Building
Morris Heights/university Heights Ncp
30 WEST 182 STREET · BIN 2131257
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open Violations
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction29p · 1 filing · 20 docs
Floor 7Under Construction21p · 1 filing · 20 docs
Floor 6Under Construction25p · 1 filing · 20 docs
Floor 5Under Construction21p · 1 filing · 20 docs
Floor 4Under Construction25p · 1 filing · 20 docs
Floor 3Under Construction62p · 1 filing · 20 docs
Floor 2Under Construction66p · 1 filing · 20 docs
Floor 1Under Construction65p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JCAL DEVELOPMENT1807/08/2026
JCAL CONSTRUCTION903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OCV ARCHITECTS2303/17/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.2103/21/2026
Rigid Structural Design, LLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JCAL CONSTRUCTION LLCGeneral Contractor1607/08/2026
AURA PLUMBING INCFire Protection307/08/2026
4 BROTHERS & SONS FENCEGeneral Contractor207/08/2026
AURA PLUMBING INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VIBRANALYSIS INC., DBA VT68642203/17/2026
Building Lifecycle
All (96)Filed (23)Permit Issued (17)Signed Off (5)Violation (1)Inspection (20)Special Inspection (30)
04/23/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/16/2026
Signed off — New Building
INSTALL NEW SPRINKLER SYSTEM AND ASSOCIATED PIPING AS PER PLANS FILED.
X08030027-S3
04/09/2026
Signed off — New Building
INSTALL NEW SPRINKLER SYSTEM AND ASSOCIATED PIPING AS PER PLANS FILED.
X08030027-S2
04/09/2026
Signed off — New Building
INSTALL NEW SPRINKLER SYSTEM AND ASSOCIATED PIPING AS PER PLANS FILED.
X08030027-S1
03/31/2026
Signed off — New Building
INSTALL NEW SPRINKLER SYSTEM AND ASSOCIATED PIPING AS PER PLANS FILED.
X08030027-S4
03/17/2026
Filed — New Building
INSTALL NEW SPRINKLER SYSTEM AND ASSOCIATED PIPING AS PER PLANS FILED.
X08030027-B2
03/16/2026
Special inspection requirement — Electrical motors and elevators
Edward Ettinger
03/16/2026
Special inspection requirement — Lighting in dwelling units
Edward Ettinger
03/16/2026
Special inspection requirement — Maintenance information
Edward Ettinger
03/16/2026
Special inspection requirement — Fenestration air leakage
Edward Ettinger
03/16/2026
Special inspection requirement — Exterior lighting power
Edward Ettinger
03/16/2026
Special inspection requirement — Air barrier - visual inspection
Edward Ettinger
03/16/2026
Special inspection requirement — Protection of exposed foundation insulation
Edward Ettinger
03/16/2026
Special inspection requirement — Vestibules
Edward Ettinger
03/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Edward Ettinger
03/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Edward Ettinger
03/16/2026
Special inspection requirement — Permanent certificate
Edward Ettinger
03/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
Edward Ettinger
03/16/2026
Special inspection requirement — Lighting controls
Edward Ettinger
03/16/2026
Special inspection requirement — Fenestration areas
Edward Ettinger
03/16/2026
Special inspection requirement — Insulation placement and R values
Edward Ettinger
03/16/2026
Special inspection requirement — Interior lighting power
Edward Ettinger
03/16/2026
Special inspection requirement — Metering
Edward Ettinger
03/16/2026
Special inspection requirement — Sprayed fire-resistant materials
JUAN GOMEZ
03/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
02/01/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/28/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/28/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/22/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/15/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/13/2026
Filed — New Building
INSTALL NEW SPRINKLER SYSTEM AND ASSOCIATED PIPING AS PER PLANS FILED.
X08030027-B1
01/09/2026
Permit issued — Sprinklers
X08030027-S6-EW-SP
01/08/2026
Special inspection requirement — Duct leakage testing, insulation and design
Edward Ettinger
01/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Edward Ettinger
01/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
01/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Edward Ettinger
01/08/2026
Special inspection requirement — Shutoff dampers
Edward Ettinger
01/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
Edward Ettinger
01/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Edward Ettinger
01/08/2026
Special inspection requirement — Maintenance information
Edward Ettinger
01/08/2026
Special inspection requirement — Final
JUAN GOMEZ
01/08/2026
Special inspection requirement — Metering
Edward Ettinger
01/08/2026
Special inspection requirement — Mechanical Systems
JUAN GOMEZ
12/02/2025
Filed — New Building
INSTALL NEW SPRINKLER SYSTEM AND ASSOCIATED PIPING AS PER PLANS FILED.
X08030027-A8
11/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/04/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/15/2025
Signed off — New Building
INSTALL NEW SPRINKLER SYSTEM AND ASSOCIATED PIPING AS PER PLANS FILED.
X08030027-S8
09/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/13/2025
Filed — New Building
INSTALL NEW SPRINKLER SYSTEM AND ASSOCIATED PIPING AS PER PLANS FILED.
X08030027-A3
08/06/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/01/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/30/2025
Filed — New Building
INSTALL NEW SPRINKLER SYSTEM AND ASSOCIATED PIPING AS PER PLANS FILED.
X08030027-A4
07/25/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/02/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/15/2025
Permit issued — Plumbing
X08030027-S5-PL
04/23/2025
Permit issued — General Construction
X08030027-I1-GC
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedAURA PLUMBING INC01/09/2026
DOB NOWPlumbingPermit IssuedAURA PLUMBING INC05/15/2025
DOB NOWGeneral ConstructionPermit IssuedJCAL CONSTRUCTION LLC04/23/2025
DOB NOWSprinklersPermit IssuedAURA PLUMBING INC12/02/2024
DOB NOWStructuralSigned-offJCAL CONSTRUCTION LLC10/29/2024
DOB NOWMechanical SystemsSigned-offJCAL CONSTRUCTION LLC10/25/2024
DOB NOWConstruction FenceSigned-off4 BROTHERS SONS FENCE07/24/2024
DOB NOWPlumbingPermit IssuedAURA PLUMBING INC05/22/2024
DOB NOWGeneral ConstructionPermit IssuedJCAL CONSTRUCTION LLC05/17/2024
DOB NOWGeneral ConstructionPermit IssuedJCAL CONSTRUCTION LLC05/14/2024
DOB NOWFoundationSigned-offJCAL CONSTRUCTION LLC01/25/2024
DOB NOWSprinklersPermit IssuedAURA PLUMBING INC11/14/2023
DOB NOWStructuralSigned-offJCAL CONSTRUCTION LLC11/13/2023
DOB NOWMechanical SystemsSigned-offJCAL CONSTRUCTION LLC10/27/2023
DOB NOWSupport of ExcavationSigned-offJCAL CONSTRUCTION LLC10/18/2023
DOB NOWGeneral ConstructionPermit IssuedJCAL CONSTRUCTION LLC10/13/2023
DOB NOWConstruction FenceSigned-off4 BROTHERS SONS FENCE07/20/2023
1 project · most recent 05/08/2026
General Wiring
FiledStatusContractorScope
05/08/2026Permit IssuedTUXEDO ELEC'L CONTR'G INCGeneral Wiring
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
04/23/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/01/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/28/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/28/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/22/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/15/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/04/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/06/2025Fail-Final General Construction Non-Directive 14FailView ↗
08/01/2025Fail-Final General Construction Non-Directive 14FailView ↗
07/25/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/02/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/28/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/17/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/17/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 112
DateRequirementInspectorRole
03/16/2026Fenestration air leakageEdward Ettingerenergy_progress
03/16/2026Interior lighting powerEdward Ettingerenergy_progress
03/16/2026Lighting in dwelling unitsEdward Ettingerenergy_progress
03/16/2026Air barrier - visual inspectionEdward Ettingerenergy_progress
03/16/2026Exterior lighting powerEdward Ettingerenergy_progress
03/16/2026Sprayed fire-resistant materialsJUAN GOMEZspecial
03/16/2026Energy Code Compliance InspectionsEdward Ettingerprogress
03/16/2026Fire-Resistance Rated ConstructionEdward Ettingerprogress
03/16/2026MeteringEdward Ettingerenergy_progress
03/16/2026Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
03/16/2026Insulation placement and R valuesEdward Ettingerenergy_progress
03/16/2026Protection of exposed foundation insulationEdward Ettingerenergy_progress
03/16/2026Permanent certificateEdward Ettingerenergy_progress
03/16/2026Lighting controlsEdward Ettingerenergy_progress
03/16/2026Fenestration areasEdward Ettingerenergy_progress
03/16/2026VestibulesEdward Ettingerenergy_progress
03/16/2026Fenestration and door U-factor and product ratingsEdward Ettingerenergy_progress
03/16/2026Maintenance informationEdward Ettingerenergy_progress
03/16/2026Electrical motors and elevatorsEdward Ettingerenergy_progress
01/08/2026FinalJUAN GOMEZprogress
01/08/2026HVAC-R and service water heating system controlsEdward Ettingerenergy_progress
01/08/2026Duct leakage testing, insulation and designEdward Ettingerenergy_progress
01/08/2026MeteringEdward Ettingerenergy_progress
01/08/2026Shutoff dampersEdward Ettingerenergy_progress
01/08/2026HVAC-R and service water piping design and insulationEdward Ettingerenergy_progress
Latest 25 of 112.
▾Documents — 227 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch23
08/17/2026X08030027-B2Request digital key ↗
08/17/2026X08030027-A4Request digital key ↗
08/17/2026X08030027-A3Request digital key ↗
Showing 3 of 23 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
06/26/2025240347148Open ↗
07/31/2023240347148Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
11/05/2025240347148Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/17/2026X08030027-I1Open ↗
08/17/2026X08030027-B2Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/17/2026X08030027-I1Open ↗
08/17/2026X08030027-B2Open ↗
08/13/2026X08030027-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026X08030027-I1Open ↗
▸Seals & Professional Certifications127
▸DOB NOWProgress Inspector Seal & Signature56
09/29/2026X08030027-P7Open ↗
09/29/2026X08030027-P7Open ↗
09/01/2026X08030027-S1Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature46
09/29/2026X08030027-P7Open ↗
09/29/2026X08030027-P7Open ↗
09/19/2026X08030027-S6Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/17/2026X08030027-A4Open ↗
08/17/2026X08030027-A3Open ↗
08/17/2026X08030027-A2Open ↗
Showing 3 of 23 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/31/2023240347148Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/31/2023240347148Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/17/2026X08030027-I1Open ↗
08/17/2026X08030027-B2Open ↗
Showing 2 of 5 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist5
08/17/2026X08030027-I1Open ↗
08/17/2026X08030027-B2Open ↗
08/17/2026X08030027-A8Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREES SITE PLAN1
07/31/2023240347148Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
07/31/2023240347148Open ↗
▸BISSTREET TREE CHECKLIST1
07/31/2023240347148Open ↗
▸DOB NOWStreet Tree Sign Off1
08/17/2026X08030027-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026X08030027-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/17/2026X08030027-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026X08030027-S2Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X08030027-S2Open ↗
▸Approvals, Objections & Sign-offs23
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter22
08/17/2026X08030027-P2Open ↗
08/17/2026X08030027-B2Open ↗
08/17/2026X08030027-A4Open ↗
Showing 3 of 22 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
07/31/2023240347148Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
01/30/2026240347148Open ↗
12/01/2025240347148Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/31/2023240347148Open ↗
▸Other Documents18
▸DOB NOWSite Survey: Initial5
08/17/2026X08030027-B2Open ↗
08/17/2026X08030027-I1Open ↗
08/13/2026X08030027-A8Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/17/2026X08030027-B2Open ↗
08/17/2026X08030027-I1Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWProperty Ownership Certification4
08/17/2026X08030027-B2Open ↗
08/17/2026X08030027-I1Open ↗
08/17/2026X08030027-A8Open ↗
Showing 3 of 4 on file for this type
▸BISSupporting Document: Fee Deferment1
06/26/2025240347148Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
07/31/2023240347148Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X08030027-S3Open ↗
▸DOB NOWFinal Survey1
08/17/2026X08030027-I1Open ↗