| Owner | Filings | Most Recent |
|---|---|---|
| BROOKFIELD PROPERTIES OP BY CBRE | 10 | 09/13/2026 |
| 300 MADISON AVENUE | 157 | 07/08/2026 |
| BROOKFIELD PROPERTIES | 25 | 07/08/2026 |
| BFP 300 MADISON II | 594 | 07/08/2026 |
| BFP 300 MADISON II LL | 6 | 03/22/2026 |
| INC PAV-LAK CONTRACTING | 1 | 03/22/2026 |
| BROOFIELD FINANCIAL PROPERTIES | 120 | 03/22/2026 |
| TURNER CONSTRUCTION | 5 | 03/22/2026 |
| BFP 300 MADISON | 44 | 03/22/2026 |
| BFP 300 MADSION II LLC | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| M-ENGINEERING NEW YORK, LLC | 2 | 07/20/2026 |
| BERGMEYER ARCHITECTURAL PC | 2 | 07/17/2026 |
| WSP | 19 | 07/06/2026 |
| VOCON | 9 | 05/13/2026 |
| SUPERSTRUCTURES ENG. + ARCH. | 3 | 04/14/2026 |
| NELSON ARCHITECTURE &INTERIORS, INC | 3 | 09/04/2024 |
| INTERIOR ARCHITECTS | 7 | 09/03/2024 |
| ROBERT DERECTOR ASSOCIATES | 16 | 08/21/2024 |
| HALSEY MCCORMACK HELMER INC | 1 | 11/20/2023 |
| GILSANZ MURRAY STEFICEK LLP | 3 | 04/05/2023 |
| AKFENGINEERS LLP | 17 | 02/27/2023 |
| SYSKA HENNESSY GROUP | 12 | 02/16/2023 |
| TED MOUDIS ASSOCIATES | 3 | 01/09/2023 |
| TPG ARCHITECTURE, LLP | 3 | 11/29/2022 |
| POWER CONTINUUM ENGINEERING, DPC | 3 | 10/14/2021 |
| NIEGO ASSOCIATES | 1 | 09/04/2019 |
| HC ARCHITECT, PC | 1 | 04/23/2018 |
| RYAN SOAMES ENGINEERING | 1 | — |
| Representative | Filings | Most Recent |
|---|---|---|
| OUTSOURCE CONSULTANTS, INC. | 82 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 60 | 03/21/2026 |
| BURNHAM NATIONWIDE INC | 6 | 03/21/2026 |
| EMPIRE CITY CONSULTANTS, INC. | 8 | 03/21/2026 |
| NEW YORK SIGN CONSULTANTS | 2 | 03/21/2026 |
| JP EXPEDITE | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| STRUCTURE TONE, LLC | General Contractor | 35 | 07/08/2026 |
| AMERICON CONSTRUCTION INC. | General Contractor | 14 | 07/08/2026 |
| BENCHMARK BUILDERS LLC | General Contractor | 13 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 9 | 07/08/2026 |
| LAB PLBG & HTG CO INC | Plumbing | 7 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 7 | 07/08/2026 |
| TURNER CONSTRUCTION COMPANY | General Contractor | 7 | 07/08/2026 |
| OMARA ORGANIZATION INC | General Contractor | 5 | 07/08/2026 |
| TRISTATE PLBG SVCS CORP | Plumbing | 4 | 07/08/2026 |
| AGGRESSIVE FIRE PROT LLC | Fire Protection | 4 | 07/08/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 3 | 07/08/2026 |
| M&T PLBG AND HTG CO., INC | Plumbing | 3 | 07/08/2026 |
| PACE PLUMBING CORP | Plumbing | 3 | 07/08/2026 |
| PAR PLUMBING CO., INC | Plumbing | 3 | 07/08/2026 |
| AGGRESSIVE FIRE PROT | Plumbing | 3 | 03/22/2026 |
| HARBOUR MECHANICAL CORP | General Contractor | 2 | 03/21/2026 |
| PACE PLUMBING CORP | Fire Protection | 2 | 07/08/2026 |
| EYSEL, ROBERT | Electrical | 2 | 03/21/2026 |
| VELASCO ORELLANA, ORLANDO | Electrical | 2 | 03/21/2026 |
| SHAWMUT WOODWORKING & SUPPLY | General Contractor | 2 | 03/21/2026 |
| MAUCERI SIGN | Scaffold | 1 | 07/08/2026 |
| FOLEY JOHN | Electrical | 1 | 03/21/2026 |
| HERRERA ABANTO, DILVER | Electrical | 1 | 03/21/2026 |
| HOWARD WEISS | Electrical | 1 | 03/21/2026 |
| JOHN FOLEY | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| AK ENGINEERING PC | 678 | 15 | 07/06/2026 |
| ENGINEERING BUILDING SERV | 7303 | 6 | 12/10/2025 |
| OUTSOURCE SPECIAL INSPECT | 2827 | 32 | 11/03/2025 |
| SKYLINE ENGINEERING, PLLC | 267 | 24 | 09/03/2024 |
| MILROSE CONSULTANTS LLC | 2003 | 6 | 02/29/2024 |
| MANCINI DUFFY ARCHITECTUR | 2985 | 1 | 11/20/2023 |
| PROJECTIVE INC. | 6820 | 4 | 10/14/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Signed-off | DUO PLUMBING & HTG CORP. | 07/07/2026 |
| DOB NOW | General Construction | Permit Issued | STEADFAST DEVELOPMENT AND | 06/30/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 05/14/2026 |
| DOB NOW | Structural | Permit Issued | STRUCTURE TONE, LLC | 04/16/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 04/14/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 04/14/2026 |
| DOB NOW | Sprinklers | Permit Issued | PREFERRED SPKLR AND MECH | 04/13/2026 |
| DOB NOW | Plumbing | Permit Issued | LAB PLBG & HTG CO INC | 04/13/2026 |
| DOB NOW | Mechanical Systems | Signed-off | OMARA ORGANIZATION INC | 12/12/2025 |
| DOB NOW | Mechanical Systems | Signed-off | AMERICON CONSTRUCTION INC. | 11/20/2025 |
| DOB NOW | Sprinklers | Signed-off | AGGRESSIVE FIRE PROT LLC | 11/18/2025 |
| DOB NOW | General Construction | Signed-off | AMERICON CONSTRUCTION INC. | 11/06/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | AMERICON CONSTRUCTION INC. | 10/02/2025 |
| DOB NOW | Sprinklers | Signed-off | AGGRESSIVE FIRE PROT LLC | 09/25/2025 |
| DOB NOW | Plumbing | Signed-off | TRISTATE PLBG SVCS CORP | 09/23/2025 |
| DOB NOW | General Construction | Signed-off | AMERICON CONSTRUCTION INC. | 09/22/2025 |
| DOB NOW | Sprinklers | Signed-off | AGGRESSIVE FIRE PROT LLC | 08/06/2025 |
| DOB NOW | Plumbing | Signed-off | TRISTATE PLBG SVCS CORP | 07/31/2025 |
| DOB NOW | Mechanical Systems | Signed-off | AMERICON CONSTRUCTION INC. | 07/31/2025 |
| DOB NOW | General Construction | Signed-off | AMERICON CONSTRUCTION INC. | 07/28/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 06/26/2025 |
| DOB NOW | Sprinklers | Signed-off | ABCO-PEERLESS SPRKLR CORP | 06/26/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 06/20/2025 |
| DOB NOW | Structural | Permit Issued | OMARA ORGANIZATION INC | 09/09/2024 |
| DOB NOW | Sprinklers | Signed-off | MORA FIRE PROTECTION LLC | 07/17/2024 |
| DOB NOW | Mechanical Systems | Signed-off | OMARA ORGANIZATION INC | 04/23/2024 |
| DOB NOW | General Construction | Signed-off | OMARA ORGANIZATION INC | 04/15/2024 |
| DOB NOW | Sprinklers | Signed-off | MANENGEERING BUREAU, INC | 03/07/2024 |
| DOB NOW | Plumbing | Signed-off | SIRINA FIRE PROT CORP | 03/06/2024 |
| DOB NOW | Sprinklers | Signed-off | SIRINA FIRE PROT CORP | 02/27/2024 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 02/22/2024 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 02/22/2024 |
| DOB NOW | General Construction | Signed-off | SHAWMUT WOODWORKING & SUPPLY | 11/24/2023 |
| DOB NOW | Standpipe | Signed-off | LAB PLBG & HTG CO INC | 06/01/2023 |
| DOB NOW | Structural | Signed-off | STRUCTURE TONE, LLC | 04/06/2023 |
| DOB NOW | Standpipe | Signed-off | LAB PLBG & HTG CO INC | 02/27/2023 |
| DOB NOW | Sprinklers | Signed-off | SIRINA FIRE PROT CORP | 02/24/2023 |
| DOB NOW | Plumbing | Signed-off | SIRINA FIRE PROT CORP | 02/24/2023 |
| DOB NOW | Plumbing | Signed-off | PACE PLUMBING CORP | 02/17/2023 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 02/16/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/06/2026 | Permit Issued | STRUCTURE TONE, LLC | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Titus DTFS-F 35,300 BTU · Fan Powered Box ×14 Iec HPY14 33,168 BTU · Fan Coil Indoor ×3 HPY20 55,007 BTU · Fan Coil Indoor ×2 HPY12 29,317 BTU · Fan Coil Indoor ×1 Vertiv DME044C 24,800 BTU · Crac Unit ×2 Ventilation Loren Cook SQN-D VF 1,550 CFM · Exhaust Fan ×2 |
| 11/03/2025 | Signed-off | AMERICON CONSTRUCTION INC | Others | Other N/A NA 1 BTU ×1 |
| 10/01/2025 | Permit Issued | AMERICON CONSTRUCTION INC | Air Conditioning Systems | Cooling Vertiv DME044C-PC7S569 1,200 CFM · Crac Unit ×2 |
| 06/23/2025 | Permit Issued | STRUCTURE TONE, LLC | Ventilation Systems | Ventilation N/A N/A 1 BTU ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/06/2026 | Permit Issued | PREFERRED SPKLR AND MECH | — |
| 10/01/2025 | Signed-off | AGGRESSIVE FIRE PROT LLC | Sprinkler System |
| 06/23/2025 | Signed-off | ABCO-PEERLESS SPRKLR CORP | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/20/2026 | Signed-off | DUO PLUMBING & HTG CORP. | Water/Sanitary |
| 07/06/2026 | Permit Issued | LAB PLBG & HTG CO INC | Water/Sanitary |
| 10/01/2025 | Signed-off | TRISTATE PLBG SVCS CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/07/2026 | Permit Issued | SRM ELECTRICAL SVC INC | General Wiring |
| 06/26/2026 | Complete | P.E. STONE INC | General Wiring |
| 04/10/2026 | Permit Issued | UNI-LITE ELECTRIC, LLC | General Wiring |
| 03/17/2026 | Complete | P.E. STONE INC | General Wiring |
| 11/17/2025 | Complete | P.E. STONE INC | General Wiring |
| 11/07/2025 | Permit Issued | FOREST ELECTRIC CORP. | General Wiring |
| 03/19/2025 | Permit Issued | ATLAS-ACON ELEC. SERVICE | 2 meters |
| 09/30/2024 | Complete | UNI-LITE ELECTRIC, LLC | General Wiring |
| 09/26/2024 | Complete | P.E. STONE INC | — |
| 07/07/2023 | Complete | UNI-LITE ELECTRIC, LLC | General Wiring |
| 07/06/2023 | Permit Issued | M.C. ELECTRICAL NY INC | General Wiring |
| 11/30/2022 | Complete | CAMPBELL & DAWES LTD ELEC | General Wiring |
| 11/21/2022 | Complete | POLO ELECTRIC CORP. D/B/A | General Wiring |
| 10/13/2022 | Complete | CAMPBELL & DAWES LTD ELEC | General Wiring |
| 09/27/2022 | Complete | CAMPBELL & DAWES LTD ELEC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/06/2026 | Permit Issued | STRUCTURE TONE, LLC | Steel |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/11/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/05/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/09/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/30/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/24/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/19/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/19/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/09/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/09/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/14/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/08/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/08/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/26/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/21/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/07/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/27/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/29/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/29/2024 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 07/31/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/25/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/25/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/29/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/29/2024 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 04/16/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/16/2024 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/17/2026 | Final | KEVIN SNEDEKER | progress |
| 07/08/2026 | Final | KEVIN SNEDEKER | progress |
| 07/06/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 06/03/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 04/08/2026 | Seismic Isolation Systems | Ari Kamo | special |
| 04/08/2026 | Sprayed fire-resistant materials | Ari Kamo | special |
| 04/08/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 04/06/2026 | Structural Steel - High Strength Bolting | Ari Kamo | special |
| 04/06/2026 | Structural Steel - Details | Ari Kamo | special |
| 04/06/2026 | Post-installed Anchors | Ari Kamo | special |
| 04/06/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 04/06/2026 | Structural Steel - Welding | Ari Kamo | special |
| 03/18/2026 | Public Assembly Emergency Lighting | Ari Kamo | progress |
| 03/17/2026 | Sprinkler Systems | Ari Kamo | special |
| 03/17/2026 | Final | Ari Kamo | progress |
| 03/13/2026 | Final | Ari Kamo | progress |
| 03/13/2026 | Fire-Resistance Rated Construction | Ari Kamo | progress |
| 02/23/2026 | Fire-Resistance Rated Construction | Ari Kamo | progress |
| 10/31/2025 | Fire-Resistance Rated Construction | JONAR MADRIAGA | progress |
| 10/31/2025 | Lighting controls | JONAR MADRIAGA | energy_progress |
| 10/31/2025 | Interior lighting power | JONAR MADRIAGA | energy_progress |
| 10/24/2025 | Final | JONAR MADRIAGA | progress |
| 10/24/2025 | Sprinkler Systems | JONAR MADRIAGA | special |
| 10/24/2025 | Mechanical Systems | JONAR MADRIAGA | special |
| 10/22/2025 | Final | JONAR MADRIAGA | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| PricewaterhouseCoopers | Office | Floors 12, 24, 35 | Project M01371673 Project M01361173 Project M01306727 Project M01236514 |
| CIBC | Office | Sub-cellar, Cellar, Floors 2–6 | Project M01325106 Project M01085764 Project M01030138 Project M01030151 Project M01030059 Project M00849483 |
| Nielsen | Office | Floor 6 | Project M08006781 |
| Corporate Finance & Forensic Lab | Office | Floors 13, 14 | Project M00773725 Project M00773729 |
| PwC | Office | Floors 13, 14 | Project M00778442 |
| North Western Mutual | Office | Floors 25, 26 | Project M00677742 Project M00677748 Project M00677751 |