Evelyn H. Lauder Breast and Imaging Center
300 EAST 66TH STREET · BIN 1044734
💬 Discuss this project
2006Year Built
16Stories
I5Building Class
C2-8Zoning
239,235 sfGross Floor Area
1Units
LL97 Covered0 Active ViolationsFISP: SWARMP
Health center, child center, clinic · Owner of record: S.K.I. Realty · 20,164 sf lot · 11.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 11Chiller and pump installation and replacement1 filing · 2 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6MSKCC BAIC, Burlington58p · 4 filings · 20 docs
Floor 5MSKCC BAIC33p · 1 filing · 20 docs
Floor 4
Floor 3MSKCC BAIC9p · 2 filings · 19 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Memorial Sloan Kettering-1233 YO12210/09/2026
S.K.I. Realty803/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Patti & Anthes Consulting Engineers110/08/2026
AKF Engineers605/14/2025
Efh Architecture104/29/2025
Silman201/22/2024
DLR Group101/25/2023
Jaros Baum & Bolles212/07/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RPO1603/21/2026
Milrose Consultants403/21/2026
DC Turano403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Empire General ContractingGeneral Contractor507/08/2026
Sirina Fire ProtectionPlumbing403/22/2026
Consigli Construction CoGeneral Contractor207/08/2026
Lendlease (US) ConstructionGeneral Contractor207/08/2026
Alliance PlumbingPlumbing207/08/2026
Riehm PlumbingFire Protection207/08/2026
Riehm PlumbingPlumbing107/08/2026
JSK ConstructionGeneral Contractor107/08/2026
Sirina Fire ProtectionFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106205/14/2025
AKF Engineers2751602/05/2024
Atlas ATC Engineering8011201/22/2024
Future Tech Consultants O589212/07/2020
Building Lifecycle
All (134)Filed (13)Permit Issued (14)Signed Off (8)Facade (FISP) (6)Violation (60)Inspection (3)Special Inspection (30)
10/08/2026
Filed — Alteration
Installation of two modular water-cooled chillers. Installation of new hot water and secondary condenser water duty/standby pumps. Removal of existing filtrine MRI chiller and replacement with new plate and frame heat exchanger with associated piping.
M01463125-I1
10/05/2026
Special inspection requirement — Energy Code Compliance Inspections
09/28/2026
Special inspection requirement — Heating Systems
09/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
09/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
09/28/2026
Special inspection requirement — Maintenance information
09/21/2026
Special inspection requirement — Final
09/21/2026
Special inspection requirement — Mechanical Systems
04/07/2026
Signed off — Alteration
Modifications to the Mechanical system on the 6th floor. No change in occupancy, use or egress.
M01177411-S2
03/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/03/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/27/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/05/2026
Signed off — Alteration
Modifications to the Mechanical system on the 6th floor. No change in occupancy, use or egress.
M01177411-S1
02/03/2026
Signed off — Alteration
Modifications to the Mechanical system on the 6th floor. No change in occupancy, use or egress.
M01177411-I1
11/05/2025
Permit issued — Plumbing
M01177411-S2-PL
09/10/2025
Permit issued — Mechanical Systems
M01177411-S1-MS
09/10/2025
Permit issued — General Construction
M01177411-I1-GC
06/16/2025
Permit issued — Sprinklers
M01177411-S2-PL
05/28/2025
Permit issued — Sprinklers
M01177411-S2-EW-SP
05/27/2025
Permit issued — Mechanical Systems
M01177411-S1-MS
05/14/2025
Filed — Alteration
Modifications to the Mechanical system on the 6th floor. No change in occupancy, use or egress.
M01177411-S2
05/08/2025
Filed — Alteration
Modifications to the Mechanical system on the 6th floor. No change in occupancy, use or egress.
M01177411-S1
05/06/2025
Permit issued — General Construction
M01177411-I1-GC
04/29/2025
Filed — Alteration
Modifications to the Mechanical system on the 6th floor. No change in occupancy, use or egress.
M01177411-I1
03/17/2025
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
03/17/2025
Special inspection requirement — Lighting controls
GEORGE GHEBRYAL
03/17/2025
Special inspection requirement — Shutoff dampers
GEORGE GHEBRYAL
03/17/2025
Special inspection requirement — Duct leakage testing, insulation and design
GEORGE GHEBRYAL
03/17/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
03/17/2025
Special inspection requirement — Ventilation and air distribution system
GEORGE GHEBRYAL
03/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
03/17/2025
Special inspection requirement — Interior lighting power
GEORGE GHEBRYAL
02/06/2025
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
02/06/2025
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
02/06/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
02/06/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
03/07/2024
Signed off — Alteration
Mechanical work on the 5th & 6th floors. No change in occupancy, use or egress
M08046352-S2
02/09/2024
Signed off — Alteration
Mechanical work on the 5th & 6th floors. No change in occupancy, use or egress
M08046352-S1
02/05/2024
Filed — Alteration
Mechanical work on the 5th & 6th floors. No change in occupancy, use or egress
M08046352-P1
01/23/2024
Special inspection requirement — Post-installed Anchors
GIORGI KHARDZEISHVILI
01/23/2024
Special inspection requirement — Final
GIORGI KHARDZEISHVILI
01/22/2024
Filed — Alteration
Mechanical work on the 5th & 6th floors. No change in occupancy, use or egress
M08046352-P2
01/09/2024
Signed off — Alteration
Mechanical work on the 5th & 6th floors. No change in occupancy, use or egress
M08046352-I1
07/25/2023
Permit issued — Mechanical Systems
M08046352-S1-MS
06/15/2023
Permit issued — Structural
M08046352-S2-ST
06/15/2023
Permit issued — General Construction
M08046352-I1-GC
03/02/2023
Filed — Alteration
Mechanical work on the 5th & 6th floors. No change in occupancy, use or egress
M08046352-S1
02/15/2023
Filed — Alteration
Mechanical work on the 5th & 6th floors. No change in occupancy, use or egress
M08046352-S2
02/09/2023
Cycle 9 facade report submitted
02/08/2023
Cycle 9 facade report signed — SWARMP
02/01/2023
Cycle 9 facade inspection completed
01/25/2023
Filed — Alteration
Mechanical work on the 5th & 6th floors. No change in occupancy, use or egress
M08046352-I1
12/09/2022
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM BLAIS
12/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM BLAIS
12/09/2022
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
WILLIAM BLAIS
12/09/2022
Special inspection requirement — Sprayed fire-resistant materials
WILLIAM BLAIS
11/29/2022
Special inspection requirement — Final
WILLIAM BLAIS
06/08/2021
Signed off — Alteration
ADDITIONS/ MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00425561-I1
06/08/2021
Signed off — Alteration
ADDITIONS/MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00425584-I1
01/13/2021
Permit issued — Mechanical Systems
M00425561-I1-MS
Latest 60 of 134 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe11/05/2025
DOB NOWMechanical SystemsSigned-offConsigli Construction Co09/10/2025
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co09/10/2025
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe06/16/2025
DOB NOWSprinklersSigned-offSirina Fire Protection05/28/2025
DOB NOWMechanical SystemsSigned-offLendlease (US) Construction05/27/2025
DOB NOWGeneral ConstructionSigned-offLendlease (US) Construction05/06/2025
DOB NOWMechanical SystemsSigned-offEmpire General Contracting07/25/2023
DOB NOWStructuralSigned-offEmpire General Contracting06/15/2023
DOB NOWGeneral ConstructionSigned-offEmpire General Contracting06/15/2023
DOB NOWMechanical SystemsSigned-offJSK Construction01/13/2021
DOB NOWSprinklersSigned-offRiehm Plumbing01/08/2021
DOB NOWPlumbingPermit IssuedRiehm Plumbing05/08/2020
DOB NOWSprinklersPermit IssuedRiehm Plumbing05/08/2020
BISOTISSUEDJSK Construction01/12/2021
BISPLISSUEDGenesis Plumbing and Heating11/21/2017
BISSPISSUEDNonstop Plumbers11/21/2017
BISMHISSUEDJGN Construction11/17/2017
BISOTISSUEDJGN Construction11/17/2017
BISOTISSUEDWesterman Construction Co01/12/2016
BISOTISSUEDWesterman Construction Co01/12/2016
BISEQISSUEDTurner Construction Company10/26/2012
BISSPISSUEDPar Fire Protection03/21/2012
BISPLISSUEDPar Plumbing Co01/05/2012
BISMHISSUEDMichael Anthony Contracting12/20/2011
BISOTISSUEDMichael Anthony Contracting12/20/2011
BIS—ISSUEDTurner Construction Company12/06/2011
BISEQISSUEDTurner Construction Company11/23/2011
BISSPISSUEDPar Fire Protection05/03/2011
BISSPISSUEDPar Fire Protection04/28/2011
BISPLISSUEDPar Plumbing Co04/04/2011
BISPLISSUEDPar Plumbing Co04/04/2011
BISPLISSUEDPar Plumbing Co04/04/2011
BISPLISSUEDPar Plumbing Co04/04/2011
BISPLISSUEDPar Plumbing Co04/04/2011
BISOTISSUEDMichael Anthony Contracting04/01/2011
BISOTISSUEDMichael Anthony Contracting04/01/2011
BISOTISSUEDMichael Anthony Contracting04/01/2011
BISOTISSUEDMichael Anthony Contracting04/01/2011
BISOTISSUEDMichael Anthony Contracting04/01/2011
+ 24 more permits on file
2 projects · most recent 10/08/2026
Heating and Air Conditioning Systems Refrigeration Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/08/2026——Heating and Air Conditioning Systems, Refrigeration Systems
Heat / Cool
Trane MWC/HEAT RECOVERY 3,275,000 BTU · Wshp ×1
Refrigeration
Trane MWC 246 tons · Chiller ×1
04/27/2020——Air Conditioning Systems
Cooling
Stulz COS-042-C-U-EC 42,000 CFM · Crac Unit ×1
1 project · most recent 04/27/2020
FiledStatusContractorScope
04/27/2020Permit IssuedRiehm Plumbing—
1 project · most recent 04/27/2020
Water/Sanitary
FiledStatusContractorScope
04/27/2020Permit IssuedRiehm PlumbingWater/Sanitary
3 projects · most recent 04/03/2026
General Wiring
FiledStatusContractorScope
04/03/2026On Hold - Returned CheckSwitch Electric of the FiveGeneral Wiring
11/17/2025CompleteNJS Electrical ServicesGeneral Wiring
03/31/2020CompleteE-J Electric Installation CoGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/03/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
10/05/2026Energy Code Compliance Inspections—progress
09/28/2026Heating Systems—special
09/28/2026HVAC-R and service water heating system controls—energy_progress
09/28/2026HVAC-R and service water piping design and insulation—energy_progress
09/28/2026Maintenance information—energy_progress
09/21/2026Final—progress
09/21/2026Mechanical Systems—special
03/17/2025Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
03/17/2025Lighting controlsGEORGE GHEBRYALenergy_progress
03/17/2025Shutoff dampersGEORGE GHEBRYALenergy_progress
03/17/2025Duct leakage testing, insulation and designGEORGE GHEBRYALenergy_progress
03/17/2025Post-installed AnchorsGEORGE GHEBRYALspecial
03/17/2025Ventilation and air distribution systemGEORGE GHEBRYALenergy_progress
03/17/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
03/17/2025Interior lighting powerGEORGE GHEBRYALenergy_progress
02/06/2025Sprinkler SystemsGEORGE GHEBRYALspecial
02/06/2025Mechanical SystemsGEORGE GHEBRYALspecial
02/06/2025FinalGEORGE GHEBRYALprogress
02/06/2025FinalGEORGE GHEBRYALprogress
01/23/2024Post-installed AnchorsGIORGI KHARDZEISHVILIspecial
01/23/2024FinalGIORGI KHARDZEISHVILIprogress
12/09/2022Energy Code Compliance InspectionsWILLIAM BLAISprogress
12/09/2022Fire-Resistant Penetrations and JointsWILLIAM BLAISspecial
12/09/2022Mastic and Intumescent Fire-resistant CoatingsWILLIAM BLAISspecial
12/09/2022Sprayed fire-resistant materialsWILLIAM BLAISspecial
Latest 25 of 45.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
MSKCC BAICMedical / HealthcareFloors 3, 5, 6
Project M01177411 Alteration · LOC Issued · 04/29/2025
Project M08046352 Alteration · LOC Issued · 01/25/2023
Project M00425561 Alteration · LOC Issued · 12/07/2020
Project M00425584 Alteration · LOC Issued · 12/07/2020
BurlingtonRetailFloor 6
Project M00342652 Alteration · Approved · 04/27/2020
Project M00342917 Alteration · Permit Entire · 04/27/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 615 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch8
08/28/2026M08046352-P1Request digital key ↗
08/28/2026M08046352-I1Request digital key ↗
08/28/2026M08046352-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/05/2026M00342917-I1Request digital key ↗
09/04/2026M00425584-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00342652-I1Request digital key ↗
09/04/2026M00425561-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00342917-I1Request digital key ↗
▸Applications & Permits126
▸BISPLAN / WORK APPROVAL APPLICATION85
12/04/2020140976246Open ↗
09/29/2020123837205Open ↗
08/29/2020123837205Open ↗
Showing 3 of 85 on file for this type
▸BISWORK PERMIT APPLICATION39
01/12/2021140976246Open ↗
11/21/2017123341972Open ↗
11/21/2017123341972Open ↗
Showing 3 of 39 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1132
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications146
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION89
03/11/2020123837205Open ↗
02/04/2019123341972Open ↗
07/09/2018123341972Open ↗
Showing 3 of 89 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/27/2026M08046352-S2Open ↗
08/27/2026M01177411-S1Open ↗
08/27/2026M01177411-S1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
10/13/2026M01463125-I1Open ↗
09/05/2026M00342652-I1Open ↗
08/28/2026M08046352-S2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/27/2026M08046352-S2Open ↗
09/25/2026M00342917-I1Open ↗
09/25/2026M00342917-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
11/09/2017123341972Open ↗
08/20/2014122099362Open ↗
12/15/2011120923705Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
12/04/2020140976246Open ↗
11/09/2017123341972Open ↗
11/09/2017123341972Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
12/15/2011120923705Open ↗
Showing 1 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/04/2020140976246Open ↗
▸Trade Schedules & Equipment78
▸BISSCHEDULE B - PLUMBING38
01/27/2012120923723Open ↗
01/17/2012120923723Open ↗
01/09/2012120923723Open ↗
Showing 3 of 38 on file for this type
▸BISSELF-CERT PLUMBING NOTICE25
04/23/2012120923723Open ↗
04/18/2012120923705Open ↗
03/08/2012120463444Open ↗
Showing 3 of 25 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA8
03/11/2020123249751Open ↗
02/06/2020123249751Open ↗
09/30/2013120923732Open ↗
Showing 3 of 8 on file for this type
▸BISSPRINKLER INSP REPORT : FP-856
11/17/2011120464639Open ↗
10/21/2011120466110Open ↗
10/20/2011120463444Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
11/09/2017123341972Open ↗
▸Environmental & Asbestos51
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/05/2026M00342652-I1Open ↗
08/28/2026M08046352-S1Open ↗
08/28/2026M08046352-P2Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
12/15/2011120923732Open ↗
12/15/2011120923723Open ↗
12/15/2011120923705Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
12/04/2020140976246Open ↗
03/11/2020123837205Open ↗
11/09/2017123341972Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
03/11/2020123837205Open ↗
02/04/2019123341972Open ↗
07/09/2018123341972Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
05/21/2021140976246Open ↗
01/12/2021140976246Open ↗
09/09/2020123837205Open ↗
▸BISTECHNICAL REPORT: ENERGY2
12/22/2011120923705Open ↗
12/15/2011120923705Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
05/21/2021140976246Open ↗
08/10/2018123341972Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/04/2020140976246Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY7
12/04/2020140976246Open ↗
12/04/2020140976246Open ↗
09/09/2020123837205Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
02/04/2019123341972Open ↗
▸Approvals, Objections & Sign-offs56
▸BISADMINISTRATIVE OBJECTIONS22
12/15/2011120923732Open ↗
12/15/2011120923723Open ↗
12/15/2011120923705Open ↗
Showing 3 of 22 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST21
10/24/2025140976246Open ↗
03/11/2020123249751Open ↗
02/04/2019123341972Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
10/13/2026M01463125-I1Open ↗
09/05/2026M00342652-I1Open ↗
08/28/2026M08046352-I1Open ↗
Showing 3 of 13 on file for this type
▸Cost, Insurance & Ownership60
▸BISCOST AFFIDAVIT59
10/24/2025140976246Open ↗
12/04/2020140976246Open ↗
09/09/2020123837205Open ↗
Showing 3 of 59 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
03/11/2020123837205Open ↗
▸Filing & Intake Forms55
▸BISEFILING COVER SHEET38
03/11/2020123837205Open ↗
12/21/2018123249751Open ↗
11/09/2017123341972Open ↗
Showing 3 of 38 on file for this type
▸BISADDITIONAL INFORMATION8
09/09/2020123837205Open ↗
Showing 1 of 8 on file for this type
▸BISBOROUGH INTAKE FORM5
03/11/2020123249751Open ↗
02/04/2019123341972Open ↗
08/10/2018123341972Open ↗
Showing 3 of 5 on file for this type
▸BISeFiling Job Application Cover Sheet4
12/04/2020140976246Open ↗
Showing 1 of 4 on file for this type
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
08/19/2014122099362Open ↗
Showing 1 of 6 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type