Condo, residential unit in walk-up building
St. Charles Condominium
300 WEST 138 STREET · BIN 1084487
💬 Discuss this project
1994Year Built
4Stories
R2Building Class
R7-2Zoning
36,188 sfGross Floor Area
28Units
LL97 CoveredFDNY Report ↗
Condo, residential unit in walk-up building · 19,983 sf lot · 1.81 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof1p · 1 filing · 11 docs
Floor 14p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PRO PACE CONSTRUCTION1007/08/2026
ST. CHARLES CONDOMINIUM IV607/08/2026
PHOENIX SUTTON STR INC903/22/2026
IRVINE REALTY GROUP103/21/2026
NYC DEPT OF HOUSING PRES DEV603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH K. BLUM CO. LLP205/15/2024
BOLT ARCHITECTURE, PLLC503/21/2024
THEODORE G. RIEPER ARCHITECTS PC306/26/2023
SYED ENGINEERING, P.C.107/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JENNY FLORES EXPEDITING303/21/2026
LY AND ME DESIGNS1003/21/2026
D D EXPEDITORS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PHOENIX SUTTON STR INCGeneral Contractor603/21/2026
INTER RENOVATION INCGeneral Contractor407/08/2026
B & M CONSTRUCTION NY CORGeneral Contractor303/21/2026
ORBIT PLBG & HTG INCPlumbing207/08/2026
ANDREW LIVADITISElectrical103/21/2026
PRO PACE CONSTRUCTION INCGeneral Contractor107/08/2026
PAT SEMENTA P & H CO INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSEPH K. BLUM CO. LLP1741205/15/2024
BOLTARCHITECTURE,PLLC6712503/21/2024
THEODORE G RIEPER ARCHITE4447112/09/2022
Building Lifecycle
All (64)Filed (11)Permit Issued (10)Signed Off (4)Inspection (9)Objection (2)Special Inspection (28)
07/22/2024
Signed off — Alteration
Repair/replace facade to include masonry, pointing, lintels, sills, caulking. Replace main roof (roof deck to remain)
M00489036-I1
06/20/2024
Special inspection requirement — Masonry
Dane Barnes
06/20/2024
Special inspection requirement — Final
Dane Barnes
06/20/2024
Special inspection requirement — Fenestration air leakage
Dane Barnes
06/20/2024
Special inspection requirement — Insulation placement and R values
Dane Barnes
06/20/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dane Barnes
06/20/2024
Special inspection requirement — Energy Code Compliance Inspections
Dane Barnes
06/06/2024
Objection resolved — Addressed
05/28/2024
Objection raised — Scope
05/15/2024
Filed — Alteration
Repair/replace facade to include masonry, pointing, lintels, sills, caulking. Replace main roof (roof deck to remain)
M00489036-P1
04/02/2024
Signed off — Alteration
INTERIOR ALTERATIONS TO EXISTING TWO FAMILY DWELLING AT UNIT D, THIRD & FOURTH FLOORS: ALTERATIONS TO INCLUDE THE REMOVAL AND REPLACEMENT OF EXIST. NON-LOAD BEARING PARTITION, FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00787314-I1
03/29/2024
Signed off — Alteration
INTERIOR RENOVATIONS AT UNIT D ON THE THIRD & FOURTH FLOORS. INTERIOR RENOVATIONS TO INCLUDE THE RELOCATION OF EXISTING PLUMBING FIXTURES AND PROPOSED NEW FIXTURES. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
M00787327-I1
03/25/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/21/2024
Filed — Alteration
INTERIOR RENOVATIONS AT UNIT D ON THE THIRD & FOURTH FLOORS. INTERIOR RENOVATIONS TO INCLUDE THE RELOCATION OF EXISTING PLUMBING FIXTURES AND PROPOSED NEW FIXTURES. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
M00787327-P3
03/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROMERO CHAMBERS JR
02/14/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/09/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/10/2024
Filed — Alteration
INTERIOR RENOVATIONS AT UNIT D ON THE THIRD & FOURTH FLOORS. INTERIOR RENOVATIONS TO INCLUDE THE RELOCATION OF EXISTING PLUMBING FIXTURES AND PROPOSED NEW FIXTURES. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
M00787327-P2
01/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROMERO CHAMBERS JR
12/12/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/08/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/30/2023
Permit issued — Plumbing
M00787327-I1-PL
09/28/2023
Filed — Alteration
INTERIOR RENOVATIONS AT UNIT D ON THE THIRD & FOURTH FLOORS. INTERIOR RENOVATIONS TO INCLUDE THE RELOCATION OF EXISTING PLUMBING FIXTURES AND PROPOSED NEW FIXTURES. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
M00787327-P1
06/26/2023
Filed — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF FIRST FLOOR BATHROOM AND KITCHEN (REPLACEMENT OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08045630-P1
06/07/2023
Special inspection requirement — Energy Code Compliance Inspections
Dane Barnes
06/07/2023
Special inspection requirement — Final
Dane Barnes
06/07/2023
Special inspection requirement — Insulation placement and R values
Dane Barnes
06/07/2023
Special inspection requirement — Fenestration air leakage
Dane Barnes
06/07/2023
Special inspection requirement — Masonry
Dane Barnes
06/07/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dane Barnes
04/21/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/18/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/17/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/23/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Water Test
Certified
View inspection ↗
12/23/2022
Permit issued — Plumbing
M08045630-I1-PL
12/23/2022
Permit issued — General Construction
M08045629-I1-GC
12/09/2022
Filed — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF FIRST FLOOR BATHROOM AND KITCHEN (REPLACEMENT OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08045630-I1
12/09/2022
Filed — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF FIRST FLOOR BATHROOM AND KITCHEN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08045629-I1
11/27/2022
Special inspection requirement — Energy Code Compliance Inspections
THEODORE RIEPER
11/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
THEODORE RIEPER
11/27/2022
Special inspection requirement — Final
THEODORE RIEPER
11/27/2022
Special inspection requirement — Fire-Resistance Rated Construction
THEODORE RIEPER
11/27/2022
Special inspection requirement — Interior lighting power
THEODORE RIEPER
11/27/2022
Special inspection requirement — Lighting in dwelling units
THEODORE RIEPER
11/27/2022
Special inspection requirement — Lighting controls
THEODORE RIEPER
10/05/2022
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
M00550705-I1
09/23/2022
Permit issued — Plumbing
M00787327-I1-PL
09/09/2022
Filed — Alteration
INTERIOR RENOVATIONS AT UNIT D ON THE THIRD & FOURTH FLOORS. INTERIOR RENOVATIONS TO INCLUDE THE RELOCATION OF EXISTING PLUMBING FIXTURES AND PROPOSED NEW FIXTURES. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
M00787327-I1
08/30/2022
Permit issued — General Construction
M00787314-I1-GC
08/10/2022
Filed — Alteration
INTERIOR ALTERATIONS TO EXISTING TWO FAMILY DWELLING AT UNIT D, THIRD & FOURTH FLOORS: ALTERATIONS TO INCLUDE THE REMOVAL AND REPLACEMENT OF EXIST. NON-LOAD BEARING PARTITION, FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00787314-I1
08/10/2022
Special inspection requirement — Lighting in dwelling units
ROMERO CHAMBERS JR
08/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROMERO CHAMBERS JR
08/10/2022
Special inspection requirement — Energy Code Compliance Inspections
ROMERO CHAMBERS JR
08/10/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
ROMERO CHAMBERS JR
08/10/2022
Special inspection requirement — Fenestration air leakage
ROMERO CHAMBERS JR
08/03/2022
Special inspection requirement — Final
ROMERO CHAMBERS JR
07/09/2022
Permit issued — Supported Scaffold
M00550705-I1-SH
06/23/2022
Permit issued — General Construction
M00489036-I1-GC
07/13/2021
Permit issued — Sidewalk Shed
M00550705-I1-SF
07/13/2021
Permit issued — Supported Scaffold
M00550705-I1-SH
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC11/30/2023
DOB NOWPlumbingSigned-offPAT SEMENTA P & H CO INC12/23/2022
DOB NOWGeneral ConstructionPermit IssuedPRO PACE CONSTRUCTION INC12/23/2022
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC09/23/2022
DOB NOWGeneral ConstructionSigned-offB & M CONSTRUCTION NY COR08/30/2022
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC07/09/2022
DOB NOWGeneral ConstructionSigned-offINTER RENOVATION INC06/23/2022
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC07/13/2021
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC07/13/2021
DOB NOWGeneral ConstructionSigned-offINTER RENOVATION INC06/28/2021
BISOTISSUEDCAPSTONE ENTERPRISES LLC05/17/2019
BISPLISSUEDVARUZZI PLUMBG & HTG INC03/26/2019
BISOTISSUEDCAPSTONE ENTERPRISES LLC03/13/2019
BIS—ISSUEDINTEGRATED BLDG SYS INC01/05/1995
BIS—ISSUEDINTEGRATED BLDG SYS INC01/05/1995
BISPLISSUEDDANICA PLG. + HTG. CORP.04/12/1994
BISPLISSUEDDANICA PLG. + HTG. CORP.04/12/1994
BIS—ISSUEDINTEGRATED BLDG SYS INC02/07/1994
BIS—ISSUEDINTEGRATED BLDG SYS INC02/07/1994
3 projects · most recent 02/19/2024
General Wiring
FiledStatusContractorScope
02/19/2024CompletePOWER CONTROL ELEC CORPGeneral Wiring
07/19/2021CompleteELPO ELECTRICAL CONTG INC—
05/24/2019CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/25/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/17/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/23/2023Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
06/20/2024MasonryDane Barnesspecial
06/20/2024FinalDane Barnesprogress
06/20/2024Fenestration air leakageDane Barnesenergy_progress
06/20/2024Insulation placement and R valuesDane Barnesenergy_progress
06/20/2024Structural Stability – Alterations of existing buildingsDane Barnesspecial
06/20/2024Energy Code Compliance InspectionsDane Barnesprogress
03/01/2024Fire-Resistant Penetrations and JointsROMERO CHAMBERS JRspecial
01/05/2024Fire-Resistant Penetrations and JointsROMERO CHAMBERS JRspecial
06/07/2023Energy Code Compliance InspectionsDane Barnesprogress
06/07/2023FinalDane Barnesprogress
06/07/2023Insulation placement and R valuesDane Barnesenergy_progress
06/07/2023Fenestration air leakageDane Barnesenergy_progress
06/07/2023MasonryDane Barnesspecial
06/07/2023Structural Stability – Alterations of existing buildingsDane Barnesspecial
11/27/2022Energy Code Compliance InspectionsTHEODORE RIEPERprogress
11/27/2022Fire-Resistant Penetrations and JointsTHEODORE RIEPERspecial
11/27/2022FinalTHEODORE RIEPERprogress
11/27/2022Fire-Resistance Rated ConstructionTHEODORE RIEPERprogress
11/27/2022Interior lighting powerTHEODORE RIEPERenergy_progress
11/27/2022Lighting in dwelling unitsTHEODORE RIEPERenergy_progress
11/27/2022Lighting controlsTHEODORE RIEPERenergy_progress
08/10/2022Lighting in dwelling unitsROMERO CHAMBERS JRenergy_progress
08/10/2022Fire-Resistant Penetrations and JointsROMERO CHAMBERS JRspecial
08/10/2022Energy Code Compliance InspectionsROMERO CHAMBERS JRprogress
08/10/2022Fenestration and door U-factor and product ratingsROMERO CHAMBERS JRenergy_progress
Latest 25 of 28.
▾Documents — 113 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/03/2026M00489036-I1Request digital key ↗
09/03/2026M00550705-I1Request digital key ↗
09/02/2026M00787314-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION13
11/15/2019123716684Open ↗
11/13/2019123716684Open ↗
10/29/2019123716684Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION5
05/17/2019123716684Open ↗
03/26/2019123716684Open ↗
03/13/2019123716684Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications42
▸DOB NOWProgress Inspector Seal & Signature14
08/31/2026M00550705-I1Open ↗
08/31/2026M00489036-P1Open ↗
08/31/2026M00489036-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/03/2026M00489036-I1Open ↗
09/03/2026M00489036-P1Open ↗
09/03/2026M00550705-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/05/2026M00787327-P3Open ↗
08/31/2026M00489036-P1Open ↗
08/31/2026M00787314-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/13/2019123716684Open ↗
03/13/2019123716684Open ↗
03/13/2019123716684Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
03/13/2019123716684Open ↗
03/13/2019123716684Open ↗
03/13/2019123716684Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
11/25/2019123716684Open ↗
09/12/2019123716684Open ↗
03/13/2019123716684Open ↗
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
11/13/2019123716684Open ↗
10/29/2019123716684Open ↗
10/24/2019123716684Open ↗
Showing 3 of 12 on file for this type
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
03/13/2019123716684Open ↗
03/13/2019123716684Open ↗
03/13/2019123716684Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
11/25/2019123716684Open ↗
09/12/2019123716684Open ↗
03/13/2019123716684Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
11/25/2019123716684Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00489036-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
11/25/2019123716684Open ↗
09/12/2019123716684Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
11/25/2019123716684Open ↗
09/12/2019123716684Open ↗
03/13/2019123716684Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms13
▸BISBOROUGH INTAKE FORM9
11/25/2019123716684Open ↗
10/29/2019123716684Open ↗
10/24/2019123716684Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET3
03/13/2019123716684Open ↗
03/13/2019123716684Open ↗
03/13/2019123716684Open ↗
▸BISADDITIONAL INFORMATION1
08/29/2019123716684Open ↗