← Back
General warehouse
30 HAVENS PLACE
BROOKLYN · BIN 3042802
💬 Discuss this project
1926Year Built
1Stories
E1Building Class
C4-5DZoning
20,000 sfGross Floor Area
1Units
5 Open Violations ▸FDNY Report ↗
General warehouse · Owner of record: 2425 HOLDING CORP · 17,533 sf lot · 1.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Roof4p · 2 filings · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 121p · 1 filing · 20 docs
Floor 111p · 1 filing · 20 docs
Floor 101p · 1 filing · 20 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 21p · 1 filing · 20 docs
Floor 13p · 1 filing · 17 docs
Basement1p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ARENDA MANAGEMENT2807/08/2026
ATLANTIC HAVEN REALTY203/21/2026
2425 HOLDING COMP403/21/2026
2425 HOLDING COMPANY103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/28/2025$7.9M—2425 HOLDING CORP. → Private party$395/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AVALON DESIGNS803/21/2026
EXPEDITING 4 U903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FULLSCALE INCElectrical103/21/2026
PAPADOPOULOS, DIMITRIOSElectrical103/21/2026
STAR COMPANIESS LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENTHINK ENGINEERS LLC6247207/28/2025
Building Lifecycle
All (75)Filed (13)Permit Issued (1)Violation (13)Objection (18)Special Inspection (30)
03/23/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/03/2026
Objection resolved — Addressed
01/25/2026
Objection resolved — Addressed
01/23/2026
Violation issued (ECB, open)
Site Safety
01/23/2026
Violation issued (ECB, open)
Unknown
01/23/2026
Violation issued (ECB, open)
Construction
01/23/2026
Violation issued (ECB, open)
Construction
01/18/2026
Objection raised — Structural
12/30/2025
Filed — Alteration
B01334089-I1
12/15/2025
Filed — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B01256572-S1
12/15/2025
Special inspection requirement — Subgrade Inspections
12/15/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
12/15/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
11/14/2025
Permit issued — Construction Fence
B01259058-I1-FN
10/30/2025
Objection raised — Other
10/30/2025
Objection raised — Other
10/23/2025
Objection resolved — Addressed
10/03/2025
Objection raised — Other
10/03/2025
Objection raised — Scope
09/30/2025
Objection resolved — Addressed
09/29/2025
Filed — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B01256572-S2
09/29/2025
Filed — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B01256572-S3
09/17/2025
Objection raised — Other
09/15/2025
Special inspection requirement — Post-installed Anchors
09/15/2025
Special inspection requirement — Structural Steel - Details
09/15/2025
Special inspection requirement — Concrete - Cast-In-Place
09/15/2025
Special inspection requirement — Masonry
09/12/2025
Filed — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B01256572-S6
09/12/2025
Filed — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B01256572-S4
09/12/2025
Filed — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B01256572-S5
09/12/2025
Filed — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B01256572-S7
09/10/2025
Special inspection requirement — Standpipe Systems
09/02/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
09/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/02/2025
Special inspection requirement — Post-installed Anchors
09/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/02/2025
Special inspection requirement — Maintenance information
09/02/2025
Special inspection requirement — Shutoff dampers
09/02/2025
Special inspection requirement — Duct leakage testing, insulation and design
09/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
09/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
09/02/2025
Special inspection requirement — Electrical motors and elevators
09/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
09/02/2025
Special inspection requirement — Heating Systems
09/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/02/2025
Special inspection requirement — Energy Code Compliance Inspections
09/02/2025
Special inspection requirement — Maintenance information
09/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
09/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
09/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
09/02/2025
Special inspection requirement — Energy Code Compliance Inspections
09/02/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
09/01/2025
Filed — Full Demolition
Full Demolition of Existing one story Building
B01259035-S2
09/01/2025
Special inspection requirement — Mechanical Systems
09/01/2025
Special inspection requirement — Final
08/21/2025
Objection resolved — Addressed
08/12/2025
Objection raised — Other
08/12/2025
Objection raised — Admin
08/12/2025
Objection raised — Other
08/12/2025
Objection resolved — Addressed
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedSTAR COMPANIESS LLC11/14/2025
BISOTISSUEDGREGORY J. OTTMAR12/20/2016
BISPLISSUEDPASQUALE QUARATINO INC07/30/2002
BISMHISSUEDH & L PARTNERS, INC.07/09/2002
BISEQISSUEDH & L PARTNERS, INC.07/09/2002
BISBLISSUEDMETROPOLITAN HEAT & POWER CO12/24/1998
BISPLISSUEDMETROPOLITAN HEAT & POWER CO12/24/1998
1 project · most recent 12/15/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/15/2025——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Amana PTH073J15AXXX 7,000 BTU · Ptac ×197
PTH123J25AXXX 11,600 BTU · Ptac ×99
Mitsubishi Electric MXZ-SM36NL 36,000 BTU · Condensing Unit ×1
MXZ-SM48NL 48,000 BTU · Condensing Unit ×1
PUZ-AK12NL 12,000 BTU · Condensing Unit ×1
Heating
Amana PTH073J15AXXX 6,100 BTU · Ptac ×197
PTH123J25AXXX 10,800 BTU · Ptac ×99
Mitsubishi Electric MXZ-SM36NL 41,000 BTU · Condensing Unit ×1
MXZ-SM48NL 50,000 BTU · Condensing Unit ×1
PUZ-AK12NL 18,000 BTU · Condensing Unit ×1
Ventilation
Greenheck AX-31-160-0420 1,500 CFM ×2
CUE-090-VG 325 CFM · Kitchen Exhaust ×2
CUE-100-VG 975 CFM · Kitchen Exhaust ×2
G-090-VG 325 CFM · Exhaust Fan ×2
G-100-VG 975 CFM · Exhaust Fan ×2
Enervex BEF 315 1,000 CFM · Exhaust Fan ×1
Renewaire HE10RTH-F 580 CFM · Erv ×1
2 projects · most recent 12/15/2025
Sprinkler System
FiledStatusContractorScope
12/15/2025——Sprinkler System
09/01/2025——1 heads
1 project · most recent 12/15/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/15/2025——Gas, Storm, Water/Sanitary
4 projects · most recent 12/02/2025
General Wiring
FiledStatusContractorScope
12/02/2025Permit IssuedTFK ELECTRIC CORP100 meters, 100 new_meters
11/30/2025Permit IssuedTFK ELECTRIC CORP1 meters, 1 new_meters
11/28/2025Permit IssuedTFK ELECTRIC CORP—
11/28/2025Permit IssuedTFK ELECTRIC CORPGeneral Wiring
1 project · most recent 12/15/2025
Steel Concrete
FiledStatusContractorScope
12/15/2025——Steel, Concrete
1 project · most recent 07/28/2025
Fence
FiledStatusContractorScope
07/28/2025Permit IssuedSTAR COMPANIESS LLCFence
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
12/15/2025Subgrade Inspections—special
12/15/2025Excavations - Sheeting, Shoring, and Bracing—special
12/15/2025Subsurface Investigations (Borings/Test Pits)—special
09/15/2025Post-installed Anchors—special
09/15/2025Structural Steel - Details—special
09/15/2025Concrete - Cast-In-Place—special
09/15/2025Masonry—special
09/10/2025Standpipe Systems—special
09/02/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
09/02/2025Fire-Resistant Penetrations and Joints—special
09/02/2025Post-installed Anchors—special
09/02/2025Fire-Resistant Penetrations and Joints—special
09/02/2025Maintenance information—energy_progress
09/02/2025Shutoff dampers—energy_progress
09/02/2025Duct leakage testing, insulation and design—energy_progress
09/02/2025HVAC-R and service water piping design and insulation—energy_progress
09/02/2025HVAC-R and service water heating equipment—energy_progress
09/02/2025Electrical motors and elevators—energy_progress
09/02/2025HVAC-R and service water heating system controls—energy_progress
09/02/2025Heating Systems—special
09/02/2025Fire-Resistant Penetrations and Joints—special
09/02/2025Energy Code Compliance Inspections—progress
09/02/2025Maintenance information—energy_progress
09/02/2025HVAC-R and service water heating equipment—energy_progress
09/02/2025HVAC-R and service water heating system controls—energy_progress
Latest 25 of 52.
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/21/2026B01259058-I1Request digital key ↗
08/20/2026B01256572-S7Request digital key ↗
08/20/2026B01256572-S6Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
01/30/2025321492345Open ↗
12/08/2016321492345Open ↗
▸BISWORK PERMIT APPLICATION1
12/21/2016321492345Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWRestrictive Declaration/Easement 12
08/20/2026B01256572-I1Open ↗
08/15/2026B01256572-S2Open ↗
▸DOB NOWRestrictive Declaration/Easement 32
08/20/2026B01256572-I1Open ↗
08/15/2026B01256572-S2Open ↗
▸DOB NOWRestrictive Declaration/Easement 22
08/20/2026B01256572-I1Open ↗
08/15/2026B01256572-S2Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/20/2026B01256572-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/20/2026B01256572-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/20/2026B01256572-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/21/2026B01259035-S2Open ↗
08/21/2026B01259035-I1Open ↗
08/21/2026B01259035-S1Open ↗
Showing 3 of 13 on file for this type
▸BISProfessional and Owner Certification (POC3)1
12/08/2016321492345Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/08/2016321492345Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
12/08/2016321492345Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026B01259035-S1Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWElectric Cut-Off1
08/13/2026B01259035-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B01259035-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01259035-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B01259035-I1Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/20/2026B01256572-I1Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
12/08/2016321492345Open ↗
▸DOB NOWStreet Tree Checklist1
08/20/2026B01256572-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026B01259035-S1Open ↗
08/15/2026B01259035-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
01/06/2025321492345Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/08/2016321492345Open ↗
▸DOB NOWRodent Control1
08/13/2026B01259035-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/15/2025321492345Open ↗
01/06/2025321492345Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/06/2025321492345Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/08/2016321492345Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/15/2025321492345Open ↗
01/06/2025321492345Open ↗
▸DOB NOWSOIL REPORT1
08/15/2026B01256572-S2Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/16/2025321492345Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
01/15/2025321492345Open ↗
01/06/2025321492345Open ↗
12/08/2016321492345Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
12/09/2016321492345Open ↗
▸Other Documents7
▸DOB NOWProperty Ownership Certification2
08/20/2026B01256572-I1Open ↗
08/15/2026B01259035-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01259035-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B01259035-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/20/2026B01256572-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/20/2026B01256572-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B01259035-I1Open ↗