Condo, residential unit in walk-up building
St. Charles Condominium
300 WEST 138 STREET · BIN 1084491
💬 Discuss this project
1994Year Built
4Stories
R2Building Class
R7-2Zoning
36,188 sfGross Floor Area
28Units
LL97 Covered0 Open Violations
Condo, residential unit in walk-up building · 19,983 sf lot · 1.81 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ST. CHARLES CONDOMINIUM IV703/22/2026
IRVINE REALTY GROUP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH K. BLUM CO. LLP205/15/2024
SYED ENGINEERING, P.C.107/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
D D EXPEDITORS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INTER RENOVATION INCGeneral Contractor603/21/2026
PHOENIX SUTTON STR INCGeneral Contractor407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSEPH K. BLUM CO. LLP1741205/15/2024
Building Lifecycle
All (24)Filed (3)Permit Issued (5)Signed Off (2)Violation (1)Special Inspection (13)
07/23/2024
Signed off — Alteration
Repair/replace facade as necessary to include masonry, pointing, lintels, sills, caulking, replace the roof (roof deck to remain)
M00489109-I1
05/15/2024
Filed — Alteration
Repair/replace facade as necessary to include masonry, pointing, lintels, sills, caulking, replace the roof (roof deck to remain)
M00489109-P1
05/15/2024
Special inspection requirement — Air barrier - visual inspection
Dane Barnes
05/15/2024
Special inspection requirement — Masonry
Dane Barnes
05/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dane Barnes
05/15/2024
Special inspection requirement — Final
Dane Barnes
05/15/2024
Special inspection requirement — Energy Code Compliance Inspections
Dane Barnes
05/15/2024
Special inspection requirement — Insulation placement and R values
Dane Barnes
06/07/2023
Special inspection requirement — Air barrier - visual inspection
Dane Barnes
06/07/2023
Special inspection requirement — Masonry
Dane Barnes
06/07/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dane Barnes
06/07/2023
Special inspection requirement — Energy Code Compliance Inspections
Dane Barnes
06/07/2023
Special inspection requirement — Final
Dane Barnes
06/07/2023
Special inspection requirement — Insulation placement and R values
Dane Barnes
10/05/2022
Signed off — Alteration
M00550687-I1
07/09/2022
Permit issued — Supported Scaffold
M00550687-I1-SH
06/23/2022
Permit issued — General Construction
M00489109-I1-GC
07/13/2021
Permit issued — Sidewalk Shed
M00550687-I1-SH
07/13/2021
Permit issued — Sidewalk Shed
M00550687-I1-SF
07/08/2021
Filed — Alteration
M00550687-I1
07/01/2021
Special inspection requirement — Final
Sunil Saigal
06/28/2021
Permit issued — General Construction
M00489109-I1-GC
04/12/2021
Filed — Alteration
Repair/replace facade as necessary to include masonry, pointing, lintels, sills, caulking, replace the roof (roof deck to remain)
M00489109-I1
02/16/2001
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC07/09/2022
DOB NOWGeneral ConstructionSigned-offINTER RENOVATION INC06/23/2022
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC07/13/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC07/13/2021
DOB NOWGeneral ConstructionSigned-offINTER RENOVATION INC06/28/2021
1 project · most recent 07/19/2021
FiledStatusContractorScope
07/19/2021CompleteELPO ELECTRICAL CONTG INC—
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
05/15/2024Air barrier - visual inspectionDane Barnesenergy_progress
05/15/2024MasonryDane Barnesspecial
05/15/2024Structural Stability – Alterations of existing buildingsDane Barnesspecial
05/15/2024FinalDane Barnesprogress
05/15/2024Energy Code Compliance InspectionsDane Barnesprogress
05/15/2024Insulation placement and R valuesDane Barnesenergy_progress
06/07/2023Air barrier - visual inspectionDane Barnesenergy_progress
06/07/2023MasonryDane Barnesspecial
06/07/2023Structural Stability – Alterations of existing buildingsDane Barnesspecial
06/07/2023Energy Code Compliance InspectionsDane Barnesprogress
06/07/2023FinalDane Barnesprogress
06/07/2023Insulation placement and R valuesDane Barnesenergy_progress
07/01/2021FinalSunil Saigalprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/03/2026M00550687-I1Request digital key ↗
08/27/2026M00489109-P1Request digital key ↗
08/27/2026M00489109-I1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026M00489109-P1Open ↗
09/02/2026M00489109-P1Open ↗
09/01/2026M00489109-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026M00489109-I1Open ↗
08/27/2026M00489109-P1Open ↗
08/13/2026M00550687-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026M00489109-P1Open ↗
09/01/2026M00489109-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00489109-I1Open ↗