Two family frame
30 NANCY LANE
STATEN ISLAND · Tottenville-Charleston · BIN 5093059
💬 Discuss this project
1988Year Built
2Stories
B2Building Class
R3XZoning
5,802 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 10,240 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 221p · 2 filings · 20 docs
Floor 119p · 2 filings · 20 docs
Cellar7p · 1 filing · 6 docs
Site & exterior2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZAIM CONTRACTOR103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RYAN DESIGN ARCHITECTURE608/23/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZAIM CONTRACTOR CORPGeneral Contractor403/21/2026
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
EH PLUMBING & HEATING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIAN ENGINEERING PLLC7397308/23/2024
Building Lifecycle
All (38)Filed (6)Permit Issued (3)Violation (1)Inspection (1)Objection (8)Special Inspection (19)
08/23/2024
Filed — Alteration
Proposed 2 story enlargement at rear of existing 2 story 2 family detached residence
S00671531-P2
08/23/2024
Special inspection requirement — Concrete - Cast-In-Place
JIAN DENG
08/23/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
JIAN DENG
08/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
08/23/2024
Special inspection requirement — Subgrade Inspections
JIAN DENG
08/23/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
08/23/2024
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
08/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
JIAN DENG
08/23/2024
Special inspection requirement — Lowest Floor Elevation
JIAN DENG
08/23/2024
Special inspection requirement — Fenestration areas
JIAN DENG
08/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
JIAN DENG
08/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
JIAN DENG
08/23/2024
Special inspection requirement — Air barrier - visual inspection
JIAN DENG
08/23/2024
Special inspection requirement — Insulation placement and R values
JIAN DENG
08/23/2024
Special inspection requirement — Protection of exposed foundation insulation
JIAN DENG
08/23/2024
Special inspection requirement — Permanent certificate
JIAN DENG
08/23/2024
Special inspection requirement — Fenestration air leakage
JIAN DENG
08/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JIAN DENG
08/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JIAN DENG
08/23/2024
Special inspection requirement — Maintenance information
JIAN DENG
04/18/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/22/2022
Objection raised — Scope
11/22/2022
Objection resolved — Addressed
11/04/2022
Filed — Alteration
Proposed 2 story enlargement at rear of existing 2 story 2 family detached residence
S00671531-P1
11/04/2022
Filed — Alteration
PLUMBING
S00686235-P1
10/13/2022
Violation issued (ECB, closed)
Construction
09/20/2022
Permit issued — Plumbing
S00686235-I1-PL
07/13/2022
Permit issued — General Construction
S00671531-I1-GC
07/11/2022
Permit issued — Construction Fence
S00686205-I1-FN
03/14/2022
Objection raised — Admin
03/14/2022
Objection resolved — Addressed
03/14/2022
Objection raised — Zoning
03/14/2022
Objection resolved — Addressed
03/14/2022
Objection raised — Zoning
03/14/2022
Objection resolved — Addressed
03/02/2022
Filed — Alteration
PLUMBING
S00686235-I1
02/25/2022
Filed — Alteration
Proposed 2 story enlargement at rear of existing 2 story 2 family detached residence
S00671531-I1
02/25/2022
Filed — Alteration
S00686205-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedEH PLUMBING & HEATING COR09/20/2022
DOB NOWGeneral ConstructionPermit IssuedSUFFOLK CONSTRUCT CO. INC07/13/2022
DOB NOWConstruction FencePermit IssuedSUFFOLK CONSTRUCT CO. INC07/11/2022
BISOTISSUEDSUNRUN INSTALLATION SVC08/14/2023
1 project · most recent 11/04/2022
Gas Water/Sanitary
FiledStatusContractorScope
11/04/2022Permit IssuedEH PLUMBING & HEATING CORGas, Water/Sanitary
2 projects · most recent 08/15/2023
General Wiring
FiledStatusContractorScope
08/15/2023CompleteSUNRUN SOLAR ELECTL CORP—
07/15/2022Permit IssuedHIGH BEAM ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/18/2023Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
08/23/2024Concrete - Cast-In-PlaceJIAN DENGspecial
08/23/2024Excavations - Sheeting, Shoring, and BracingJIAN DENGspecial
08/23/2024Fire-Resistant Penetrations and JointsJIAN DENGspecial
08/23/2024Subgrade InspectionsJIAN DENGspecial
08/23/2024Subsurface Investigations (Borings/Test Pits)anthony santorospecial
08/23/2024Energy Code Compliance InspectionsJIAN DENGprogress
08/23/2024Fire-Resistance Rated ConstructionJIAN DENGprogress
08/23/2024Lowest Floor ElevationJIAN DENGprogress
08/23/2024Fenestration areasJIAN DENGenergy_progress
08/23/2024HVAC-R and service water heating system controlsJIAN DENGenergy_progress
08/23/2024HVAC-R and service water heating equipmentJIAN DENGenergy_progress
08/23/2024Air barrier - visual inspectionJIAN DENGenergy_progress
08/23/2024Insulation placement and R valuesJIAN DENGenergy_progress
08/23/2024Protection of exposed foundation insulationJIAN DENGenergy_progress
08/23/2024Permanent certificateJIAN DENGenergy_progress
08/23/2024Fenestration air leakageJIAN DENGenergy_progress
08/23/2024HVAC-R and service water piping design and insulationJIAN DENGenergy_progress
08/23/2024Fenestration and door U-factor and product ratingsJIAN DENGenergy_progress
08/23/2024Maintenance informationJIAN DENGenergy_progress
▾Documents — 86 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026S00686205-I1Request digital key ↗
08/23/2026S00686235-I1Request digital key ↗
08/21/2026S00671531-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
04/09/2024540254204Open ↗
07/26/2023540254204Open ↗
▸BISWORK PERMIT APPLICATION1
08/14/2023540254204Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00671531-I1Open ↗
08/13/2026S00671531-P1Open ↗
08/13/2026S00671531-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00671531-P1Open ↗
08/13/2026S00671531-P2Open ↗
08/13/2026S00671531-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature14
08/29/2026S00671531-P2Open ↗
08/29/2026S00671531-P2Open ↗
08/29/2026S00671531-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026S00686235-I1Open ↗
08/23/2026S00686235-P1Open ↗
08/13/2026S00671531-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/29/2026S00671531-P2Open ↗
08/29/2026S00671531-P2Open ↗
08/29/2026S00671531-P2Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/26/2023540254204Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S00671531-I1Open ↗
08/13/2026S00671531-P2Open ↗
08/13/2026S00671531-P1Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
08/09/2023540254204Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/23/2026S00686235-I1Open ↗
08/14/2026S00686235-P1Open ↗
08/13/2026S00671531-P2Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
06/05/2024540254204Open ↗
08/14/2023540254204Open ↗
08/11/2023540254204Open ↗
Showing 3 of 4 on file for this type
▸BISNYCECC ANALYSIS1
07/28/2023540254204Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
07/26/2023540254204Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/05/2024540254204Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
06/07/2024540254204Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY4
06/05/2024540254204Open ↗
08/14/2023540254204Open ↗
08/11/2023540254204Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSOIL REPORT3
08/13/2026S00671531-P1Open ↗
08/13/2026S00671531-I1Open ↗
08/13/2026S00671531-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00671531-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00671531-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION3
06/07/2024540254204Open ↗
06/07/2024540254204Open ↗
07/28/2023540254204Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/07/2024540254204Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/05/2024540254204Open ↗
07/26/2023540254204Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
04/16/2024540254204Open ↗
08/07/2023540254204Open ↗
07/28/2023540254204Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/26/2023540254204Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial3
08/13/2026S00671531-P2Open ↗
08/13/2026S00671531-P1Open ↗
08/13/2026S00671531-I1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026S00671531-P2Open ↗
08/13/2026S00671531-P1Open ↗
08/13/2026S00671531-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00671531-P2Open ↗
08/13/2026S00671531-I1Open ↗
08/13/2026S00671531-P1Open ↗