← Back
Elevator apt, fireproof with stores
Innovative Urban Village
30 INSPIRATION LANE · BIN 3429678
💬 Discuss this project
2024Year Built
15Stories
D6Building Class
R7-2Zoning
352,872 sfGross Floor Area
575Units
2 Open Violations ▸FDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: IUV PHASE 1A HOUSING DEVELOPMENT FUND CO RPORATION · 68,457 sf lot · 5.15 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction13p · 3 filings · 20 docs
Floor 15Under Construction13p · 1 filing · 20 docs
Floor 14Under Construction13p · 1 filing · 20 docs
Floor 13Under Construction13p · 1 filing · 20 docs
Floor 12Under Construction13p · 1 filing · 20 docs
Floor 11Under Construction13p · 1 filing · 20 docs
Floor 10Under Construction13p · 1 filing · 20 docs
Floor 9Under Construction13p · 1 filing · 20 docs
Floor 8Under Construction13p · 1 filing · 20 docs
Floor 7Under Construction13p · 2 filings · 20 docs
Floor 6Under Construction13p · 1 filing · 20 docs
Floor 5Under Construction13p · 1 filing · 20 docs
Floor 4Under Construction13p · 1 filing · 20 docs
Floor 3Under Construction13p · 1 filing · 20 docs
Floor 2Under Construction13p · 1 filing · 20 docs
Floor 1Under Construction13p · 2 filings · 20 docs
CellarUnder Construction539p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
IUV PHASE 1 OWNER19409/15/2026
MONADNOCK CONSTRUCTION807/08/2026
COSAN CONSTRUCTION1004/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/27/2024$13.9M—Private party → IUV PHASE 1 LIHTC OWNER, LLC$39/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE4203/21/2026
EUROCELT EXPEDITING, INC1003/21/2026
JM ZONING, LLC.7303/21/2026
MRA ENGINEERING P C203/21/2026
DOMANI CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCKLEDGE SCAFFOLD CORPGeneral Contractor2407/08/2026
MONADNOCK CONSTRUCTION INGeneral Contractor2007/08/2026
METRO FIRE PROTECTION INCFire Protection807/08/2026
TT MECHANICAL CORPPlumbing407/08/2026
COSAN CONSTRUCTION CORPGeneral Contractor304/09/2026
MONADNOCK GEN'L CONT INCGeneral Contractor307/08/2026
GLO ELECTRIC LLCElectrical203/22/2026
MC SUPERSTRUCTURE INCGeneral Contractor106/28/2026
A.M. SAGE PLG & HTG LLCPlumbing107/08/2026
DNA PLUMBING CONTR. INCPlumbing107/08/2026
EMES SOLAR INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE8433305/18/2026
BABYLON ECO-CONSTRUCTION9687110/23/2025
DESIMONE CONSULTING ENGIN5942510/25/2024
LANGAN ENG, ENV, SURVEYIN1265204/05/2024
Building Lifecycle
All (283)Filed (73)Permit Issued (60)Signed Off (1)Violation (6)Inspection (41)Objection (72)Special Inspection (30)
07/30/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/23/2026
Inspection — Certified Medical Gas - MG - PL - Roughing
Certified
View inspection ↗
07/23/2026
Inspection — Certified Medical Gas - MG - PL - Test
Certified
View inspection ↗
07/23/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/23/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/23/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/17/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/14/2026
Violation issued (ECB, closed)
Unknown
06/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
06/05/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
06/05/2026
Special inspection requirement — Insulation placement and R values
JOHN MCMONAGLE
06/05/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
JOHN MCMONAGLE
06/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
06/05/2026
Special inspection requirement — Fenestration air leakage
JOHN MCMONAGLE
06/05/2026
Special inspection requirement — Air barrier continuity plan testing
JOHN MCMONAGLE
06/05/2026
Special inspection requirement — Air barrier — testing
JOHN MCMONAGLE
06/05/2026
Special inspection requirement — Protection of exposed foundation insulation
JOHN MCMONAGLE
06/05/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN MCMONAGLE
06/05/2026
Special inspection requirement — Fenestration areas
JOHN MCMONAGLE
06/05/2026
Special inspection requirement — Air barrier - visual inspection
JOHN MCMONAGLE
06/01/2026
Objection resolved — Addressed
05/28/2026
Permit issued — Standpipe
B00851722-S7-EW-SP
05/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/26/2026
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
05/26/2026
Special inspection requirement — Standpipe Systems
JOHN MCMONAGLE
05/19/2026
Objection raised — Other
05/18/2026
Filed — New Building
MECHANICAL FILING AS PER PLANS FILED
B00851722-B8
05/18/2026
Permit issued — General Construction
B01397566-I1-GC
05/15/2026
Special inspection requirement — Exterior lighting power
JOHN MCMONAGLE
05/15/2026
Special inspection requirement — Shutoff dampers
JOHN MCMONAGLE
05/15/2026
Special inspection requirement — Duct leakage testing, insulation and design
JOHN MCMONAGLE
05/15/2026
Special inspection requirement — Lighting in dwelling units
JOHN MCMONAGLE
05/15/2026
Special inspection requirement — Permanent certificate
JOHN MCMONAGLE
05/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
05/15/2026
Special inspection requirement — Ventilation and air distribution system
JOHN MCMONAGLE
05/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
05/15/2026
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
05/15/2026
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
05/15/2026
Special inspection requirement — Chimneys and vents
JOHN MCMONAGLE
05/15/2026
Special inspection requirement — Final
JOHN MCMONAGLE
05/15/2026
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
05/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
05/15/2026
Special inspection requirement — Interior lighting power
JOHN MCMONAGLE
05/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
05/11/2026
Filed — New Building
MECHANICAL FILING AS PER PLANS FILED
B00851722-B6
05/08/2026
Filed — New Building
MECHANICAL FILING AS PER PLANS FILED
B00851722-B5
05/06/2026
Filed — Alteration
THIS APPLICATION IS FILED FOR TEMPORARY USE PERMIT FOR A SALES OFFICE INCLUDING MODEL APARTMENTS PURSUANT TO SECTION AC 28-111 AND BUILDING BULLETIN 2010-002.
B01397566-I1
05/01/2026
Signed off — Alteration
BLDG# 1: CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST, FILED SEP #B00851722. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01113810-I1
04/24/2026
Filed — New Building
MECHANICAL FILING AS PER PLANS FILED
B00851722-B7
04/24/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/17/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
04/14/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/06/2026
Permit issued — General Construction
B00861527-I1-GC
04/03/2026
Permit issued — Sprinklers
B00851722-S7-EW-SD
03/27/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
03/27/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
Latest 60 of 283 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipePermit IssuedMETRO FIRE PROTECTION INC05/28/2026
DOB NOWGeneral ConstructionPermit IssuedMONADNOCK GEN'L CONT INC05/18/2026
DOB NOWGeneral ConstructionSigned-offMONADNOCK CONSTRUCTION IN04/06/2026
DOB NOWSprinklersPermit IssuedMETRO FIRE PROTECTION INC04/03/2026
DOB NOWGeneral ConstructionPermit IssuedMONADNOCK CONSTRUCTION IN03/26/2026
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP03/25/2026
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP03/25/2026
DOB NOWMechanical SystemsPermit IssuedMONADNOCK CONSTRUCTION IN02/24/2026
DOB NOWSupported ScaffoldPermit IssuedCOSAN CONSTRUCTION02/13/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedMONADNOCK GEN'L CONT INC02/05/2026
DOB NOWConstruction FencePermit IssuedMONADNOCK CONSTRUCTION IN01/16/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedROCKLEDGE SCAFFOLD CORP01/14/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedROCKLEDGE SCAFFOLD CORP01/14/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedROCKLEDGE SCAFFOLD CORP01/14/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedROCKLEDGE SCAFFOLD CORP12/18/2025
DOB NOWSolarPermit IssuedEMES SOLAR INC12/15/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedROCKLEDGE SCAFFOLD CORP12/05/2025
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP12/05/2025
DOB NOWConstruction FencePermit IssuedROCKLEDGE SCAFFOLD CORP12/05/2025
DOB NOWConstruction FencePermit IssuedROCKLEDGE SCAFFOLD CORP12/05/2025
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP12/04/2025
DOB NOWGeneral ConstructionPermit IssuedMONADNOCK CONSTRUCTION IN10/15/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedCOSAN CONSTRUCTION08/04/2025
DOB NOWPlumbingPermit IssuedTT MECHANICAL CORP07/30/2025
DOB NOWPlumbingPermit IssuedA.M. SAGE PLG & HTG LLC07/11/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedMC SUPERSTRUCTURE INC07/03/2025
DOB NOWStandpipePermit IssuedMETRO FIRE PROTECTION INC05/29/2025
DOB NOWSprinklersPermit IssuedMETRO FIRE PROTECTION INC05/29/2025
DOB NOWStandpipeSigned-offMETRO FIRE PROTECTION INC04/23/2025
DOB NOWGeneral ConstructionSigned-offMONADNOCK CONSTRUCTION IN04/21/2025
DOB NOWMechanical SystemsPermit IssuedMONADNOCK CONSTRUCTION IN03/04/2025
DOB NOWStructuralSigned-offMONADNOCK CONSTRUCTION IN03/04/2025
DOB NOWSupported ScaffoldPermit IssuedCOSAN CONSTRUCTION02/20/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedMONADNOCK GEN'L CONT INC02/19/2025
DOB NOWConstruction FencePermit IssuedMONADNOCK CONSTRUCTION IN01/29/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedROCKLEDGE SCAFFOLD CORP01/15/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedROCKLEDGE SCAFFOLD CORP01/13/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedROCKLEDGE SCAFFOLD CORP01/13/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedROCKLEDGE SCAFFOLD CORP12/19/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedROCKLEDGE SCAFFOLD CORP12/06/2024
+ 10 more permits on file
1 project · most recent 05/18/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/18/2026Permit IssuedMONADNOCK CONSTRUCTION INAir Conditioning Systems
Cooling
Daikin RXYQ72AAYDA 72,000 BTU · Vrf Outdoor ×45
RXYQ96AATJB 96,000 BTU · Vrf Outdoor ×22
RXYQ96AAYDA 96,000 BTU · Vrf Outdoor ×27
RXYQ144AATJB 144,000 BTU · Vrf Outdoor ×16
RXYQ120AATJB 120,000 BTU · Vrf Outdoor ×12
RXYQ120AAYDA 120,000 BTU · Vrf Outdoor ×18
RXYQ144AAYDA 144,000 BTU · Vrf Outdoor ×18
RXYQ72AATJB 72,000 BTU · Vrf Outdoor ×10
RXTQ60TBVJUA 60,000 BTU · Vrf Outdoor ×5
RXYQ168AATJB 168,000 BTU · Vrf Outdoor ×2
RXYQ168AAYDA 168,000 BTU · Vrf Outdoor ×2
RXYQ96AATJA 92,700 BTU · Vrf Outdoor ×11
RXYQ144AATJA 140,000 BTU · Vrf Outdoor ×9
RXYQ120AATJA 116,300 BTU · Vrf Outdoor ×6
RXYQ72AATJA 72,000 BTU · Vrf Outdoor ×5
RKF18AXVJU 18,100 BTU · Heat Pump Outdoor ×1
RXYQ1688AAYDA 148,700 BTU · Condensing Unit ×1
RXYQ168AATJA 148,700 BTU · Vrf Outdoor ×1
1 project · most recent 05/18/2026
Sprinkler System
FiledStatusContractorScope
05/18/2026Permit IssuedMETRO FIRE PROTECTION INCSprinkler System
2 projects · most recent 05/18/2026
Storm Water/Sanitary Gas
FiledStatusContractorScope
05/18/2026Permit IssuedTT MECHANICAL CORPGas, Storm, Water/Sanitary
01/09/2026Permit IssuedVERSUS PLBG AND HTG LLCStorm, Water/Sanitary
13 projects · most recent 04/08/2026
General Wiring Lighting HVAC Wiring Boiler Controls
FiledStatusContractorScope
04/08/2026CompleteITZ ELECTRIC CORP—
04/08/2026CompleteITZ ELECTRIC CORP—
04/08/2026CancelledAMBER LITE ELECTRIC CORP.General Wiring, Lighting, HVAC Wiring, Boiler Controls
04/06/2026Permit IssuedNYCOM ELECTRICAL CORP—
03/25/2026CancelledGLO ELECTRIC LLC—
03/25/2026CancelledGLO ELECTRIC LLC—
03/24/2026Permit IssuedANTHONY G FERRY INC—
12/18/2025Permit IssuedEASTERN ELEC'L CONST INC—
12/18/2025Permit IssuedEASTERN ELEC'L CONST INC—
10/30/2025Permit IssuedGLO ELECTRIC LLCGeneral Wiring, Lighting, HVAC Wiring, Boiler Controls
10/23/2025CompleteB.P. ELECTRIC CORP—
05/05/2025Permit IssuedNYCOM ELECTRICAL CORP—
03/20/2025CompleteAMBER LITE ELECTRIC CORP.—
1 project · most recent 05/18/2026
Steel Concrete Masonry
FiledStatusContractorScope
05/18/2026Permit IssuedMETRO FIRE PROTECTION INCSteel, Concrete, Masonry
1 project · most recent 12/19/2023
FiledStatusContractorScope
12/19/2023——295 panels, 141.6 kw, 16,000 roof_area_sqft
4 projects · most recent 02/03/2026
Fence Sidewalk Shed Scaffold
FiledStatusContractorScope
02/03/2026Signed-offROCKLEDGE SCAFFOLD CORPFence, Sidewalk Shed
02/03/2026Permit IssuedROCKLEDGE SCAFFOLD CORPFence, Sidewalk Shed
12/30/2025Permit IssuedCOSAN CONSTRUCTION CORPScaffold
01/15/2025Permit IssuedMONADNOCK CONSTRUCTION INFence
▾Field Inspections (DOB CAP) — 41
DateTypeResultReport
07/30/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/23/2026Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
07/23/2026Certified Medical Gas - MG - PL - TestCertifiedView ↗
07/23/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/23/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/23/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/17/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/24/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/24/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/17/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
04/14/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/27/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
03/27/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/19/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/02/2026Pass-Final PL - UndergroundPassView ↗
01/07/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/18/2025Fail-Final CND-Occupancy InspectionFailView ↗
10/09/2025Pass-Final PL - UndergroundPassView ↗
Latest 25 of 41.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
06/05/2026Fenestration air leakageJOHN MCMONAGLEenergy_progress
06/05/2026Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
06/05/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
06/05/2026Wall Panels, Curtain Walls, and VeneersJOHN MCMONAGLEspecial
06/05/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
06/05/2026Fenestration and door U-factor and product ratingsJOHN MCMONAGLEenergy_progress
06/05/2026Air barrier - visual inspectionJOHN MCMONAGLEenergy_progress
06/05/2026Insulation placement and R valuesJOHN MCMONAGLEenergy_progress
06/05/2026Fenestration areasJOHN MCMONAGLEenergy_progress
06/05/2026Protection of exposed foundation insulationJOHN MCMONAGLEenergy_progress
06/05/2026Air barrier — testing JOHN MCMONAGLEenergy_progress
06/05/2026Air barrier continuity plan testingJOHN MCMONAGLEenergy_progress
05/26/2026Standpipe SystemsJOHN MCMONAGLEspecial
05/26/2026Sprinkler SystemsJOHN MCMONAGLEspecial
05/15/2026Exterior lighting powerJOHN MCMONAGLEenergy_progress
05/15/2026Shutoff dampersJOHN MCMONAGLEenergy_progress
05/15/2026HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
05/15/2026Electrical motors and elevatorsJOHN MCMONAGLEenergy_progress
05/15/2026HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
05/15/2026HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
05/15/2026Lighting controlsJOHN MCMONAGLEenergy_progress
05/15/2026MeteringJOHN MCMONAGLEenergy_progress
05/15/2026Ventilation and air distribution systemJOHN MCMONAGLEenergy_progress
05/15/2026Maintenance informationJOHN MCMONAGLEenergy_progress
05/15/2026Interior lighting powerJOHN MCMONAGLEenergy_progress
Latest 25 of 150.
▾Documents — 272 on file (BIS + DOB NOW)
▸Plans & Drawings73
▸DOB NOWPlans/Sketch73
08/27/2026B00861478-I1Request digital key ↗
08/26/2026B00968242-I1Request digital key ↗
08/24/2026B00861527-P5Request digital key ↗
Showing 3 of 73 on file for this type
▸Applications & Permits9
▸DOB NOWDEP Stormwater Construction Permit6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWHPD - Permit Notice3
08/15/2026B00851722-I1Open ↗
08/14/2026B00851722-B6Open ↗
08/13/2026B00851722-I1Open ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram4
08/14/2026B00851722-B6Open ↗
Showing 1 of 4 on file for this type
▸BISZONING EXHIBIT II: CERTIFICATION1
03/20/2025321602137Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
03/18/2025321602137Open ↗
▸BISZONING EXHIBIT V: CERTIFICATION1
03/20/2025321602137Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/20/2025321602137Open ↗
▸BISZONING EXHIBIT IV: CERTIFICATION1
03/20/2025321602137Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications111
▸DOB NOWSpecial Inspector Seal & Signature40
09/29/2026B00851722-P3Open ↗
09/29/2026B00851722-P3Open ↗
09/25/2026B00851722-S7Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature40
08/24/2026B00861527-I1Open ↗
08/24/2026B00861527-S1Open ↗
08/23/2026B01116657-P2Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWProgress Inspector Seal & Signature31
09/29/2026B00851722-P3Open ↗
09/29/2026B00851722-P3Open ↗
09/02/2026B00851722-B2Open ↗
Showing 3 of 31 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWStandpipe Alarms Drawings2
08/15/2026B00851722-I1—
08/13/2026B00861527-I1—
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist4
08/15/2026B00851722-B2Open ↗
08/15/2026B00851722-P8Open ↗
08/15/2026B00851722-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos31
▸DOB NOWOER: Notice to Proceed31
08/17/2026B00851722-B5Open ↗
08/15/2026B00851722-I1Open ↗
08/14/2026B00851722-B6Open ↗
Showing 3 of 31 on file for this type
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/17/2026B00851722-S5Open ↗
08/17/2026B00851722-S6Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026B00851722-S3Open ↗
08/13/2026B00851722-P5Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs1
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/20/2025321602137Open ↗
▸Filing & Intake Forms4
▸DOB NOWAI1 Form (from plan PDF)4
08/16/2026B01116657-P3Open ↗
08/16/2026B01116657-P6Open ↗
08/16/2026B01116657-P2Open ↗
Showing 3 of 4 on file for this type
▸Other Documents16
▸DOB NOWSite Survey: Initial4
08/14/2026B00851722-B6Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/14/2026B00851722-B6Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/15/2026B00851722-B2Open ↗
08/15/2026B00851722-P8Open ↗
08/15/2026B00851722-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWWaiver Document3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLOT DIAGRAM1
03/20/2025321602137Open ↗