← Back
Three families
30 ST MARKS PLACE
BROOKLYN · BIN 3006263
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6BZoning
3,600 sfGross Floor Area
3Units
Rent Stabilized12 Open Violations ▸
Three families · 2,033 sf lot · 1.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
Roof3p · 1 filing · 7 docs
Floor 1Under Construction8p · 1 filing · 17 docs
Sub-CellarUnder Construction5p · 1 filing · 17 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/16/2022$3.2M—— → —$883/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY BUILDING ASSOCIATES INC109/30/2025
STRUCTURAL ENGINEERING TECHNOLOGIES107/10/2024
STUDIO GOLA PAPA103/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BROOKLYN SOLARWORKS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DLM CONTRACTORS INCGeneral Contractor307/08/2026
CMC1 CORPGeneral Contractor204/09/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244109/30/2025
ACE STRUCTURAL ENGINEERIN496107/10/2024
ATELIER ARCHITECTURE 64 P4634103/18/2024
Building Lifecycle
All (46)Filed (3)Permit Issued (5)Signed Off (1)Violation (13)Objection (8)Special Inspection (16)
05/06/2026
Violation issued (HPD, open)
A
01/27/2026
Permit issued — General Construction
B00968157-I1-GC
01/06/2026
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01293099-I1
11/19/2025
Violation issued (HPD, open)
I
10/07/2025
Permit issued — General Construction
B00968157-I1-GC
10/07/2025
Permit issued — Solar
B01293099-I1-SL
09/30/2025
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01293099-I1
09/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
09/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
09/25/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
09/25/2025
Special inspection requirement — Final
NARESH MAHANGU
09/25/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
06/11/2025
Violation issued (HPD, open)
A
11/27/2024
Violation issued (HPD, open)
I
09/10/2024
Permit issued — Structural
B00968157-S1-ST
09/05/2024
Permit issued — General Construction
B00968157-I1-GC
07/18/2024
Objection resolved — Addressed
07/18/2024
Objection resolved — Addressed
07/18/2024
Objection resolved — Addressed
07/18/2024
Objection resolved — Addressed
07/16/2024
Objection raised — Other
07/16/2024
Objection raised — Admin
07/16/2024
Objection raised — Admin
07/16/2024
Objection raised — Fire_Protection
07/10/2024
Filed — Alteration
the drawings here are related to removal of existing first floor brick wall at exposure#3 rear wall and replace with proposed door window and lintel partial remove and replace wood floor sistering existing floor joists and removal of exterior non-load be
B00968157-S1
07/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANTHONY UGBEBOR
07/09/2024
Special inspection requirement — Structural Steel - Welding
ANTHONY UGBEBOR
07/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
PHILLIP ANZALONE
07/02/2024
Special inspection requirement — Masonry
ANTHONY UGBEBOR
07/01/2024
Special inspection requirement — Wood – Prefabricated I-Joists
ANTHONY UGBEBOR
07/01/2024
Special inspection requirement — Final
ANTHONY UGBEBOR
07/01/2024
Special inspection requirement — Structural Steel - Details
ANTHONY UGBEBOR
07/01/2024
Special inspection requirement — Structural Cold-Formed Steel
ANTHONY UGBEBOR
04/11/2024
Violation issued (HPD, open)
A
03/18/2024
Filed — Alteration
the drawings here are related to removal of existing first floor brick wall at exposure#3 rear wall and replace with proposed door window and lintel partial remove and replace wood floor sistering existing floor joists and removal of exterior non-load be
B00968157-I1
11/28/2023
Special inspection requirement — Fire-Resistance Rated Construction
PHILLIP ANZALONE
11/28/2023
Special inspection requirement — Tenant Protection Plan Compliance
PHILLIP ANZALONE
11/28/2023
Special inspection requirement — Energy Code Compliance Inspections
PHILLIP ANZALONE
11/20/2023
Violation issued (HPD, open)
I
03/27/2023
Violation issued (HPD, open)
A
03/02/2022
Violation issued (HPD, open)
A
10/14/2015
Violation issued (HPD, closed)
I
12/18/1992
Violation issued (HPD, open)
B
12/18/1992
Violation issued (HPD, open)
A
12/18/1992
Violation issued (HPD, open)
A
12/18/1992
Violation issued (HPD, open)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCMC101/27/2026
DOB NOWGeneral ConstructionPermit IssuedCMC110/07/2025
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC10/07/2025
DOB NOWStructuralPermit IssuedDLM CONTRACTORS09/10/2024
DOB NOWGeneral ConstructionPermit IssuedDLM CONTRACTORS09/05/2024
BISPLISSUEDCTA PLBG &HTG05/22/2002
BISOTISSUEDDVS IRON & ALUMINUIM WORKS INC05/22/2002
1 project · most recent 12/04/2025
FiledStatusContractorScope
12/04/2025CompleteBROOKYLN SOLARWORKS, LLC4 meters
1 project · most recent 07/10/2024
Steel Masonry Wood
FiledStatusContractorScope
07/10/2024Permit IssuedCMC1 CORPSteel, Masonry, Wood
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
09/25/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
09/25/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
09/25/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
09/25/2025FinalNARESH MAHANGUprogress
09/25/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
07/09/2024Structural Stability – Alterations of existing buildingsANTHONY UGBEBORspecial
07/09/2024Structural Steel - WeldingANTHONY UGBEBORspecial
07/04/2024Structural Stability – Alterations of existing buildingsPHILLIP ANZALONEspecial
07/02/2024MasonryANTHONY UGBEBORspecial
07/01/2024Wood – Prefabricated I-JoistsANTHONY UGBEBORspecial
07/01/2024FinalANTHONY UGBEBORprogress
07/01/2024Structural Steel - DetailsANTHONY UGBEBORspecial
07/01/2024Structural Cold-Formed SteelANTHONY UGBEBORspecial
11/28/2023Fire-Resistance Rated ConstructionPHILLIP ANZALONEprogress
11/28/2023Tenant Protection Plan CompliancePHILLIP ANZALONEspecial
11/28/2023Energy Code Compliance InspectionsPHILLIP ANZALONEprogress
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026B00968157-I1Request digital key ↗
08/24/2026B00968157-S1Request digital key ↗
08/20/2026B01293099-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
10/18/2023301327080Open ↗
▸BISWORK PERMIT APPLICATION1
11/09/2023301327080Open ↗
▸Seals & Professional Certifications17
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026B01293099-I1Open ↗
08/23/2026B00968157-I1Open ↗
08/23/2026B00968157-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B01293099-I1Open ↗
09/01/2026B01293099-I1Open ↗
08/23/2026B00968157-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026B00968157-I1Open ↗
08/24/2026B00968157-S1Open ↗
08/13/2026B01293099-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/24/2026B00968157-S1Open ↗
08/24/2026B00968157-I1Open ↗
08/13/2026B01293099-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01293099-I1Open ↗