← Back
Office only, 1 story
300 MANOR ROAD
STATEN ISLAND · Westerleigh-Castleton Corners · BIN 5010155
💬 Discuss this project
1950Year Built
1Stories
O1Building Class
R3XZoning
2,353 sfGross Floor Area
1Units
Office only, 1 story · Owner of record: 300 MANOR ROAD LLC. · 5,600 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 128p · 2 filings · 20 docs
Cellar27p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANSELMO S. GENOVESE ARCHITECT PC710/12/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LARGIME MUJOVIC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DELTAMER, INCGeneral Contractor207/08/2026
LENS ELECTRIC, INCElectrical103/22/2026
COPPER PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738710/12/2023
Building Lifecycle
All (47)Filed (7)Permit Issued (3)Signed Off (1)Inspection (3)Objection (16)Special Inspection (17)
11/22/2023
Special inspection requirement — Insulation placement and R values
anthony santoro
11/22/2023
Special inspection requirement — Exterior lighting power
anthony santoro
11/22/2023
Special inspection requirement — Interior lighting power
anthony santoro
11/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
11/22/2023
Special inspection requirement — Lighting controls
anthony santoro
10/12/2023
Filed — Alteration CO
MODIFICATION OF EXISTING BATHROOM FIXTURES ON FIRST FLOOR AND CELLAR WITH NEW LAUNDRY FIXTURES IN CELLAR
S00530748-P4
10/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
10/03/2023
Special inspection requirement — Insulation placement and R values
anthony santoro
10/03/2023
Special inspection requirement — Exterior lighting power
anthony santoro
10/03/2023
Special inspection requirement — Lighting controls
anthony santoro
10/03/2023
Special inspection requirement — Interior lighting power
anthony santoro
08/23/2023
Filed — Alteration CO
MODIFICATION OF EXISTING BATHROOM FIXTURES ON FIRST FLOOR AND CELLAR WITH NEW LAUNDRY FIXTURES IN CELLAR
S00530748-P3
07/18/2023
Signed off — Alteration
REMOVE GAS WORK FROM APPLICATION. NO NEW GAS WORK TO BE DONE
S00565007-I1
05/18/2023
Filed — Alteration CO
MODIFICATION OF EXISTING BATHROOM FIXTURES ON FIRST FLOOR AND CELLAR WITH NEW LAUNDRY FIXTURES IN CELLAR
S00530748-P2
03/08/2023
Filed — Alteration CO
MODIFICATION OF EXISTING BATHROOM FIXTURES ON FIRST FLOOR AND CELLAR WITH NEW LAUNDRY FIXTURES IN CELLAR
S00530748-P1
02/15/2023
Special inspection requirement — Insulation placement and R values
anthony santoro
02/15/2023
Special inspection requirement — Lighting controls
anthony santoro
02/15/2023
Special inspection requirement — Exterior lighting power
anthony santoro
02/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
02/15/2023
Special inspection requirement — Interior lighting power
anthony santoro
08/09/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/09/2022
Objection resolved — Addressed
08/08/2022
Objection raised — Scope
07/26/2022
Filed — Alteration
REMOVE GAS WORK FROM APPLICATION. NO NEW GAS WORK TO BE DONE
S00565007-P1
07/21/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
07/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
07/15/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/16/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/08/2021
Permit issued — Plumbing
S00565007-I1-PL
12/07/2021
Permit issued — General Construction
S00530748-I1-GC
11/12/2021
Permit issued — General Construction
S00530748-I1-GC
08/17/2021
Objection raised — Scope
08/17/2021
Objection resolved — Addressed
07/28/2021
Filed — Alteration
REMOVE GAS WORK FROM APPLICATION. NO NEW GAS WORK TO BE DONE
S00565007-I1
07/22/2021
Objection raised — Scope
07/22/2021
Objection resolved — Addressed
07/14/2021
Objection raised — Energy
07/14/2021
Objection resolved — Addressed
07/14/2021
Objection raised — Energy
07/14/2021
Objection resolved — Addressed
07/14/2021
Objection raised — Energy
07/14/2021
Objection resolved — Addressed
07/14/2021
Objection raised — Energy
07/14/2021
Objection resolved — Addressed
07/14/2021
Objection raised — Energy
07/14/2021
Objection resolved — Addressed
06/24/2021
Filed — Alteration CO
MODIFICATION OF EXISTING BATHROOM FIXTURES ON FIRST FLOOR AND CELLAR WITH NEW LAUNDRY FIXTURES IN CELLAR
S00530748-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCOPPER MECHANICAL INC12/08/2021
DOB NOWGeneral ConstructionPermit IssuedDELTAMER, INC12/07/2021
DOB NOWGeneral ConstructionPermit IssuedDELTAMER, INC11/12/2021
1 project · most recent 11/10/2021
General Wiring
FiledStatusContractorScope
11/10/2021CompleteLENS ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/09/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/15/2022Pass-Final CND-Occupancy InspectionPassView ↗
12/16/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
11/22/2023Insulation placement and R valuesanthony santoroenergy_progress
11/22/2023Exterior lighting poweranthony santoroenergy_progress
11/22/2023Interior lighting poweranthony santoroenergy_progress
11/22/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
11/22/2023Lighting controlsanthony santoroenergy_progress
10/03/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
10/03/2023Insulation placement and R valuesanthony santoroenergy_progress
10/03/2023Exterior lighting poweranthony santoroenergy_progress
10/03/2023Lighting controlsanthony santoroenergy_progress
10/03/2023Interior lighting poweranthony santoroenergy_progress
02/15/2023Insulation placement and R valuesanthony santoroenergy_progress
02/15/2023Lighting controlsanthony santoroenergy_progress
02/15/2023Exterior lighting poweranthony santoroenergy_progress
02/15/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
02/15/2023Interior lighting poweranthony santoroenergy_progress
07/21/2022HVAC-R and service water piping design and insulationanthony santoroenergy_progress
07/21/2022Fire-Resistant Penetrations and Jointsanthony santorospecial
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026S00530748-P1Request digital key ↗
08/23/2026S00530748-P4Request digital key ↗
08/23/2026S00530748-P3Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00530748-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/13/2026S00530748-P4Open ↗
08/13/2026S00530748-P3Open ↗
08/13/2026S00530748-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026S00530748-I1Open ↗
08/26/2026S00530748-P4Open ↗
08/25/2026S00565007-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026S00530748-I1Open ↗
08/26/2026S00530748-P4Open ↗
08/25/2026S00565007-P1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist5
08/13/2026S00530748-P2Open ↗
08/13/2026S00530748-P1Open ↗
08/13/2026S00530748-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00530748-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/13/2026S00565007-I1Open ↗
08/13/2026S00530748-P2Open ↗
08/13/2026S00565007-P1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026S00530748-I1Open ↗
08/13/2026S00565007-I1Open ↗
▸Other Documents1
▸DOB NOWFinal Survey1
08/13/2026S00530748-I1Open ↗