← Back
BuildNYC
Elevator apt, semi-fireproof with stores
30 WASHINGTON STREET
BROOKLYN · BIN 3344163
💬 Discuss this project
1888Year Built
7Stories
D7Building Class
C6-2AZoning
87,129 sfGross Floor Area
95Units
LL97 CoveredRent Stabilized6 Active Violations 4 unresolved · 2 paperwork only 1 old, status unconfirmed ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: 30 Washington Rental · 11,882 sf lot · 7.33 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofTwo Trees Management CompanyUnder Construction1p · 1 filing · 10 docs
Sub-BasementDevine R6p · 1 filing · 20 docs
Site & exteriorTwo Trees Management CompanyUnder Construction25p · 3 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
One Main203/21/2026
30 Washington Rental103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Black Sheep Engineering Group408/11/2026
Qwa Studio402/06/2026
Structural Engineering Buro106/05/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CS BridgeScaffold308/13/2026
Hassan General ContGeneral Contractor208/20/2026
Kale ConstructionGeneral Contractor104/08/2026
XH&RC Plumbing and HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Qwa Studio9293402/06/2026
Structural Engineering BU5883106/05/2023
Building Lifecycle
All (102)Filed (9)Permit Issued (6)Signed Off (1)Violation (60)Inspection (2)Special Inspection (24)
08/18/2026
Permit issued — General Construction
B00816095-I1-GC
08/12/2026
Permit issued — Sidewalk Shed
B00816095-S1-SH
08/11/2026
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01391741-P1
08/11/2026
Filed — Alteration
LIMITED FACADE REPAIRS INCLUDING RE POINTING OF MORTAR JOINTS, REPLACEMENT OF DAMAGED WINDOW SILLS. REPLACEMENT OF DAMAGED STONE AND DETERIORATED BRICKWORK. REPLACEMENT OF EXISTING BRICK ARCH LINTEL.
B00816095-S1
07/01/2026
Signed off — Alteration
B01391304-I1
04/24/2026
Permit issued — Sidewalk Shed
B01391304-I1-SH
04/24/2026
Permit issued — Supported Scaffold
B01391741-I1-SF
04/23/2026
Filed — Alteration
B01391304-I1
04/23/2026
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01391741-I1
04/02/2026
Violation issued (FDNY_NOV, closed)
04/02/2026
Violation issued (FDNY_NOV, closed)
03/26/2026
Permit issued — General Construction
B00816095-I1-GC
02/10/2026
Special inspection requirement — Final
Kun Wu
02/10/2026
Special inspection requirement — Interior lighting power
Kun Wu
02/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kun Wu
02/10/2026
Special inspection requirement — Lighting controls
Kun Wu
02/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
Kun Wu
02/10/2026
Special inspection requirement — Mechanical Systems
Kun Wu
02/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Kun Wu
02/06/2026
Filed — Alteration
Interior renovation of existing retail space. New plumbing fixtures and bathroom per plan. No change in egress, use or occupancy.
B01188724-P2
01/01/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kun Wu
12/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
Kun Wu
12/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Kun Wu
12/17/2025
Filed — Alteration
Interior renovation of existing retail space. New plumbing fixtures and bathroom per plan. No change in egress, use or occupancy.
B01188724-P1
12/16/2025
Special inspection requirement — Interior lighting power
Kun Wu
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kun Wu
12/16/2025
Special inspection requirement — Mechanical Systems
Kun Wu
12/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
Kun Wu
12/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Kun Wu
12/16/2025
Special inspection requirement — Final
Kun Wu
12/16/2025
Special inspection requirement — Lighting controls
Kun Wu
08/18/2025
Violation issued (FDNY_NOV, closed)
08/18/2025
Violation issued (FDNY_NOV, closed)
06/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Kun Wu
06/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kun Wu
06/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
Kun Wu
06/11/2025
Permit issued — Plumbing
B01188724-S1-PL
04/09/2025
Filed — Alteration
Interior renovation of existing retail space. New plumbing fixtures and bathroom per plan. No change in egress, use or occupancy.
B01188724-S1
04/08/2025
Filed — Alteration
Interior renovation of existing retail space. New plumbing fixtures and bathroom per plan. No change in egress, use or occupancy.
B01188724-I1
04/11/2024
Violation issued (ECB, open)
Local Law
09/07/2023
Violation issued (ECB, open)
Elevators
09/07/2023
Violation issued (ECB, open)
Elevators
06/21/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/05/2023
Filed — Alteration
LIMITED FACADE REPAIRS INCLUDING RE POINTING OF MORTAR JOINTS, REPLACEMENT OF DAMAGED WINDOW SILLS. REPLACEMENT OF DAMAGED STONE AND DETERIORATED BRICKWORK. REPLACEMENT OF EXISTING BRICK ARCH LINTEL.
B00816095-I1
06/02/2023
Special inspection requirement — Energy Code Compliance Inspections
Ruslan Solovyev
06/02/2023
Special inspection requirement — Masonry
Ruslan Solovyev
06/02/2023
Special inspection requirement — Tenant Protection Plan Compliance
Ruslan Solovyev
04/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/20/2023
Special inspection requirement — Final
Ruslan Solovyev
07/09/2022
Violation issued (HPD, open)
B
07/09/2022
Violation issued (HPD, open)
B
07/09/2022
Violation issued (HPD, closed)
A
07/09/2022
Violation issued (HPD, closed)
C
07/09/2022
Violation issued (HPD, closed)
A
07/09/2022
Violation issued (HPD, closed)
A
07/09/2022
Violation issued (HPD, closed)
A
07/09/2022
Violation issued (HPD, closed)
A
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedHassan General Cont08/18/2026
DOB NOWSidewalk ShedPermit IssuedCS Bridge08/12/2026
DOB NOWSidewalk ShedSigned-offCS Bridge04/24/2026
DOB NOWSupported ScaffoldPermit IssuedCS Bridge04/24/2026
DOB NOWGeneral ConstructionPermit IssuedHassan General Cont03/26/2026
DOB NOWPlumbingSigned-offXH&RC Plumbing and Heating06/11/2025
BIS—ISSUEDGreen Star Builders07/30/2013
BISEQISSUEDGreen Star Builders07/30/2013
BISOTISSUEDWasa05/15/2013
BISOTISSUEDGreen Star Builders04/04/2013
BISEQISSUEDCS Bridge03/25/2013
BISOTISSUEDCS Bridge03/25/2013
BISEQISSUEDCS Bridge03/19/2013
BISEQISSUEDCS Bridge03/19/2013
BISEQISSUEDCS Bridge03/08/2013
BISEQISSUEDCS Bridge03/08/2013
BISEQISSUEDCS Bridge03/08/2013
BISBLISSUEDCopper III Heating & Plumbing02/25/2013
BISSDISSUEDCopper Services12/20/2012
BISSDISSUEDCopper Services09/05/2012
BISSDISSUEDCopper Services09/04/2012
BISSPISSUEDCopper Services09/04/2012
BISPLISSUEDCopper III Heating & Plumbing08/28/2012
BISEQISSUEDGreen Star Builders07/19/2012
BIS—ISSUEDGreen Star Builders07/19/2012
BISEQISSUEDCS Bridge06/13/2012
BISEQISSUEDGreen Star Builders04/18/2012
BISOTISSUEDGreen Star Builders04/18/2012
BISEQISSUEDCS Bridge04/17/2012
BISEQISSUEDCS Bridge04/03/2012
BISEQISSUEDCS Bridge03/29/2012
BISEQISSUEDCS Bridge03/27/2012
BISEQISSUEDCS Bridge03/22/2012
BISOTISSUEDGreen Star Builders01/25/2012
BISEQISSUEDGreen Star Builders01/25/2012
1 project · most recent 02/06/2026
Water/Sanitary
FiledStatusContractorScope
02/06/2026Signed-offXH&RC Plumbing and HeatingWater/Sanitary
3 projects · most recent 08/11/2026
General Wiring
FiledStatusContractorScope
08/11/2026Permit IssuedNash Electric Services—
04/23/2026CompleteNash Electric Services—
06/23/2025Permit IssuedCL ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/01/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
02/10/2026FinalKun Wuprogress
02/10/2026Interior lighting powerKun Wuenergy_progress
02/10/2026Fire-Resistant Penetrations and JointsKun Wuspecial
02/10/2026Lighting controlsKun Wuenergy_progress
02/10/2026Tenant Protection Plan ComplianceKun Wuspecial
02/10/2026Mechanical SystemsKun Wuspecial
02/10/2026Energy Code Compliance InspectionsKun Wuprogress
12/19/2025Fire-Resistant Penetrations and JointsKun Wuspecial
12/19/2025Tenant Protection Plan ComplianceKun Wuspecial
12/19/2025Energy Code Compliance InspectionsKun Wuprogress
12/16/2025Interior lighting powerKun Wuenergy_progress
12/16/2025Fire-Resistant Penetrations and JointsKun Wuspecial
12/16/2025Mechanical SystemsKun Wuspecial
12/16/2025Tenant Protection Plan ComplianceKun Wuspecial
12/16/2025Energy Code Compliance InspectionsKun Wuprogress
12/16/2025FinalKun Wuprogress
12/16/2025Lighting controlsKun Wuenergy_progress
06/26/2025Energy Code Compliance InspectionsKun Wuprogress
06/26/2025Fire-Resistant Penetrations and JointsKun Wuspecial
06/26/2025Tenant Protection Plan ComplianceKun Wuspecial
06/02/2023Energy Code Compliance InspectionsRuslan Solovyevprogress
06/02/2023MasonryRuslan Solovyevspecial
06/02/2023Tenant Protection Plan ComplianceRuslan Solovyevspecial
01/20/2023FinalRuslan Solovyevprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Devine RRetailSub-basement
Project B01188724 Alteration · Permit Entire · 04/08/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 388 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/27/2026B00816095-S1Request digital key ↗
08/27/2026B00816095-I1Request digital key ↗
08/18/2026B01188724-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits65
▸BISPLAN / WORK APPROVAL APPLICATION30
12/16/2013320817782Open ↗
06/08/2013320321362Open ↗
06/06/2013320321362Open ↗
Showing 3 of 30 on file for this type
▸BISWORK PERMIT APPLICATION29
08/01/2013320321362Open ↗
08/01/2013320321362Open ↗
05/20/2013320727905Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWLPC Approval/Permit5
08/13/2026B01188724-P1Open ↗
08/13/2026B00816095-I1Open ↗
08/13/2026B01188724-P2Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/20/2013320321362Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISADDRESS - NEW HOUSE NUMBER APPROVED2
09/19/2013320321362Open ↗
09/19/2013320321362Open ↗
▸BISZRD1-Zoning Resolution Determination1
05/10/2013320321362Open ↗
▸BISZoning Diagram (ZD1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT I- CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications90
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION37
08/28/2013320321362Open ↗
08/08/2013320373378Open ↗
06/28/2013320725729Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
10/09/2026B00816095-I1Open ↗
10/09/2026B00816095-I1Open ↗
09/02/2026B01188724-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
10/09/2026B00816095-I1Open ↗
10/09/2026B00816095-I1Open ↗
09/02/2026B01188724-P1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
03/13/2013320725729Open ↗
08/30/2012320549563Open ↗
Showing 2 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM10
03/13/2013320725729Open ↗
08/30/2012320549563Open ↗
Showing 2 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/27/2026B00816095-S1Open ↗
08/27/2026B00816095-I1Open ↗
08/18/2026B01188724-P1Open ↗
Showing 3 of 9 on file for this type
▸Trade Schedules & Equipment57
▸BISSELF-CERT PLUMBING NOTICE32
10/24/2013320373387Open ↗
09/04/2013320549554Open ↗
08/22/2013320373387Open ↗
Showing 3 of 32 on file for this type
▸BISSCHEDULE B - PLUMBING10
06/06/2013320321362Open ↗
06/03/2013320321362Open ↗
05/22/2013320373387Open ↗
Showing 3 of 10 on file for this type
▸BISWATER METER PERMIT : DEP-METER6
07/25/2013320373387Open ↗
07/25/2013320373387Open ↗
06/25/2013320373387Open ↗
Showing 3 of 6 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
06/28/2013320373387Open ↗
06/25/2013320373387Open ↗
▸BISEQUIPMENT USE PERMITS2
08/16/2013320321362Open ↗
08/13/2013320321362Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT2
08/16/2013320321362Open ↗
08/13/2013320321362Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
09/06/2013320373369Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B1
06/13/2013320321362Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection5
▸BISST-1 Street Tree Checklist2
09/10/2013320321362Open ↗
Showing 1 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE SUPPORTING DOCUMENT1
10/09/2013320321362Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026B00816095-I1Open ↗
08/18/2026B01188724-S1Open ↗
08/18/2026B01188724-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice to Proceed4
08/13/2026B01188724-P1Open ↗
08/13/2026B01188724-P2Open ↗
08/13/2026B01188724-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026B01188724-S1Open ↗
08/13/2026B01188724-I1Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
10/01/2012320373378Open ↗
▸Energy Compliance8
▸BISTR8: Energy Code Progress Inspections4
06/21/2013320373378Open ↗
11/14/2012320373378Open ↗
10/19/2012320373378Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
08/08/2013320373378Open ↗
Showing 1 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
08/08/2013320373378Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
08/31/2013320321362Open ↗
06/27/2013320321362Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
10/24/2012320321362Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
09/10/2012320373387Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs63
▸BISLETTERS - SUPPORTING DOCUMENTATION18
01/11/2014320817782Open ↗
10/24/2013320321362Open ↗
10/01/2013320373314Open ↗
Showing 3 of 18 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
09/05/2013320373378Open ↗
08/14/2013320549563Open ↗
08/08/2013320424947Open ↗
Showing 3 of 15 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
12/16/2013320817782Open ↗
03/13/2013320725729Open ↗
03/11/2013320727905Open ↗
Showing 3 of 13 on file for this type
▸BISCCD1-Construction Code Determination5
05/10/2013320321362Open ↗
10/24/2012320321362Open ↗
Showing 2 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE5
06/11/2013320321362Open ↗
06/08/2013320321362Open ↗
05/03/2013320321362Open ↗
Showing 3 of 5 on file for this type
▸BISLANDMARKS APPROVAL3
09/27/2012320373378Open ↗
Showing 1 of 3 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM3
06/25/2013320373387Open ↗
06/13/2013320321362Open ↗
06/13/2013320321362Open ↗
▸BISTAP LETTER - FIRE SVC : DEP-FIRE1
06/25/2013320373387Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT14
10/02/2013320373387Open ↗
10/01/2013320373369Open ↗
10/01/2013320373314Open ↗
Showing 3 of 14 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
01/11/2014320817782Open ↗
▸Filing & Intake Forms35
▸BISADDITIONAL INFORMATION17
08/28/2013320321362Open ↗
08/20/2013320321362Open ↗
04/03/2013320725729Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING COVER SHEET12
12/16/2013320817782Open ↗
03/13/2013320725729Open ↗
03/11/2013320727905Open ↗
Showing 3 of 12 on file for this type
▸BISeFiling Job Application Cover Sheet6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Other Documents11
▸BISENVIRONMENTAL 'E' DEP NOTICE TO PROCEED3
10/01/2012320373378Open ↗
09/12/2012320321362Open ↗
09/10/2012320373387Open ↗
▸BISENVIRONMENTAL -E- DEP NOTICE OF SATIS2
10/09/2013320321362Open ↗
08/20/2013320321362Open ↗
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT2
06/28/2013320321362Open ↗
06/28/2013320321362Open ↗
▸BISENVIRONMENTAL 'E' DEP NOTICE OF SATISFACTION2
09/24/2013320373387Open ↗
08/23/2013320373378Open ↗
▸BISSD/SP FIRE PUMP TEST : FP-861
06/28/2013320373387Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type