Factory, light manufacturing
30 FRANKLIN STREET
BROOKLYN · BIN 3065247
💬 Discuss this project
1931Year Built
1Stories
F5Building Class
M1-1Zoning
5,294 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Factory, light manufacturing · Owner of record: 30-38 FRANKLIN OWNER LLC · 8,060 sf lot · 0.66 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof3p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DAX REAL ESTATE2109/13/2026
A S CONSTRUCTION606/27/2026
30-38 FRANKLIN OWNER LLC103/22/2026
A&S INTERIOR CONSTRUCTION1003/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEON SKVIRSKY PE207/07/2026
KUSHNER STUDIOS904/02/2026
HANSEN ENGINEERING, PC209/18/2025
JOEL PHAGOO P.E. PLLC103/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KUSHNER STUDIOS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A&S.INTERIOR CONSTRUCTIONGeneral Contractor1507/08/2026
GLENNS PLUMBING SVCS INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER544704/02/2026
ANDREW GOODRICH, P.E., PL965204/30/2025
Building Lifecycle
All (88)Filed (14)Permit Issued (11)Signed Off (4)Violation (14)Inspection (7)Objection (8)Special Inspection (30)
07/07/2026
Filed — Alteration
INSTALL NON-ILLUMINATED ADVERTISING SIGN ON EXTERIOR WALL STRUCTURE FILED UNDER SEPARATE APPLICATION # B01418987. (CHANGEABLE COPY)
B01418955-I1
07/07/2026
Filed — Alteration
ERECT WALL STRUCTURE FOR SIGN FILED UNDER SEPARATE APPLICATION # B01418955. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B01418987-I1
06/18/2026
Special inspection requirement — Final
LEON SKVIRSKY
06/18/2026
Special inspection requirement — Final
LEON SKVIRSKY
06/15/2026
Signed off — Alteration
EXTERIOR/INTERIOR RENOVATION OF EXISTING COMMERCIAL BUILDING INCLUDING INSTALLATION OF NEW NON-LOAD BEARING PARTITIONS, STOREFRONT, FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED HEREIN. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01121060-S1
06/02/2026
Signed off — Alteration
EXTERIOR/INTERIOR RENOVATION OF EXISTING COMMERCIAL BUILDING INCLUDING INSTALLATION OF NEW NON-LOAD BEARING PARTITIONS, STOREFRONT, FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED HEREIN. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01121060-S3
05/29/2026
Signed off — Alteration
EXTERIOR/INTERIOR RENOVATION OF EXISTING COMMERCIAL BUILDING INCLUDING INSTALLATION OF NEW NON-LOAD BEARING PARTITIONS, STOREFRONT, FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED HEREIN. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01121060-S2
05/29/2026
Signed off — Alteration
EXTERIOR/INTERIOR RENOVATION OF EXISTING COMMERCIAL BUILDING INCLUDING INSTALLATION OF NEW NON-LOAD BEARING PARTITIONS, STOREFRONT, FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED HEREIN. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01121060-I1
05/05/2026
Special inspection requirement — Insulation placement and R values
EUGENE BIFULCO
05/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
05/05/2026
Special inspection requirement — Lighting controls
EUGENE BIFULCO
05/05/2026
Special inspection requirement — Final
EUGENE BIFULCO
05/05/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
EUGENE BIFULCO
05/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
05/05/2026
Special inspection requirement — Fenestration air leakage
EUGENE BIFULCO
05/05/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
05/05/2026
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
05/05/2026
Special inspection requirement — Air barrier - visual inspection
EUGENE BIFULCO
05/05/2026
Special inspection requirement — Fenestration areas
EUGENE BIFULCO
05/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
04/29/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
04/29/2026
Special inspection requirement — Final
EUGENE BIFULCO
04/29/2026
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
04/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
04/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
04/29/2026
Special inspection requirement — Maintenance information
EUGENE BIFULCO
04/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
04/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
04/28/2026
Special inspection requirement — Maintenance information
EUGENE BIFULCO
04/28/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
04/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
04/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
04/02/2026
Filed — Alteration
EXTERIOR/INTERIOR RENOVATION OF EXISTING COMMERCIAL BUILDING INCLUDING INSTALLATION OF NEW NON-LOAD BEARING PARTITIONS, STOREFRONT, FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED HEREIN. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01121060-P6
04/02/2026
Filed — Alteration
EXTERIOR/INTERIOR RENOVATION OF EXISTING COMMERCIAL BUILDING INCLUDING INSTALLATION OF NEW NON-LOAD BEARING PARTITIONS, STOREFRONT, FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED HEREIN. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01121060-P8
04/01/2026
Filed — Alteration
EXTERIOR/INTERIOR RENOVATION OF EXISTING COMMERCIAL BUILDING INCLUDING INSTALLATION OF NEW NON-LOAD BEARING PARTITIONS, STOREFRONT, FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED HEREIN. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01121060-P7
03/02/2026
Special inspection requirement — Final
EUGENE BIFULCO
03/02/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
03/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
03/02/2026
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
02/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/21/2026
Objection resolved — Addressed
01/16/2026
Objection raised — Admin
12/19/2025
Filed — Alteration
EXTERIOR/INTERIOR RENOVATION OF EXISTING COMMERCIAL BUILDING INCLUDING INSTALLATION OF NEW NON-LOAD BEARING PARTITIONS, STOREFRONT, FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED HEREIN. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01121060-P5
12/05/2025
Violation issued (ECB, closed)
Construction
11/24/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/19/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/15/2025
Violation issued (ECB, closed)
Construction
10/15/2025
Violation issued (ECB, closed)
Unknown
10/15/2025
Violation issued (ECB, closed)
Unknown
10/15/2025
Violation issued (ECB, closed)
Unknown
10/15/2025
Violation issued (ECB, closed)
Site Safety
09/26/2025
Permit issued — Plumbing
B01121060-S1-PL
09/18/2025
Filed — Alteration
EXTERIOR/INTERIOR RENOVATION OF EXISTING COMMERCIAL BUILDING INCLUDING INSTALLATION OF NEW NON-LOAD BEARING PARTITIONS, STOREFRONT, FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED HEREIN. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01121060-P4
09/11/2025
Violation issued (ECB, closed)
Construction
08/21/2025
Violation issued (ECB, closed)
Construction
08/21/2025
Violation issued (ECB, closed)
Unknown
08/21/2025
Violation issued (ECB, closed)
Unknown
08/20/2025
Violation issued (ECB, closed)
Unknown
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGLENNS PLUMBING SVCS INC09/26/2025
DOB NOWGeneral ConstructionSigned-offA&S.INTERIOR CONSTRUCTION07/15/2025
DOB NOWStructuralSigned-offA&S.INTERIOR CONSTRUCTION07/15/2025
DOB NOWConstruction FencePermit IssuedA&S.INTERIOR CONSTRUCTION07/15/2025
DOB NOWMechanical SystemsSigned-offA&S.INTERIOR CONSTRUCTION07/15/2025
DOB NOWStructuralSigned-offA&S.INTERIOR CONSTRUCTION06/02/2025
DOB NOWGeneral ConstructionSigned-offA&S.INTERIOR CONSTRUCTION05/13/2025
DOB NOWConstruction FencePermit IssuedA&S.INTERIOR CONSTRUCTION03/24/2025
DOB NOWGeneral ConstructionSigned-offA&S.INTERIOR CONSTRUCTION03/14/2025
DOB NOWPlumbingSigned-offGLENNS PLUMBING SVCS INC03/04/2025
DOB NOWMechanical SystemsSigned-offA&S.INTERIOR CONSTRUCTION02/25/2025
1 project · most recent 04/02/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
04/02/2026Signed-offA&S.INTERIOR CONSTRUCTIONHeating and Air Conditioning Systems
1 project · most recent 04/02/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/02/2026Signed-offI & I PLUMBING CORPGas, Water/Sanitary
1 project · most recent 04/29/2025
General Wiring
FiledStatusContractorScope
04/29/2025CompleteEXPERT ELECTRIC.CONT NY IGeneral Wiring
2 projects · most recent 07/07/2026
Steel Concrete Wood
FiledStatusContractorScope
07/07/2026——1 scope_items
04/02/2026Signed-offI & I PLUMBING CORPSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/24/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/18/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/01/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 100
DateRequirementInspectorRole
06/18/2026FinalLEON SKVIRSKYprogress
06/18/2026FinalLEON SKVIRSKYprogress
05/05/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
05/05/2026FinalEUGENE BIFULCOprogress
05/05/2026Energy Code Compliance InspectionsEUGENE BIFULCOprogress
05/05/2026Air barrier - visual inspectionEUGENE BIFULCOenergy_progress
05/05/2026Fenestration areasEUGENE BIFULCOenergy_progress
05/05/2026Insulation placement and R valuesEUGENE BIFULCOenergy_progress
05/05/2026Interior lighting powerEUGENE BIFULCOenergy_progress
05/05/2026Fenestration air leakageEUGENE BIFULCOenergy_progress
05/05/2026Fenestration and door U-factor and product ratingsEUGENE BIFULCOenergy_progress
05/05/2026Lighting controlsEUGENE BIFULCOenergy_progress
05/05/2026Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
05/05/2026Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
04/29/2026Energy Code Compliance InspectionsEUGENE BIFULCOprogress
04/29/2026HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
04/29/2026HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
04/29/2026Maintenance informationEUGENE BIFULCOenergy_progress
04/29/2026HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
04/29/2026Mechanical SystemsEUGENE BIFULCOspecial
04/29/2026FinalEUGENE BIFULCOprogress
04/28/2026HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
04/28/2026Maintenance informationEUGENE BIFULCOenergy_progress
04/28/2026HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
04/28/2026HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
Latest 25 of 100.
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/17/2026B01121060-P2Request digital key ↗
08/17/2026B01121060-P5Request digital key ↗
08/17/2026B01121060-P4Request digital key ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature20
09/27/2026B01121060-I1Open ↗
09/27/2026B01121060-I1Open ↗
08/31/2026B01121060-S1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/17/2026B01121060-P5Open ↗
08/17/2026B01121060-S2Open ↗
08/17/2026B01121060-S1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/27/2026B01121060-I1Open ↗
08/28/2026B01121060-P6Open ↗
08/27/2026B01121060-S2Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/17/2026B01121060-P2Open ↗
08/17/2026B01121060-S3Open ↗
08/17/2026B01121060-S2Open ↗
Showing 3 of 11 on file for this type