Miscellaneous one family
30 COLLEGE PLACE
BROOKLYN · BIN 3001837
💬 Discuss this project
1899Year Built
2Stories
A9Building Class
R7-1Zoning
2,695 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Miscellaneous one family · 1,640 sf lot · 1.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction34p · 5 filings · 20 docs
Bulkhead2p · 2 filings · 19 docs
Floor 3Under Construction15p · 1 filing · 20 docs
Floor 2Under Construction38p · 5 filings · 20 docs
Floor 1Under Construction35p · 4 filings · 20 docs
CellarUnder Construction40p · 5 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/20/2022$5.5M—— → —$2,041/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EP ENGINEERING LLC303/03/2026
SILMAN408/01/2025
STEPHEN MCNAMARA ARCHITECTURE PLLC807/30/2025
GZA GEOENVIRONMENTAL OF NEW YORK205/23/2024
DTLS.ARCHITECTURE102/01/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING3203/21/2026
KUSHNER STUDIOS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STEERING HOUSE CONSTRUCTGeneral Contractor3007/08/2026
DYNAMIC BLUE WATER MECHPlumbing208/14/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MACIA INSPECTION & TESTIN402803/03/2026
TRISTATE PLANNING ENGINEE8344509/05/2024
GZA GEOENVIRONMENTAL OF N1179205/23/2024
Building Lifecycle
All (159)Filed (17)Permit Issued (18)Signed Off (1)Violation (4)Inspection (9)Objection (80)Special Inspection (30)
08/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/17/2026
Signed off — Alteration CO
Proposed renovate existing single family house. Most of GC scope was filed under ALT-GC # B08031174 except new works for stairs & new bulkhead in this building are under this ALT-CO application. Obtain a new C of O.
B00805099-S1
08/13/2026
Permit issued — Plumbing
B01095417-I1-PL
05/14/2026
Permit issued — General Construction
B00805099-I1-GC
05/08/2026
Permit issued — Mechanical Systems
B01095401-I1-MS
03/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHUNG CHING JEN
03/03/2026
Filed — Alteration
B01095417-P1
02/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHUNG CHING JEN
02/04/2026
Permit issued — Mechanical Systems
B01095401-I1-MS
12/31/2025
Permit issued — Construction Fence
B00805099-S1-FN
12/24/2025
Violation issued (ECB, closed)
Construction
12/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/24/2025
Inspection — No Access-Final PL - Up to 9 Requested Floors
No Access
View inspection ↗
09/25/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/05/2025
Permit issued — General Construction
B00805099-I1-GC
09/04/2025
Special inspection requirement — Footing and Foundation
Nicholas Palumbo
09/04/2025
Special inspection requirement — Final
Nicholas Palumbo
08/22/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/22/2025
Objection resolved — Addressed
08/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
Nicholas Palumbo
08/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nicholas Palumbo
08/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Palumbo
08/20/2025
Permit issued — Structural
B08032647-I1-ST
08/08/2025
Permit issued — General Construction
B08031174-I1-GC
08/04/2025
Objection raised — Scope
08/01/2025
Filed — Alteration
Foundation filing as per plan in conjunction with GC # B08031174-P1.
B01055278-P1
07/30/2025
Filed — Alteration CO
Proposed renovate existing single family house. Most of GC scope was filed under ALT-GC # B08031174 except new works for stairs & new bulkhead in this building are under this ALT-CO application. Obtain a new C of O.
B00805099-P2
07/18/2025
Permit issued — Plumbing
B01095417-I1-PL
07/11/2025
Objection resolved — Addressed
07/11/2025
Objection resolved — Addressed
07/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHUNG CHING JEN
07/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHUNG CHING JEN
07/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
CHUNG CHING JEN
07/10/2025
Objection resolved — Addressed
06/26/2025
Special inspection requirement — Footing and Foundation
Jeffrey Stones
06/26/2025
Special inspection requirement — Final
Jeffrey Stones
06/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Stones
06/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jeffrey Stones
06/10/2025
Special inspection requirement — Interior lighting power
06/10/2025
Special inspection requirement — Final
Jeffrey Stones
06/10/2025
Special inspection requirement — Air barrier - visual inspection
06/10/2025
Special inspection requirement — Fenestration air leakage
06/10/2025
Special inspection requirement — Insulation placement and R values
06/10/2025
Special inspection requirement — Lighting in dwelling units
06/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
06/10/2025
Special inspection requirement — Fenestration areas
06/10/2025
Special inspection requirement — Air barrier — testing
06/05/2025
Special inspection requirement — Air barrier - visual inspection
Nicholas Palumbo
06/05/2025
Special inspection requirement — Fenestration areas
Nicholas Palumbo
06/05/2025
Special inspection requirement — Lighting in dwelling units
Nicholas Palumbo
06/05/2025
Special inspection requirement — Interior lighting power
Nicholas Palumbo
06/05/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Nicholas Palumbo
06/05/2025
Special inspection requirement — Fenestration air leakage
Nicholas Palumbo
06/05/2025
Special inspection requirement — Final
Nicholas Palumbo
06/03/2025
Objection resolved — Addressed
05/16/2025
Objection raised — Scope
05/16/2025
Objection resolved — Addressed
05/15/2025
Filed — Alteration
Propose Structural work for the renovation of existing single family house with GC # B08031174-P1. ST scope includes new openings in exist. masonry wall; new stair opening in exist. slab, new lintels; new cold formed metal framing as per plan.
B08032647-P1
Latest 60 of 159 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedDYNAMIC BLUE WATER MECH08/13/2026
DOB NOWGeneral ConstructionPermit IssuedSTEERING HOUSE CONSTRUCT05/14/2026
DOB NOWMechanical SystemsSigned-offSTEERING HOUSE CONSTRUCT05/08/2026
DOB NOWMechanical SystemsSigned-offSTEERING HOUSE CONSTRUCT02/04/2026
DOB NOWConstruction FenceSigned-offSTEERING HOUSE CONSTRUCT12/31/2025
DOB NOWGeneral ConstructionPermit IssuedSTEERING HOUSE CONSTRUCT09/05/2025
DOB NOWStructuralSigned-offSTEERING HOUSE CONSTRUCT08/20/2025
DOB NOWGeneral ConstructionSigned-offSTEERING HOUSE CONSTRUCT08/08/2025
DOB NOWPlumbingPermit IssuedSUPER PLUMBERS CORP07/18/2025
DOB NOWStructuralSigned-offSTEERING HOUSE CONSTRUCT08/07/2024
DOB NOWStructuralSigned-offSTEERING HOUSE CONSTRUCT08/07/2024
DOB NOWFoundationSigned-offSTEERING HOUSE CONSTRUCT07/10/2024
DOB NOWGeneral ConstructionPermit IssuedSTEERING HOUSE CONSTRUCT06/27/2024
DOB NOWConstruction FenceSigned-offSTEERING HOUSE CONSTRUCT06/27/2024
DOB NOWConstruction FenceSigned-offSTEERING HOUSE CONSTRUCT05/13/2024
DOB NOWGeneral ConstructionSigned-offSTEERING HOUSE CONSTRUCT05/13/2024
DOB NOWGeneral ConstructionSigned-offSTEERING HOUSE CONSTRUCT03/21/2024
DOB NOWConstruction FenceSigned-offSTEERING HOUSE CONSTRUCT03/19/2024
1 project · most recent 03/19/2026
General Wiring
FiledStatusContractorScope
03/19/2026CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
4 projects · most recent 08/01/2025
Steel
FiledStatusContractorScope
08/01/2025Signed-offSTEERING HOUSE CONSTRUCT2 scope_items
05/15/2025Signed-offSTEERING HOUSE CONSTRUCTSteel
08/05/2024Signed-offSTEERING HOUSE CONSTRUCT1 scope_items
04/25/2024——1 scope_items
1 project · most recent 07/30/2025
Fence
FiledStatusContractorScope
07/30/2025Permit IssuedSTEERING HOUSE CONSTRUCTFence
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/26/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/24/2025No Access-Final PL - Up to 9 Requested FloorsNo AccessView ↗
09/25/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/22/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/21/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
02/13/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
03/16/2026Fire-Resistant Penetrations and JointsCHUNG CHING JENspecial
02/26/2026Fire-Resistant Penetrations and JointsCHUNG CHING JENspecial
09/04/2025FinalNicholas Palumboprogress
09/04/2025Footing and FoundationNicholas Palumboprogress
08/22/2025Fire-Resistance Rated ConstructionNicholas Palumboprogress
08/22/2025Fire-Resistant Penetrations and JointsNicholas Palumbospecial
08/22/2025Structural Stability – Alterations of existing buildingsNicholas Palumbospecial
07/11/2025Structural Stability – Alterations of existing buildingsCHUNG CHING JENspecial
07/11/2025Fire-Resistance Rated ConstructionCHUNG CHING JENprogress
07/11/2025Fire-Resistant Penetrations and JointsCHUNG CHING JENspecial
06/26/2025Footing and FoundationJeffrey Stonesprogress
06/26/2025FinalJeffrey Stonesprogress
06/10/2025Fenestration and door U-factor and product ratings—energy_progress
06/10/2025Air barrier - visual inspection—energy_progress
06/10/2025Air barrier — testing —energy_progress
06/10/2025Fenestration areas—energy_progress
06/10/2025Fenestration air leakage—energy_progress
06/10/2025Insulation placement and R values—energy_progress
06/10/2025Energy Code Compliance InspectionsJeffrey Stonesprogress
06/10/2025Structural Stability – Alterations of existing buildingsJeffrey Stonesspecial
06/10/2025FinalJeffrey Stonesprogress
06/10/2025Lighting in dwelling units—energy_progress
06/10/2025Interior lighting power—energy_progress
06/05/2025FinalNicholas Palumboprogress
06/05/2025Structural Stability – Alterations of existing buildingsNicholas Palumbospecial
Latest 25 of 61.
▾Documents — 142 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/26/2026B00805099-AR01Request digital key ↗
08/26/2026B00805099-I1Request digital key ↗
08/26/2026B00805099-S1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits17
▸DOB NOWLPC Approval/Permit17
08/13/2026B01091368-I1Open ↗
08/13/2026B08031174-P3Open ↗
08/13/2026B08031174-P1Open ↗
Showing 3 of 17 on file for this type
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram7
08/13/2026B08031174-P1Open ↗
08/13/2026B08031174-I1Open ↗
08/13/2026B08031174-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00805099-P2Open ↗
08/13/2026B00805099-I1Open ↗
08/13/2026B00805099-AR01Open ↗
▸Seals & Professional Certifications39
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/26/2026B00805099-AR01Open ↗
08/26/2026B00805099-P2Open ↗
08/26/2026B00805099-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026B08032704-I1Open ↗
08/31/2026B08031174-P3Open ↗
08/30/2026B08032647-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/31/2026B08031174-P3Open ↗
08/30/2026B08031174-I1Open ↗
08/30/2026B08031174-I1Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026B00805099-P2Open ↗
08/13/2026B00805099-AR01Open ↗
08/13/2026B00805099-I1Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form10
08/26/2026B00805099-I1Open ↗
08/26/2026B00805099-S1Open ↗
08/25/2026B08032704-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWACP57
08/26/2026B00805099-AR01Open ↗
08/26/2026B00805099-P2Open ↗
08/26/2026B00805099-I1Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports3
▸DOB NOWGeotechnical Report (BC 1803.6)3
08/13/2026B08032704-I1Open ↗
08/13/2026B01055278-I1Open ↗
08/13/2026B08032626-I1Open ↗
▸Other Documents35
▸DOB NOWPlot Diagram9
08/13/2026B08031174-P2Open ↗
08/13/2026B01055278-I1Open ↗
08/13/2026B08031174-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProof of Historic Building8
08/13/2026B08032626-I1Open ↗
08/13/2026B01095417-I1Open ↗
08/13/2026B01095417-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSite Survey: Initial7
08/13/2026B00805099-I1Open ↗
08/13/2026B00805099-AR01Open ↗
08/13/2026B08031174-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/13/2026B00805099-I1Open ↗
08/13/2026B08031174-P3Open ↗
08/13/2026B08031174-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProperty Ownership Certification3
08/26/2026B00805099-I1Open ↗
08/26/2026B00805099-AR01Open ↗
08/26/2026B00805099-P2Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B08032704-I1Open ↗