2019Permit IssuedRAIDEN ELECTRIC LLCGeneral Wiring, Lighting
12/22/2017Permit IssuedELMAC ELECTRIC INC.General Wiring
1 project · most recent 01/05/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
01/05/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/16/2023Pass-Final Boiler Equipment InspectionPassView ↗
07/11/2023Pass-Final General Construction Non-Directive 14PassView ↗
04/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
07/01/2025FinalPETER SHINODAprogress
01/17/2024Post-installed AnchorsLeo Leespecial
01/05/2024Post-installed AnchorsLeo Leespecial
02/14/2023Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
02/14/2023Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
02/14/2023Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
02/14/2023Lighting in dwelling unitsMOHAMED MAHMOUDenergy_progress
02/14/2023Interior lighting powerMOHAMED MAHMOUDenergy_progress
09/30/2021Fire-Resistant Penetrations and JointsALBERT ZIRINOspecial
09/30/2021Fenestration air leakageALBERT ZIRINOenergy_progress
09/30/2021Fenestration and door U-factor and product ratingsALBERT ZIRINOenergy_progress
07/15/2021Fire-Resistant Penetrations and JointsALBERT ZIRINOspecial
07/15/2021FinalALBERT ZIRINOprogress
07/15/2021Interior lighting powerALBERT ZIRINOenergy_progress
07/15/2021Energy Code Compliance InspectionsALBERT ZIRINOprogress
▾Documents — 432 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/03/2026M00558863-I1Request digital key ↗
09/03/2026M00558806-I1Request digital key ↗
09/03/2026M00558753-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits94
▸BISPLAN / WORK APPROVAL APPLICATION51
10/22/2024124040821Open ↗
08/20/2024124040812Open ↗
05/07/2024104561653Open ↗
Showing 3 of 51 on file for this type
▸BISWORK PERMIT APPLICATION40
09/20/2018140728639Open ↗
09/20/2018140728639Open ↗
06/26/2018140728639Open ↗
Showing 3 of 40 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
12/28/2017123302381Open ↗
12/28/2017123302381Open ↗
12/28/2017123302381Open ↗
▸Seals & Professional Certifications86
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION35
09/16/2019122771571Open ↗
09/16/2019122771571Open ↗
08/07/2019140728639Open ↗
Showing 3 of 35 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
02/29/2024104561653Open ↗
11/17/2022103731641Open ↗
10/25/2022103731641Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/03/2026M00558863-I1Open ↗
09/02/2026M00741785-I1Open ↗
08/22/2026M01249595-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/07/2026M01249595-I1Open ↗
09/02/2026M00558753-I1Open ↗
09/02/2026M00558753-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
01/03/2018140728639Open ↗
10/30/2017123147521Open ↗
08/04/2017123302381Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026M00558753-I1Open ↗
09/01/2026M00829084-I1Open ↗
08/28/2026M00969627-P1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/03/2018140728639Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/03/2018140728639Open ↗
▸Trade Schedules & Equipment32
▸BISSCHEDULE B - PLUMBING10
01/03/2018140728639Open ↗
Showing 1 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
10/03/2018140728639Open ↗
12/29/2017123302381Open ↗
10/30/2017123147521Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
03/15/2018104458506Open ↗
Showing 1 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes4
10/30/2017123147521Open ↗
08/04/2017123302381Open ↗
08/16/2016122863044Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BIS* TENANT PROTECTION PLAN MEMO1/6/841
08/05/2022103731641Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos21
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
01/03/2018140728639Open ↗
10/30/2017123147521Open ↗
08/04/2017123302381Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/02/2026M00741785-I1Open ↗
08/22/2026M01249595-S1Open ↗
08/22/2026M01249595-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/03/2026M00558863-I1Open ↗
08/13/2026M00558753-I1Open ↗
08/13/2026M00558806-I1Open ↗
▸Energy Compliance34
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
09/16/2019122771571Open ↗
09/16/2019122771571Open ↗
08/07/2019140728639Open ↗
Showing 3 of 17 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
09/16/2019122771571Open ↗
08/07/2019140728639Open ↗
11/27/2018123147521Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/07/2018140728639Open ↗
01/03/2018140728639Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/03/2018140728639Open ↗
▸BISNYCECC ANALYSIS1
01/03/2018140728639Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00558753-I1Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY13
05/06/2024104561653Open ↗
05/03/2024104561653Open ↗
05/02/2024104561653Open ↗
Showing 3 of 13 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19752
02/19/2024104561653Open ↗
08/05/2022103731641Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
08/07/2019140728639Open ↗
09/27/2017122863044Open ↗
▸BIS2008 CODE TR1 REQUIRED1
01/03/2018140728639Open ↗
▸Approvals, Objections & Sign-offs39
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST29
05/07/2024104561653Open ↗
07/12/2023103357092Open ↗
07/12/2023103439487Open ↗
Showing 3 of 29 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
08/04/2017123302381Open ↗
08/16/2016122863044Open ↗
Showing 2 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
07/27/2023104458506Open ↗
▸Cost, Insurance & Ownership31
▸BISCOST AFFIDAVIT30
09/16/2019122771571Open ↗
08/07/2019140728639Open ↗
11/27/2018123147521Open ↗
Showing 3 of 30 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/19/2024104561653Open ↗
▸Filing & Intake Forms44
▸BISBOROUGH INTAKE FORM18
12/03/2019104458506Open ↗
09/16/2019122771571Open ↗
09/09/2019104458506Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING COVER SHEET15
10/22/2024124040821Open ↗
08/20/2024124040812Open ↗
10/30/2017123147521Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION10
03/20/2025124040821Open ↗
10/25/2022103731641Open ↗
07/26/2019140728639Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
01/03/2018140728639Open ↗
▸Other Documents14
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7793
05/01/2024104561653Open ↗
05/01/2024104561653Open ↗
08/05/2022103731641Open ↗
▸BIS* NOISE CONTROL TESTS 27-768,769,7702
05/01/2024104561653Open ↗
05/01/2024104561653Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM2
03/20/2025124040821Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
08/28/2026M00969627-I1Open ↗
08/13/2026M00969627-P1Open ↗
▸DOB NOWCalculations2
08/28/2026M00969627-I1Open ↗
08/13/2026M00969627-P1Open ↗
▸BIS* FIRE STOPS 27-3451
08/05/2022103731641Open ↗