← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The 300 West 122nd Street Condominium
300 WEST 122 STREET · Harlem (South) · BIN 1090740
💬 Discuss this project
2019Year Built
13Stories
RMBuilding Class
R8AZoning
166,189 sfGross Floor Area
173Units
LL97 CoveredRent Stabilized0 Open Violations
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: BESPOKE HARLEM WEST LLC · 23,521 sf lot · 7.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof2 filings · 20 docs
Floor 111 filing · 12 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 16p · 4 filings · 20 docs
Cellar6p · 4 filings · 20 docs
Site & exterior1 filing · 5 docs
Filed — no permit issued1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP907/08/2026
VIK XS SERVICES INC703/22/2026
CORE SCAFFOLD SYSTEMS603/22/2026
MEZONOT INC103/22/2026
WEST 122 ASSOC. LLC603/22/2026
LADERA1803/21/2026
ROCK GROUP NY203/21/2026
MOTIVA ENTERPRISES903/21/2026
WEST 122 ASSOC LLC C O RWN REAL1103/21/2026
SHELL OIL COMPANY303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PRECISION 3SIXTY NYC, INC1203/21/2026
JM ZONING, LLC.403/21/2026
zenesis group303/21/2026
AE DESIGN SOLUTION603/21/2026
A A BLDG CONSULTANT1203/21/2026
A1 EXPEDITING SERVICE CORP.103/21/2026
BMG GROUP USA303/21/2026
JME BUILDING CONSULTING, LLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor707/08/2026
RIGHTWAY PLBG AND HTG INCFire Protection707/08/2026
BEST MECHANICAL SVCS INCPlumbing507/08/2026
XOLLE DEMO LLCGeneral Contractor303/21/2026
SAHARA CONTRACTING CORPGeneral Contractor203/21/2026
VIK XS SERVICES INCGeneral Contractor203/21/2026
DYNAMIC ELEC'L CONTRS INCElectrical103/22/2026
METRO INCORPORATEDPlumbing107/08/2026
SAMUEL PALACEElectrical103/21/2026
METRO INCORPORATEDFire Protection107/08/2026
CITI BUILDERS NY LLCGeneral Contractor107/08/2026
MBQ CONTRACTING CORPGeneral Contractor107/08/2026
R'POL CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZENESIS ENGINEERING/ARCHI1473304/15/2025
RYAN SPECIAL ENGINEERING2018704/09/2024
20/20 INSPECTIONS INC1471603/17/2023
SHAHRISH SHUVO ENGINEERIN8524206/29/2022
Building Lifecycle
All (169)Filed (25)Permit Issued (25)Signed Off (12)Violation (60)Inspection (15)Objection (2)Special Inspection (30)
02/03/2026
Signed off — Alteration
New Supermarket in existing commercial space in conjunction with 120562284, Propose HVAC Systems.
M00613813-I1
11/24/2025
Signed off — Alteration
Modification to existing sprinkler system. Relocate and install sprinkler heads for fit out of space.
M00798822-S1
11/06/2025
Signed off — Alteration
Propose at Cellar level 1 Toilet, 1 Lavatory, 1 Non-Residential sinks and 3 FD. At 1st Fl. Propose 1 Toilet, 1 Lavatory, 11 non-residential sinks, 29 FD, 2 Grease traps, 4 Cooking Equipment and 1 Gas valve for Supermarket.
M00762365-I1
04/21/2025
Signed off — Alteration
PLUMBING AND SPRINKLER WORK RELATED TO THE COMBINATION OF 2 CLASS 'A' UNITS (11A & 11B). NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00881225-S1
04/16/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/15/2025
Filed — Alteration
PLUMBING AND SPRINKLER WORK RELATED TO THE COMBINATION OF 2 CLASS 'A' UNITS (11A & 11B). NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00881225-P1
04/15/2025
Special inspection requirement — Sprinkler Systems
RAJENDRA PARIKH
04/09/2025
Special inspection requirement — Sprinkler Systems
RAJENDRA PARIKH
01/22/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2024
Violation issued (ECB, closed)
Construction
09/11/2024
Signed off — Alteration
Modification to existing sprinkler system. Relocate and install sprinkler heads for fit out of space.
M00798822-S2
09/11/2024
Signed off — Alteration
Modification to existing sprinkler system. Relocate and install sprinkler heads for fit out of space.
M00798822-S3
08/12/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/24/2024
Signed off — Alteration
PARKING STACKERS - INSTALLATION OF SUSPENDED PARKING STACKERS SYSTEM AT PARTIAL CELLAR FLOOR NO CHANGE TO USE, EGRESS OR OCCUPANCY. INSTALLATION AS PER BB 2015-015 & BB 2023 (INDOOR AND OUTDOOR ATTENDANT OPERATATED PARKING)
M01011381-I1
05/21/2024
Violation issued (HPD, closed)
C
05/19/2024
Violation issued (HPD, closed)
C
05/19/2024
Violation issued (HPD, closed)
C
05/13/2024
Signed off — Alteration
PLUMBING AND SPRINKLER WORK RELATED TO THE COMBINATION OF 2 CLASS 'A' UNITS (11A & 11B). NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00881225-I1
05/02/2024
Permit issued — General Construction
M01011381-I1-GC
04/22/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/22/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/22/2024
Special inspection requirement — Maintenance information
William Ryan
04/22/2024
Special inspection requirement — Final
William Ryan
04/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
William Ryan
04/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
William Ryan
04/22/2024
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
04/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
William Ryan
04/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
William Ryan
04/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
04/22/2024
Special inspection requirement — Fire-Resistance Rated Construction
William Ryan
04/22/2024
Special inspection requirement — Heating Systems
William Ryan
04/22/2024
Special inspection requirement — Mechanical Systems
William Ryan
04/22/2024
Special inspection requirement — Shutoff dampers
William Ryan
04/19/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
AIMAN ELTOHAMY
04/19/2024
Special inspection requirement — Final
AIMAN ELTOHAMY
04/17/2024
Filed — Alteration
PARKING STACKERS - INSTALLATION OF SUSPENDED PARKING STACKERS SYSTEM AT PARTIAL CELLAR FLOOR NO CHANGE TO USE, EGRESS OR OCCUPANCY. INSTALLATION AS PER BB 2015-015 & BB 2023 (INDOOR AND OUTDOOR ATTENDANT OPERATATED PARKING)
M01011381-P1
04/17/2024
Objection resolved — Addressed
04/16/2024
Special inspection requirement — Final
AIMAN ELTOHAMY
04/16/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
AIMAN ELTOHAMY
04/12/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/11/2024
Objection raised — Admin
04/10/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/09/2024
Filed — Alteration
Modification to existing sprinkler system. Relocate and install sprinkler heads for fit out of space.
M00798822-P3
03/22/2024
Special inspection requirement — Maintenance information
William Ryan
03/22/2024
Special inspection requirement — Fire-Resistance Rated Construction
William Ryan
03/22/2024
Special inspection requirement — Shutoff dampers
William Ryan
03/22/2024
Special inspection requirement — Heating Systems
William Ryan
03/22/2024
Special inspection requirement — Mechanical Systems
William Ryan
03/22/2024
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
03/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
03/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
William Ryan
03/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
03/22/2024
Special inspection requirement — Final
William Ryan
03/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
William Ryan
03/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
William Ryan
03/15/2024
Filed — Alteration
PARKING STACKERS - INSTALLATION OF SUSPENDED PARKING STACKERS SYSTEM AT PARTIAL CELLAR FLOOR NO CHANGE TO USE, EGRESS OR OCCUPANCY. INSTALLATION AS PER BB 2015-015 & BB 2023 (INDOOR AND OUTDOOR ATTENDANT OPERATATED PARKING)
M01011381-I1
02/15/2024
Violation issued (HPD, closed)
C
02/15/2024
Violation issued (HPD, closed)
C
01/22/2024
Violation issued (HPD, closed)
C
01/12/2024
Violation issued (HPD, closed)
A
Latest 60 of 169 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCITI BUILDERS NY LLC05/02/2024
DOB NOWPlumbingSigned-offMETRO INCORPORATED09/06/2023
DOB NOWPlumbingSigned-offMETRO INCORPORATED09/06/2023
DOB NOWGeneral ConstructionSigned-offSAHARA CONTRACTING CORP09/01/2023
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC06/22/2023
DOB NOWSprinklersSigned-offRIGHTWAY PLBG AND HTG INC06/12/2023
DOB NOWGeneral ConstructionSigned-offR'POL CONSTRUCTION INC04/20/2023
DOB NOWMechanical SystemsSigned-offMBQ CONTRACTING CORP02/10/2023
DOB NOWGeneral ConstructionSigned-offXOLLE DEMO LLC07/22/2022
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC07/18/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC10/18/2021
DOB NOWProtection and Mechanical MethodsSigned-offVIK XS SERVICES INC10/13/2021
DOB NOWSprinklersPermit IssuedRIGHTWAY PLBG AND HTG INC09/14/2021
DOB NOWPlumbingPermit IssuedRIGHTWAY PLBG AND HTG INC03/17/2021
DOB NOWSprinklersPermit IssuedRIGHTWAY PLBG AND HTG INC02/24/2021
DOB NOWSprinklersPermit IssuedBEST MECHANICAL SVCS INC02/24/2021
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC02/24/2021
DOB NOWSprinklersPermit IssuedBEST MECHANICAL SVCS INC12/07/2020
DOB NOWPlumbingPermit IssuedRIGHTWAY PLBG AND HTG INC11/27/2020
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC10/19/2020
DOB NOWSprinklersPermit IssuedRIGHTWAY PLBG AND HTG INC10/02/2020
DOB NOWSprinklersPermit IssuedBEST MECHANICAL SVCS INC06/26/2020
DOB NOWSprinklersPermit IssuedRIGHTWAY PLBG AND HTG INC06/26/2020
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC02/25/2020
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC10/24/2019
BIS—ISSUEDCITI BUILDERS NY LLC06/14/2023
BIS—ISSUEDHAPPY LIVING DEVELOPMENT12/24/2021
BIS—ISSUEDHAPPY LIVING DEVELOPMENT10/26/2021
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.10/19/2021
BISSDISSUEDRIGHTWAY PLBG AND HTG INC10/06/2021
BISPLISSUEDBEST MECHANICAL SVCS INC10/06/2021
BISEQISSUEDHAPPY LIVING DEVELOPMENT08/27/2021
BIS—ISSUEDHAPPY LIVING DEVELOPMENT06/15/2021
BISOTISSUEDHAPPY LIVING DEVELOPMENT03/25/2021
BISSDISSUEDBEST MECHANICAL SVCS INC03/18/2021
BISEQISSUEDHAPPY LIVING DEVELOPMENT02/16/2021
BISOTISSUEDHAPPY LIVING DEVELOPMENT01/20/2021
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.12/15/2020
BISEQISSUEDVIK XS SERVICES INC12/09/2020
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.10/22/2020
+ 35 more permits on file
15 projects · most recent 02/04/2026
General Wiring
FiledStatusContractorScope
02/04/2026CompleteWATTS UP ELECTRIC NY LLC—
02/04/2026CompleteWATTS UP ELECTRIC NY LLC94 meters, 1 new_meters
02/04/2026CompleteWATTS UP ELECTRIC NY LLCGeneral Wiring
11/11/2025Permit IssuedPOWER DIRECT ELECTRIC INC—
10/29/2025CompleteDYNAMIC ELEC'L CONTRS INCGeneral Wiring
08/07/2025Permit IssuedDYNAMIC ELEC'L CONTRS INC—
05/13/2024CompleteHECMAR ELECTRICGeneral Wiring
04/03/2024CompleteTRIBORO ELEC'L CONTR'G COGeneral Wiring
03/19/2024CompleteROBERT CHIMENTI94 meters, 1 new_meters
02/29/2024CompleteDYNAMIC ELEC'L CONTRS INCGeneral Wiring
05/22/2020Permit IssuedR.C.M. ELECTRIC CORP.—
03/18/2020Permit IssuedR.C.M. ELECTRIC CORP.—
02/07/2020CompleteDYNAMIC ELEC'L CONTRS INC1 meters, 1 new_meters
10/17/2019CompleteV. VASS ELECTRIC CORP—
10/10/2019CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
04/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/12/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/22/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/12/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/10/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/07/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/04/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/03/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/24/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 95
DateRequirementInspectorRole
04/15/2025Sprinkler SystemsRAJENDRA PARIKHspecial
04/09/2025Sprinkler SystemsRAJENDRA PARIKHspecial
04/22/2024Mechanical SystemsWilliam Ryanspecial
04/22/2024Tenant Protection Plan ComplianceWilliam Ryanspecial
04/22/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
04/22/2024Maintenance informationWilliam Ryanenergy_progress
04/22/2024HVAC-R and service water heating system controlsWilliam Ryanenergy_progress
04/22/2024HVAC-R and service water piping design and insulationWilliam Ryanenergy_progress
04/22/2024HVAC-R and service water heating equipmentWilliam Ryanenergy_progress
04/22/2024Shutoff dampersWilliam Ryanenergy_progress
04/22/2024Energy Code Compliance InspectionsWilliam Ryanprogress
04/22/2024Fire-Resistance Rated ConstructionWilliam Ryanprogress
04/22/2024FinalWilliam Ryanprogress
04/22/2024Heating SystemsWilliam Ryanspecial
04/19/2024Alternative Materials - OTCR Buildings Bulletin NumberAIMAN ELTOHAMYspecial
04/19/2024FinalAIMAN ELTOHAMYprogress
04/16/2024FinalAIMAN ELTOHAMYprogress
04/16/2024Alternative Materials - OTCR Buildings Bulletin NumberAIMAN ELTOHAMYspecial
03/22/2024HVAC-R and service water heating equipmentWilliam Ryanenergy_progress
03/22/2024HVAC-R and service water piping design and insulationWilliam Ryanenergy_progress
03/22/2024Fire-Resistance Rated ConstructionWilliam Ryanprogress
03/22/2024FinalWilliam Ryanprogress
03/22/2024Shutoff dampersWilliam Ryanenergy_progress
03/22/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
03/22/2024Tenant Protection Plan Compliance—special
Latest 25 of 95.
▾Documents — 845 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch22
09/03/2026M00610522-I1Request digital key ↗
09/03/2026M00613813-I1Request digital key ↗
09/03/2026M00613813-P1Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/03/2026M00321552-P1Request digital key ↗
09/03/2026M00321552-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00245091-I1Request digital key ↗
▸Applications & Permits159
▸BISPLAN / WORK APPROVAL APPLICATION119
11/06/2025140983951Open ↗
04/09/2025120562284Open ↗
04/24/2024120562284Open ↗
Showing 3 of 119 on file for this type
▸BISWORK PERMIT APPLICATION36
06/15/2023120562284Open ↗
Showing 1 of 36 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation4
10/15/2024121861137Open ↗
11/28/2023121861137Open ↗
Showing 2 of 4 on file for this type
▸Zoning, Tax Lot & Property Records9
▸BISADDRESS: NEW HOUSE NUMBER APPROVED3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISZONING DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPRIOR TO FINAL ADD ON THE PW-1 ALL EASEMENTS FOR PARKING,CRFN,EXHIBITSTHAT ARE POPULATED ON THE CO PREVIEW.1
01/28/2026120562284Open ↗
▸BISVERIFY TAX LOT1
08/27/2024120562284Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/04/2025120562284Open ↗
▸Seals & Professional Certifications174
▸DOB NOWProgress Inspector Seal & Signature66
08/28/2026M00613813-I1Open ↗
08/28/2026M00613813-I1Open ↗
08/28/2026M01011381-P1Open ↗
Showing 3 of 66 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION28
11/24/2023120562284Open ↗
11/22/2023120562284Open ↗
Showing 2 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
09/03/2026M00321552-I1Open ↗
09/03/2026M00321552-P1Open ↗
09/03/2026M00613813-P4Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/05/2026M00798822-S2Open ↗
09/01/2026M00881225-S1Open ↗
08/28/2026M00881225-P1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment93
▸BISEQUIPMENT USE PERMITS51
11/24/2023120562284Open ↗
11/22/2023120562284Open ↗
11/22/2023120562284Open ↗
Showing 3 of 51 on file for this type
▸BISSCHEDULE B - PLUMBING20
03/25/2022140762930Open ↗
03/23/2022120562284Open ↗
03/23/2022140762930Open ↗
Showing 3 of 20 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT10
11/22/2023120562284Open ↗
11/22/2023120562284Open ↗
11/22/2023120562284Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSTANDPIPE SYSTEMS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST3
04/25/2023120562284Open ↗
Showing 1 of 3 on file for this type
▸Environmental & Asbestos26
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION11
09/16/2022140442411Open ↗
09/16/2022123430199Open ↗
08/25/2022123430180Open ↗
Showing 3 of 11 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWOER: Notice to Proceed3
09/03/2026M00321552-P1Open ↗
09/03/2026M00321552-I1Open ↗
08/13/2026M00245091-I1Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026M00245091-I1Open ↗
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
09/18/2025120562284Open ↗
09/17/2025120562284Open ↗
09/17/2025120562284Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00613813-I1Open ↗
08/13/2026M00798822-I1Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/27/2022120562284Open ↗
▸BISLIGHTING IN DWELLING UNITS1
12/14/2022120562284Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/03/2023120562284Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00798822-S1Open ↗
▸Inspections & Test Reports60
▸BISTECHNICAL REPORT: RESPONSIBILITY40
09/18/2025120562284Open ↗
09/17/2025120562284Open ↗
09/17/2025120562284Open ↗
Showing 3 of 40 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISMASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS1
12/27/2022120562284Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
09/01/2023120562284Open ↗
▸Approvals, Objections & Sign-offs71
▸BISSCHEDULE A - OCCUPANCY / USE26
04/09/2025120562284Open ↗
04/19/2023120562284Open ↗
04/11/2023120562284Open ↗
Showing 3 of 26 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION21
11/22/2023120562284Open ↗
Showing 1 of 21 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
11/07/2025140983951Open ↗
05/29/2025140442411Open ↗
09/13/2022140762930Open ↗
Showing 3 of 13 on file for this type
▸BISSUPERSEDING LETTER7
06/15/2023120562284Open ↗
Showing 1 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL1
06/16/2022122517605Open ↗
▸BISLANDMARKS APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
08/25/2022123430180Open ↗
08/23/2022123430199Open ↗
08/16/2022140762930Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
06/15/2023120562284Open ↗
Showing 1 of 4 on file for this type
▸Filing & Intake Forms99
▸BISADDITIONAL INFORMATION49
01/07/2026120562284Open ↗
05/02/2022120562284Open ↗
03/29/2022140762930Open ↗
Showing 3 of 49 on file for this type
▸BISBOROUGH INTAKE FORM24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISEFILING COVER SHEET17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸Other Documents29
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISTCO - Supporting Documents6
01/12/2023120562284Open ↗
03/23/2022120562284Open ↗
03/16/2022120562284Open ↗
Showing 3 of 6 on file for this type
▸BISPLOT DIAGRAM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISALTERNATIVE MATERIALS - OTCR BUILDINGS BULLETIN2
12/12/2023120562284Open ↗
09/01/2023120562284Open ↗
▸BISVESTIBULES1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMAINTENANCE INFORMATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPRIOR TO NEXT TCO CORRECT SCH A TO RECORD 13TH FL, IMPLIES ALL REGULATORY COMPLIANCE AND REVISE THE PW-1, SECTION13, SHOWN BLDG STORIES 13 FLRS1
01/28/2026120562284Open ↗