← Back
Two stories - detached, small or mid-size
300 COMBS AVENUE
STATEN ISLAND · BIN 5060089
💬 Discuss this project
1955Year Built
2Stories
A1Building Class
R2Zoning
2,755 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,120 sf lot · 0.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Floor 39p · 3 filings · 20 docs
Floor 26p · 2 filings · 20 docs
Floor 18p · 2 filings · 20 docs
1 job · most recent 08/22/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/22/2024Signed-offSUPERIOR PLUMBING & HEATIGas, Storm, Water/Sanitary
4 jobs · most recent 12/23/2024
General Wiring
FiledStatusContractorScope
12/23/2024CompleteS.T.K. ELECTRICAL CORP.General Wiring
12/04/2024CompleteSUNRUN SOLAR ELECTL CORP—
05/28/2024CompleteS.T.K. ELECTRICAL CORP.1 meters
12/14/2017CompleteS.J.G. ELECTRICAL CONTNG1 meters
Building Lifecycle
All (86)Filed (12)Permit Issued (11)Signed Off (8)Inspection (15)Objection (10)Special Inspection (30)
07/30/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/01/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/17/2025
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME.
S00945913-I1
06/12/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/06/2025
Signed off — Alteration
S00974180-I1
06/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
06/03/2025
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
06/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
06/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
06/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
06/03/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
06/03/2025
Special inspection requirement — Final
anthony santoro
06/03/2025
Special inspection requirement — Mechanical Systems
anthony santoro
06/03/2025
Special inspection requirement — Heating Systems
anthony santoro
05/27/2025
Filed — Alteration
S00974180-P1
05/23/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
ASSOCIATED PLUMBING IN CONJUNCTION WITH ALTERATION APPLICATION
S00983930-S6
04/28/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/31/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
ASSOCIATED PLUMBING IN CONJUNCTION WITH ALTERATION APPLICATION
S00983930-S4
03/31/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
ASSOCIATED PLUMBING IN CONJUNCTION WITH ALTERATION APPLICATION
S00983930-S5
03/25/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
ASSOCIATED PLUMBING IN CONJUNCTION WITH ALTERATION APPLICATION
S00983930-S1
03/25/2025
Permit issued — Plumbing
S00945913-I1-PL
03/21/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/18/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01148102-I1
01/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
01/21/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
01/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
01/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
01/21/2025
Special inspection requirement — Final
Walid Abdulla
01/17/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01148102-P1
01/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
01/16/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
01/16/2025
Special inspection requirement — Final
Walid Abdulla
01/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
01/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
01/10/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/20/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
ASSOCIATED PLUMBING IN CONJUNCTION WITH ALTERATION APPLICATION
S00983930-S2
12/20/2024
Permit issued — Curb Cut
S00983930-S6-CC
12/20/2024
Permit issued — Mechanical Systems
S00974180-I1-MS
12/09/2024
Permit issued — Solar
S01148102-I1-SL
12/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/04/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01148102-I1
10/30/2024
Permit issued — General Construction
S00983930-I1-GC
10/01/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/23/2024
Objection resolved — Addressed
09/23/2024
Objection resolved — Addressed
09/23/2024
Objection resolved — Addressed
09/19/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/17/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/17/2024
Objection resolved — Addressed
09/15/2024
Objection resolved — Addressed
09/10/2024
Objection raised — Other
09/10/2024
Objection raised — Other
09/10/2024
Objection raised — Other
09/10/2024
Objection raised — Other
09/10/2024
Objection raised — Other
09/09/2024
Filed — Alteration
S00974180-I1
08/22/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
ASSOCIATED PLUMBING IN CONJUNCTION WITH ALTERATION APPLICATION
S00983930-S6
08/19/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
Latest 60 of 86 events.
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CHRIS PONISI ARCHITECT603/21/2026
DAWN PONISI403/21/2026
APRILE BONAMO FILING REP203/21/2026
A TECH ENGINEERING NYC203/21/2026
SUNRUN203/21/2026
PATRICIA L. GASS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A. FONTANA & SONS LLCGeneral Contractor1307/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
S.T.K. ELECTRICAL CORP.Electrical103/22/2026
PRESTIGE PLBG & HTG INCFire Protection107/08/2026
RJ BRUNO INCPlumbing107/08/2026
SUPERIOR PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738705/27/2025
PARKER AND WEST ENGINEERI5272201/17/2025
LEONID KRUPNIK, PE6710203/13/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offRJ BRUNO INC03/25/2025
DOB NOWCurb CutSigned-offA. FONTANA & SONS LLC12/20/2024
DOB NOWMechanical SystemsSigned-offA. FONTANA & SONS LLC12/20/2024
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC12/09/2024
DOB NOWGeneral ConstructionPermit IssuedA. FONTANA & SONS LLC10/30/2024
DOB NOWPlumbingSigned-offRJ BRUNO INC06/25/2024
DOB NOWFoundationSigned-offA. FONTANA & SONS LLC05/15/2024
DOB NOWStructuralSigned-offA. FONTANA & SONS LLC05/14/2024
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING & HEATI04/16/2024
DOB NOWGeneral ConstructionPermit IssuedA. FONTANA & SONS LLC04/01/2024
DOB NOWConstruction FenceSigned-offA. FONTANA & SONS LLC03/29/2024
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
07/30/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/01/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/28/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
03/21/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/17/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/01/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/01/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
06/03/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
06/03/2025Duct leakage testing, insulation and designanthony santoroenergy_progress
06/03/2025HVAC-R and service water piping design and insulationanthony santoroenergy_progress
06/03/2025HVAC-R and service water heating equipmentanthony santoroenergy_progress
06/03/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
06/03/2025Energy Code Compliance Inspectionsanthony santoroprogress
06/03/2025Finalanthony santoroprogress
06/03/2025Mechanical Systemsanthony santorospecial
06/03/2025Heating Systemsanthony santorospecial
01/21/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
01/21/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
01/21/2025Energy Code Compliance InspectionsWalid Abdullaprogress
01/21/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
01/21/2025FinalWalid Abdullaprogress
01/16/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
01/16/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
01/16/2025FinalWalid Abdullaprogress
01/16/2025Energy Code Compliance InspectionsWalid Abdullaprogress
01/16/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/19/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
08/19/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
08/19/2024Fire-Resistant Penetrations and Jointsanthony santorospecial
08/19/2024Subsurface Investigations (Borings/Test Pits)anthony santorospecial
08/19/2024Energy Code Compliance Inspectionsanthony santoroprogress
03/25/2024Structural Stability – Alterations of existing buildingsLeonid Krupnikspecial
Latest 25 of 48.
▾Documents — 89 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/21/2026S00945913-I1Request digital key ↗
08/21/2026S00983930-S2Request digital key ↗
08/21/2026S00983930-S1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
09/21/2023540255668Open ↗
09/21/2023540255668Open ↗
▸BISBPP-16 - Application for waiver of curb alignment and/or sidewalk and curb1
09/21/2023540255668Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00983930-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00983930-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00983930-I1Open ↗
▸Seals & Professional Certifications39
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/21/2026S00983930-S2Open ↗
08/21/2026S00983930-S1Open ↗
08/21/2026S00983930-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/24/2026S01148102-P1Open ↗
09/24/2026S01148102-P1Open ↗
09/24/2026S01148102-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/24/2026S01148102-P1Open ↗
09/24/2026S01148102-P1Open ↗
09/02/2026S00983930-I1Open ↗
Showing 3 of 11 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/22/2023540255668Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/22/2023540255668Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00983930-S3Open ↗
08/13/2026S00983930-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/21/2026S00983930-S1Open ↗
08/21/2026S00983930-I1Open ↗
08/21/2026S00983930-S2Open ↗
Showing 3 of 12 on file for this type
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT3
08/13/2026S00983930-S1Open ↗
08/13/2026S00983930-I1Open ↗
08/13/2026S00983930-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S00983930-S1Open ↗
08/13/2026S00983930-I1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
09/21/2023540255668Open ↗
▸Approvals, Objections & Sign-offs3
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
09/21/2023540255668Open ↗
09/21/2023540255668Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01148102-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
09/22/2023540255668Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/13/2026S00983930-S3Open ↗
08/13/2026S00983930-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00983930-S3Open ↗
08/13/2026S00983930-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
09/21/2023540255668Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00983930-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/21/2026S00983930-I1Open ↗