← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Berry (NYCHA)
30 DONGAN HILLS AVENUE · BIN 5109567
💬 Discuss this project
1960Year Built
6Stories
D1Building Class
R5Zoning
448,500 sfGross Floor Area
506Units
1 Active Violation ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: NYC Housing Authority · 483,150 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarNYC Housing Authority29p · 3 filings · 20 docs
Site & exteriorNYC Housing Authority11p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority3807/08/2026
The Liro Group103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ventrop Engineering Consulting Group409/22/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Bazini Engineering P C803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dynamic USGeneral Contractor407/08/2026
R.A. Phillips Electrical ContElectrical403/21/2026
N.Y.C. Housing AuthorityElectrical303/21/2026
Dynamic USScaffold203/21/2026
Dynamic ContractingPlumbing107/08/2026
Stasi/Dallas Electrical ContElectrical103/21/2026
Community ElectricElectrical103/21/2026
Bestco General Electric MaintenanceElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106409/22/2022
Building Lifecycle
All (43)Filed (4)Permit Issued (4)Signed Off (3)Facade (FISP) (10)Violation (14)Inspection (4)Special Inspection (4)
06/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/18/2023
Signed off — Alteration
S00568669-I1
05/09/2023
Signed off — Alteration
NYCHA BOILER - BERRY HOUSES, BUILDING 3 - DEMOLISH EXISTING STEAM FIRED HOT WATER TANK AND ASSOCIATED PIPING. PROVIDE ALL NEW GAS FIRED HOT WATER HEATER SYSTEM FOR THE EXISTING BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00568644-I1
05/09/2023
Signed off — Alteration
NYCHA BOILER - BERRY HOUSES, BUILDING 3 - INSTALL NEW FIRE RATED DOOR, AND FILL EXISTING WALL OPENINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00568697-I1
04/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/14/2022
Permit issued — Mechanical Systems
S00568669-I1-MS
09/29/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/28/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/28/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Water Test
Certified
View inspection ↗
09/22/2022
Filed — Alteration
NYCHA BOILER - BERRY HOUSES, BUILDING 3 - DEMOLISH EXISTING STEAM FIRED HOT WATER TANK AND ASSOCIATED PIPING. PROVIDE ALL NEW GAS FIRED HOT WATER HEATER SYSTEM FOR THE EXISTING BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00568644-P2
09/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
09/19/2022
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE GHEBRYAL
09/19/2022
Special inspection requirement — HVAC-R and service water heating equipment
GEORGE GHEBRYAL
09/19/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
GEORGE GHEBRYAL
07/28/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/15/2021
Permit issued — Plumbing
S00568644-I1-PL
11/12/2021
Permit issued — General Construction
S00568697-I1-GC
11/12/2021
Permit issued — Mechanical Systems
S00568669-I1-MS
10/26/2021
Filed — Alteration
S00568669-I1
10/26/2021
Filed — Alteration
NYCHA BOILER - BERRY HOUSES, BUILDING 3 - DEMOLISH EXISTING STEAM FIRED HOT WATER TANK AND ASSOCIATED PIPING. PROVIDE ALL NEW GAS FIRED HOT WATER HEATER SYSTEM FOR THE EXISTING BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00568644-I1
10/26/2021
Filed — Alteration
NYCHA BOILER - BERRY HOUSES, BUILDING 3 - INSTALL NEW FIRE RATED DOOR, AND FILL EXISTING WALL OPENINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00568697-I1
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/23/2016
Cycle 8 facade report submitted
12/16/2015
Cycle 8 facade report submitted
12/08/2015
Cycle 8 facade report signed — SWARMP
11/25/2015
Cycle 8 facade inspection completed
12/31/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/28/2012
Cycle 7 facade report submitted
12/28/2012
Cycle 7 facade report signed — SAFE
12/03/2012
Cycle 7 facade inspection completed
10/20/2010
Violation issued (ECB, closed)
Construction
06/04/2010
Violation issued (ECB, closed)
Construction
03/27/2009
Violation issued (ECB, closed)
Construction
11/30/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/30/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/15/2007
Cycle 6 facade report submitted
10/10/2007
Cycle 6 facade report signed — SAFE
08/23/2007
Cycle 6 facade inspection completed
08/08/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/18/1995
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
04/07/1992
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/29/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offDynamic US10/14/2022
DOB NOWPlumbingSigned-offDynamic Contracting11/15/2021
DOB NOWGeneral ConstructionSigned-offDynamic US11/12/2021
DOB NOWMechanical SystemsSigned-offDynamic US11/12/2021
BISOTISSUEDA.B.C.D. Construction08/20/2015
BISOTISSUEDA.B.C.D. Construction06/22/2015
BISEQISSUEDA.B.C.D. Construction05/01/2015
BISOTISSUEDA.B.C.D. Construction04/29/2015
BISEQISSUEDA.B.C.D. Construction04/16/2015
BISEQISSUEDA.B.C.D. Construction04/15/2015
BISEQISSUEDZoria Construction03/12/2004
BISEQISSUEDZoria Construction02/24/2004
BISPLISSUEDParkset Plumbing Co09/15/2000
BISOTISSUEDSpectrum Contracting10/28/1999
BISPLISSUEDNational Mechanical Services Plumbing03/05/1996
BISFBISSUEDRichard Mortman03/13/1995
BISOTISSUEDV.C. Vitanza Sons01/31/1994
BISPLISSUEDV. C. Vitanza Sons01/31/1994
BISOTISSUEDV.C. Vitanza Sons01/31/1994
BISPLISSUEDV. C. Vitanza Sons01/31/1994
8 projects · most recent 11/06/2023
General Wiring
FiledStatusContractorScope
11/06/2023CompleteTri-State Electrical & Mechanical IGeneral Wiring
10/27/2023CompleteTri-State Electrical & Mechanical IGeneral Wiring
05/25/2023CompleteEquinox ElectricGeneral Wiring
05/25/2023CompleteEquinox ElectricGeneral Wiring
02/19/2022CompleteCsi Sec & ElectricGeneral Wiring
11/29/2021CompleteOhm's ElectricalGeneral Wiring
09/12/2020Permit IssuedN.Y.C. Housing AuthorityGeneral Wiring
09/12/2020Permit IssuedN.Y.C. Housing AuthorityGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/29/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/28/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/28/2022Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
07/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
09/19/2022Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
09/19/2022HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
09/19/2022HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
09/19/2022HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
▾Documents — 83 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026S00568697-I1Request digital key ↗
08/25/2026S00568669-I1Request digital key ↗
08/24/2026S00568644-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits11
▸BISWORK PERMIT APPLICATION6
08/21/2015540040882Open ↗
06/22/2015540040882Open ↗
05/08/2015520242826Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
05/05/2015520242826Open ↗
04/14/2015540074499Open ↗
04/13/2015540074480Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/29/2015540040882Open ↗
▸Seals & Professional Certifications25
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
04/06/2016540040882Open ↗
04/06/2016540040882Open ↗
02/12/2016520242826Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
05/08/2015520242826Open ↗
04/14/2015540074499Open ↗
04/13/2015540074480Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026S00568697-I1Open ↗
08/25/2026S00568669-I1Open ↗
08/24/2026S00568644-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
04/14/2015540074499Open ↗
04/13/2015540074480Open ↗
03/27/2014540040882Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
04/14/2015540074499Open ↗
04/13/2015540074480Open ↗
03/27/2014540040882Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026S00568644-P2Open ↗
08/25/2026S00568644-P2Open ↗
08/25/2026S00568644-P2Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/05/2015520242826Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026S00568644-P2Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN 2008 CODE1
03/27/2014540040882Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026S00568697-I1Open ↗
08/25/2026S00568669-I1Open ↗
08/24/2026S00568644-I1Open ↗
Showing 3 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
06/03/2016540040882Open ↗
05/25/2016540040882Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
09/11/2014540040882Open ↗
08/29/2014540040882Open ↗
03/27/2014540040882Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026S00568669-I1Open ↗
08/13/2026S00568644-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/27/2014540040882Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
04/06/2016540040882Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/06/2016540040882Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/13/2015540074480Open ↗
▸BISNYCECC ANALYSIS1
03/27/2014540040882Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY7
04/14/2015540074499Open ↗
04/13/2015540074480Open ↗
09/11/2014540040882Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
06/03/2016540040882Open ↗
04/06/2016540040882Open ↗
02/12/2016520242826Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/25/2026S00568669-I1Open ↗
08/24/2026S00568644-I1Open ↗
08/13/2026S00568697-I1Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/05/2015520242826Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/05/2015520242826Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/06/2016540040882Open ↗
03/27/2014540040882Open ↗
▸Filing & Intake Forms5
▸BISEFILING JOB APPLICATION COVER SHEET3
04/14/2015540074499Open ↗
04/13/2015540074480Open ↗
03/27/2014540040882Open ↗
▸BISADDITIONAL INFORMATION1
03/27/2014540040882Open ↗
▸BISEFILING COVER SHEET1
05/05/2015520242826Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/05/2015520242826Open ↗