← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
30 Lincoln Plaza
30 WEST 63 STREET · BIN 1027463
💬 Discuss this project
1979Year Built
33Stories
RMBuilding Class
C4-7Zoning
584,905 sfGross Floor Area
463Units
LL97 CoveredRent Stabilized2 Open Violations ▸FISP: SAFEFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 30 LINCOLN PLAZA CONDOMINIUM · 38,149 sf lot · 15.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Permit Issued — active, not yet Signed-off
Roof7p · 4 filings · 16 docs
Floor 311p · 1 filing · 19 docs
Floor 30
Floor 29
Floor 28
Floor 27
Floor 268p · 3 filings · 15 docs
Floor 25
Floor 24
Floor 239p · 3 filings · 18 docs
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 42p · 1 filing · 20 docs
Floor 3
Floor 2
Floor 1Under Construction8p · 3 filings · 10 docs
1 job · most recent 06/23/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/23/2025——Ventilation Systems
Ventilation
2 jobs · most recent 07/28/2026
Water/Sanitary Gas
FiledStatusContractorScope
07/28/2026——Water/Sanitary
04/29/2026Signed-offABSOLUTE PLBG & HTG CORPGas, Water/Sanitary
25 jobs · most recent 08/28/2026
General Wiring
FiledStatusContractorScope
08/28/2026CompleteLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
08/24/2026Permit IssuedLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
07/16/2026CompletePOWER DIRECT ELECTRIC INC—
07/16/2026CompletePOWER DIRECT ELECTRIC INC—
06/26/2026CompleteBNH ELECTRICAL CORP—
03/19/2026CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
03/16/2026CompleteSTELLMANN ELECTRICAL CORPGeneral Wiring
03/16/2026CompleteSTELLMANN ELECTRICAL CORPGeneral Wiring
03/05/2026CompleteLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
03/05/2026CompleteLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
01/27/2026CancelledSTELLMANN ELECTRICAL CORPGeneral Wiring
12/04/2025CompleteZIN ELECTRICAL, INC—
11/06/2025CompleteARMA ELECTRIC INCGeneral Wiring
10/21/2025CompleteHIGH QUALITY ELEC.OF NYC—
09/29/2025Permit IssuedACCURATE ELEC'L CONTR'S CGeneral Wiring
1 job · most recent 02/03/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
02/03/2026Signed-offFX CONSTRUCTION LLCTenant Protection Plan 72 Hour
1 job · most recent 01/31/2025
FiledStatusContractorScope
01/31/2025Signed-offSTREAMLINE CONSULTANTS NY—
Building Lifecycle
All (300)Filed (55)Permit Issued (52)Signed Off (30)Facade (FISP) (15)Violation (60)Inspection (28)Objection (30)Special Inspection (30)
07/28/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE CREATING AN EATING & DRINKING ESTABLISHMENT INCLUDING INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED HEREIN. INTERIOR DEMO FILED UNDER GC #M01385037-I1
M01427091-S1
07/23/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE CREATING AN EATING & DRINKING ESTABLISHMENT INCLUDING INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED HEREIN. INTERIOR DEMO FILED UNDER GC #M01385037-I1
M01427091-I1
07/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/22/2026
Special inspection requirement — Maintenance information
07/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/22/2026
Special inspection requirement — Energy Code Compliance Inspections
07/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/07/2026
Special inspection requirement — Final
07/07/2026
Special inspection requirement — Lighting controls
07/07/2026
Special inspection requirement — Energy Code Compliance Inspections
07/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/07/2026
Special inspection requirement — Interior lighting power
06/30/2026
Signed off — Alteration
Interior renovation of existing unit 4-KLM. No change to occupancy, use or egress.
M01202020-S1
06/24/2026
Cycle 10 facade report signed — SWARMP
06/23/2026
Signed off — Alteration
Interior renovation of existing unit 4-KLM. No change to occupancy, use or egress.
M01202020-I1
06/23/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/16/2026
Signed off — Alteration
INTERIOR RENOVATION OF AN EXISTING DWELLING UNIT, MINOR PARTITION WORK, RENOVATION OF 2 EXISTING BATHROOMS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M01296011-I1
05/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
Richard FURMAN
05/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eugene Khananov
05/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Richard FURMAN
05/13/2026
Permit issued — General Construction
M01385037-I1-GC
05/13/2026
Cycle 10 facade inspection completed
05/05/2026
Signed off — Alteration
Propose interior renovation @ partial 14th floor floor Apt#14N with partition work and finish work as per plan. No change in use, egress, or occupancy.
M01151233-I1
04/29/2026
Filed — Alteration
Interior renovation of existing unit 4-KLM. No change to occupancy, use or egress.
M01202020-P2
04/28/2026
Violation issued (ECB, open)
Construction
04/21/2026
Filed — Alteration
Demo and Construction of non-bearing walls, dismising wall shown on the drawings filed herewith. There will be no change to occupancy, use, or egress.
M01385037-I1
04/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
EVAN PARGANOS
04/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EVAN PARGANOS
04/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
EVAN PARGANOS
04/09/2026
Special inspection requirement — Final
EVAN PARGANOS
03/27/2026
Cycle 10 facade report submitted
03/23/2026
Special inspection requirement — Lighting in dwelling units
Steven Cummings
03/23/2026
Special inspection requirement — Interior lighting power
Steven Cummings
03/23/2026
Special inspection requirement — Final
Steven Cummings
03/23/2026
Special inspection requirement — Post-installed Anchors
Steven Cummings
03/06/2026
Filed — Alteration
Interior renovation of existing unit 4-KLM. No change to occupancy, use or egress.
M01202020-P1
03/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
Richard FURMAN
03/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eugene Khananov
03/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Richard FURMAN
03/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/24/2026
Objection resolved — Addressed
02/20/2026
Objection raised — Admin
02/03/2026
Filed — Alteration
INTERIOR RENOVATION OF AN EXISTING DWELLING UNIT, MINOR PARTITION WORK, RENOVATION OF 2 EXISTING BATHROOMS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M01296011-P1
02/02/2026
Signed off — Alteration
Installation of suspended scaffold for facade inspection/repair.
M01238584-I1
01/28/2026
Special inspection requirement — Post-installed Anchors
01/28/2026
Special inspection requirement — Final
Steven Cummings
01/28/2026
Special inspection requirement — Lighting in dwelling units
Steven Cummings
01/28/2026
Special inspection requirement — Interior lighting power
Steven Cummings
01/15/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/31/2025
Signed off — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
M01302151-I1
12/04/2025
Permit issued — Suspended Scaffold
M01238584-I1-SC
12/04/2025
Permit issued — Suspended Scaffold
M01174447-I1-SC
12/04/2025
Permit issued — Suspended Scaffold
M01238584-I1-SC
11/25/2025
Permit issued — General Construction
M01296011-I1-GC
11/04/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/30/2025
Filed — Alteration
Propose interior renovation @ partial 14th floor floor Apt#14N with partition work and finish work as per plan. No change in use, egress, or occupancy.
M01151233-P1
10/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 300 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MILSTEIN PROPERTIES2307/08/2026
MILFORD MANAGEMENT45407/08/2026
PYRAMID RESTORATION NY807/08/2026
KINGS GROUP NY404/09/2026
289 KOSCIUSZKO ST LLC503/22/2026
30 LINCOLN PLAZA CONDOMINIUM14903/22/2026
LINCOLN PLAZA CINEMA303/22/2026
PM PARTNERS603/22/2026
S + P ASSOC/CINEMA203/22/2026
TIMBO CONTRACTING103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.603/21/2026
BIG ORANGE EXPEDITING403/21/2026
MODERN BUILDING CONSULTANT203/21/2026
PYRAMID RESTORATION NY203/21/2026
STONECORE LLC103/21/2026
MUNYC ARCHITECTURE PLLC1203/21/2026
BURNHAM NATIONWIDE INC103/21/2026
UNITED SAFETY CONSULTANTS103/21/2026
CODE1603/21/2026
ACA ASSOCIATES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LYTER GROUP INCGeneral Contractor603/21/2026
JAB INDUSTRIES INCGeneral Contractor607/08/2026
AIK RENOVATION INCGeneral Contractor607/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor507/08/2026
DOMINICK CATELLOElectrical503/21/2026
NEST BUILDERS CORPGeneral Contractor407/08/2026
SUN MECHANICAL CORPPlumbing407/08/2026
HI-TECH PLUMBING & HEATINGPlumbing407/08/2026
NTS CONTRACTORS, CORPGeneral Contractor407/08/2026
RYLEE MECHANICAL SOLUTIONGeneral Contractor303/21/2026
SKYLINE RESTORATION INCGeneral Contractor307/08/2026
HOME DESIGN GROUP NYC LLCGeneral Contractor303/21/2026
MILFORD MANAGEMENT CORPGeneral Contractor303/21/2026
ERION SKIFTERI CONSTRUCTIGeneral Contractor303/21/2026
DONNELLY MECHANICAL CORPGeneral Contractor203/21/2026
ARMA ELECTRIC INCElectrical203/22/2026
P.S.I. MECHANICALPlumbing207/08/2026
KINGS GROUP NY CORPGeneral Contractor104/09/2026
PYRAMID RESTORATION NY LLGeneral Contractor107/08/2026
SCIAME CONSTRUCTION LLCGeneral Contractor107/08/2026
UPSTRATE INCGeneral Contractor107/08/2026
ABSOLUTE PLBG & HTG CORPPlumbing107/08/2026
EVERYDAY MECHANICAL CORPPlumbing107/08/2026
VILLAGE P & H NY INCPlumbing107/08/2026
ALEXANDER EUGENEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EUGENE KHANANOV ARCHITECT2816404/29/2026
EP INSPECTIONS AND COMMIS7079104/21/2026
MSM ENGINEERING SERVICES,8449210/30/2025
BLOCKWORK DESIGN BUILD LL8258110/16/2025
SOCOTEC, INC.301108/01/2025
CORTNEY WALLESTON ARCHITE3881206/23/2025
KZ ENGINEERING, P.C.4665106/10/2025
AMERILAND BROOK LLC1506303/20/2025
GREAT WALL CONSULTANT P.E5633101/22/2025
VINCENT J. LIOTTA P. E.1974108/21/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSCIAME CONSTRUCTION LLC05/13/2026
DOB NOWSuspended ScaffoldSigned-offSTREAMLINE CONSULTANTS NY12/04/2025
DOB NOWSuspended ScaffoldSigned-offSTREAMLINE CONSULTANTS NY12/04/2025
DOB NOWSuspended ScaffoldSigned-offSTREAMLINE CONSULTANTS NY12/04/2025
DOB NOWGeneral ConstructionSigned-offFX CONSTRUCTION11/25/2025
DOB NOWGeneral ConstructionPermit IssuedPYRAMID RESTORATION NY LL10/21/2025
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP10/15/2025
DOB NOWGeneral ConstructionPermit IssuedAIK RENOVATION INC07/02/2025
DOB NOWSuspended ScaffoldSigned-offSTREAMLINE CONSULTANTS NY06/12/2025
DOB NOWPlumbingSigned-offABSOLUTE PLBG & HTG CORP05/22/2025
DOB NOWGeneral ConstructionPermit IssuedAIK RENOVATION INC05/15/2025
DOB NOWGeneral ConstructionSigned-offHITE CONSTRUCTION05/15/2025
DOB NOWGeneral ConstructionSigned-offERION SKIFTERI CONSTRUCTI03/10/2025
DOB NOWGeneral ConstructionSigned-offHOME IMPRO SERVS GRP02/27/2025
DOB NOWSuspended ScaffoldSigned-offSTREAMLINE CONSULTANTS NY02/07/2025
DOB NOWMechanical SystemsSigned-offRYLEE MECHANICAL SOLUTION09/19/2024
DOB NOWPlumbingSigned-offWHITESTONE PLUMBING CORP06/20/2024
DOB NOWGeneral ConstructionSigned-offUPSTRATE INC06/17/2024
DOB NOWGeneral ConstructionPermit IssuedAIK RENOVATION INC05/06/2024
DOB NOWGeneral ConstructionSigned-offNEST BUILDERS CORP07/26/2023
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL07/14/2023
DOB NOWMechanical SystemsSigned-offDONNELLY MECHANICAL CORP07/08/2023
DOB NOWGeneral ConstructionPermit IssuedAIK RENOVATION INC05/23/2023
DOB NOWPlumbingSigned-offSUN MECHANICAL CORP05/04/2023
DOB NOWGeneral ConstructionSigned-offJP GC AND CONSTRUCTION03/31/2023
DOB NOWPlumbingSigned-offEVERYDAY MECHANICAL CORP03/30/2023
DOB NOWGeneral ConstructionSigned-offJAB INDUSTRIES INC10/27/2022
DOB NOWMechanical SystemsSigned-offJAB INDUSTRIES INC10/21/2022
DOB NOWGeneral ConstructionSigned-offHOME DESIGN GROUP NYC LLC08/09/2022
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC08/02/2022
DOB NOWGeneral ConstructionSigned-offNEST BUILDERS CORP07/29/2022
DOB NOWGeneral ConstructionSigned-offNEST BUILDERS CORP07/28/2022
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL07/27/2022
DOB NOWMechanical SystemsSigned-offJAB INDUSTRIES INC07/26/2022
DOB NOWGeneral ConstructionSigned-offJAB INDUSTRIES INC07/26/2022
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC02/22/2022
DOB NOWMechanical SystemsSigned-offLYTER GROUP INC09/10/2021
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC08/09/2021
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC07/12/2021
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC06/21/2021
+ 60 more permits on file
▾Field Inspections (DOB CAP) — 28
DateTypeResultReport
06/23/2026Fail-Final CND-Occupancy InspectionFailView ↗
03/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/15/2026Pass-Final General Construction Non-Directive 14PassView ↗
11/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/17/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/11/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/11/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/11/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/17/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/10/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/05/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
Latest 25 of 28.
▾Special Inspection Requirements (DOB NOW) — 106
DateRequirementInspectorRole
07/22/2026Fire-Resistant Penetrations and Joints—special
07/22/2026HVAC-R and service water heating equipment—energy_progress
07/22/2026HVAC-R and service water heating system controls—energy_progress
07/22/2026HVAC-R and service water piping design and insulation—energy_progress
07/22/2026Maintenance information—energy_progress
07/22/2026Energy Code Compliance Inspections—progress
07/22/2026Tenant Protection Plan Compliance—special
07/07/2026Final—progress
07/07/2026Interior lighting power—energy_progress
07/07/2026Lighting controls—energy_progress
07/07/2026Tenant Protection Plan Compliance—special
07/07/2026Energy Code Compliance Inspections—progress
05/20/2026HVAC-R and service water piping design and insulationRichard FURMANenergy_progress
05/20/2026HVAC-R and service water heating system controlsRichard FURMANenergy_progress
05/20/2026Fire-Resistant Penetrations and JointsEugene Khananovspecial
04/21/2026Fire-Resistant Penetrations and JointsEVAN PARGANOSspecial
04/21/2026Fire-Resistance Rated ConstructionEVAN PARGANOSprogress
04/09/2026Tenant Protection Plan ComplianceEVAN PARGANOSspecial
04/09/2026FinalEVAN PARGANOSprogress
03/23/2026Interior lighting powerSteven Cummingsenergy_progress
03/23/2026Lighting in dwelling unitsSteven Cummingsenergy_progress
03/23/2026Post-installed AnchorsSteven Cummingsspecial
03/23/2026FinalSteven Cummingsprogress
03/06/2026HVAC-R and service water piping design and insulationRichard FURMANenergy_progress
03/06/2026Fire-Resistant Penetrations and JointsEugene Khananovspecial
Latest 25 of 106.
▾Documents — 4,934 on file (BIS + DOB NOW)
▸Plans & Drawings54
▸DOB NOWPlans/Sketch46
09/04/2026M00474070-I1Request digital key ↗
09/03/2026M00477864-P1Request digital key ↗
09/03/2026M00477864-I1Request digital key ↗
Showing 3 of 46 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/04/2026M00303361-I1Request digital key ↗
09/04/2026M00210723-P1Request digital key ↗
08/15/2026M00303361-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/03/2026M00303338-P1Request digital key ↗
09/03/2026M00303338-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00474070-I1Request digital key ↗
▸Applications & Permits1,166
▸BISWORK PERMIT APPLICATION665
10/28/2021120410153Open ↗
10/25/2021123899497Open ↗
12/23/2020122756570Open ↗
Showing 3 of 665 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION494
02/12/2026110104761Open ↗
11/12/2025110168693Open ↗
11/05/2025110168693Open ↗
Showing 3 of 494 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISTAX LOT- TENTATIVE LOT NUMBER ISSUED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications1,154
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION651
04/06/2020123709264Open ↗
04/06/2020123709264Open ↗
03/13/2020123709264Open ↗
Showing 3 of 651 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM169
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 169 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST164
02/05/2020123703983Open ↗
11/19/2019120410153Open ↗
Showing 2 of 164 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature51
09/04/2026M00474070-I1Open ↗
09/04/2026M00210723-I1Open ↗
09/04/2026M00210723-P1Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWProgress Inspector Seal & Signature39
09/02/2026M01296011-P1Open ↗
09/02/2026M01296011-P1Open ↗
09/02/2026M01296011-I1Open ↗
Showing 3 of 39 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT35
02/05/2020123703983Open ↗
11/19/2019120410153Open ↗
Showing 2 of 35 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature35
09/02/2026M01296011-I1Open ↗
09/01/2026M01151233-P1Open ↗
09/01/2026M00477864-P1Open ↗
Showing 3 of 35 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment527
▸BISSELF-CERT PLUMBING NOTICE238
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 238 on file for this type
▸BISSCHEDULE B - PLUMBING211
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 211 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE60
11/19/2019120410153Open ↗
11/19/2019120410153Open ↗
09/26/2019123364180Open ↗
Showing 3 of 60 on file for this type
▸BISSPRINKLER INSP REPORT : FP-855
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
11/22/2024101152306Open ↗
Showing 1 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
05/28/2020140582590Open ↗
▸Safety & Tenant Protection30
▸BISTenant Protection Plan and Notes22
02/13/2020123703983Open ↗
02/05/2020123703983Open ↗
11/19/2019120410153Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWTenant Protection Plan7
09/04/2026M00210723-P1Open ↗
09/03/2026M00303338-I1Open ↗
09/03/2026M00303338-P1Open ↗
Showing 3 of 7 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos300
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'172
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 172 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)86
02/05/2020123703983Open ↗
09/13/2019123817842Open ↗
Showing 2 of 86 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report38
09/04/2026M00474070-I1Open ↗
09/04/2026M00210723-P1Open ↗
09/03/2026M00516927-I1Open ↗
Showing 3 of 38 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance282
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS165
04/06/2020123709264Open ↗
03/13/2020123709264Open ↗
02/13/2020123703983Open ↗
Showing 3 of 165 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS68
07/22/2021123703983Open ↗
05/07/2021123817842Open ↗
04/06/2020123709264Open ↗
Showing 3 of 68 on file for this type
▸BISTR8: Energy Code Progress Inspections20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISTECHNICAL REPORT: ENERGY19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
07/22/2021123703983Open ↗
06/03/2021120410153Open ↗
05/07/2021123817842Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports29
▸BISTECHNICAL REPORT: RESPONSIBILITY27
02/11/2026110104761Open ↗
12/22/2025110168693Open ↗
12/22/2025110168693Open ↗
Showing 3 of 27 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs367
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST141
12/22/2025110168693Open ↗
11/07/2025120219977Open ↗
11/16/2021120410153Open ↗
Showing 3 of 141 on file for this type
▸BISADMINISTRATIVE OBJECTIONS136
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 136 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION76
10/25/2021123899497Open ↗
04/06/2020123709264Open ↗
03/13/2020123709264Open ↗
Showing 3 of 76 on file for this type
▸BISSUPERSEDING LETTER12
10/25/2021123899497Open ↗
06/17/2020123899497Open ↗
03/20/2020123899497Open ↗
Showing 3 of 12 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership509
▸BISCOST AFFIDAVIT401
02/11/2026110104761Open ↗
10/20/2025120219977Open ↗
11/15/2021120410153Open ↗
Showing 3 of 401 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT100
01/13/2021123817842Open ↗
10/01/2019123817842Open ↗
Showing 2 of 100 on file for this type
▸BISDEPT OF FINANCE VERIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
12/09/2025110168693Open ↗
11/06/2025120219977Open ↗
06/03/2021120410153Open ↗
▸Filing & Intake Forms423
▸BISEFILING COVER SHEET213
02/05/2020123703983Open ↗
09/13/2019123817842Open ↗
Showing 2 of 213 on file for this type
▸BISADDITIONAL INFORMATION118
02/04/2026110104761Open ↗
05/28/2020140582590Open ↗
11/19/2019120410153Open ↗
Showing 3 of 118 on file for this type
▸BISBOROUGH INTAKE FORM54
10/28/2021120410153Open ↗
10/25/2021123899497Open ↗
06/17/2020123899497Open ↗
Showing 3 of 54 on file for this type
▸BISeFiling Job Application Cover Sheet38
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 38 on file for this type
▸Other Documents76
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION54
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 54 on file for this type
▸DOB NOWDHCR Document9
09/04/2026M00210723-P1Open ↗
09/03/2026M00303338-I1Open ↗
08/15/2026M00210723-I1Open ↗
Showing 3 of 9 on file for this type
▸BISSupporting Document: Fee Exempt8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
08/13/2026M01238584-I1Open ↗
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type