← Back
BuildNYC
Condo, residential unit in walk-up building
St. Charles Condominium
300 WEST 138TH STREET · BIN 1084485
💬 Discuss this project
1994Year Built
4Stories
R2Building Class
R7-2Zoning
36,188 sfGross Floor Area
28Units
LL97 Covered6 Active Violations 2 old, status unconfirmed ▸
Condo, residential unit in walk-up building · 19,983 sf lot · 1.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofLimited exterior masonry repairs10p · 1 filing · 11 docs
Floor 4Light duty pipe scaffold installation4p · 1 filing · 3 docs
Floor 3Light duty pipe scaffold installation4p · 1 filing · 3 docs
Floor 2Light duty pipe scaffold installation4p · 1 filing · 3 docs
Floor 1Light duty pipe scaffold installation4p · 1 filing · 3 docs
Site & exteriorHeavy duty sidewalk shed installation17p · 3 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
St Charles Condominium IV1007/08/2026
NYC Department of Housing Preservation and Development603/21/2026
Irvine Realty Group103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joseph K. Blum Co205/15/2024
Paul Perdek, Prof. Engineering109/08/2021
Syed Engineering107/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution203/21/2026
D D Expeditors403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Phoenix Sutton STRScaffold603/21/2026
Inter RenovationGeneral Contractor407/08/2026
Inter RenovationScaffold303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Joseph K. Blum Co1741205/15/2024
Building Lifecycle
All (35)Filed (4)Permit Issued (6)Signed Off (2)Violation (9)Objection (2)Special Inspection (12)
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/23/2024
Signed off — Alteration
Repair/replace facade as necessary to include masonry, pointing, lintels, sills, caulking, replace main roof (roof deck top remain)
M00489152-I1
06/20/2024
Special inspection requirement — Fenestration air leakage
Dane Barnes
06/20/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dane Barnes
06/20/2024
Special inspection requirement — Masonry
Dane Barnes
06/20/2024
Special inspection requirement — Final
Dane Barnes
06/20/2024
Special inspection requirement — Energy Code Compliance Inspections
Dane Barnes
06/20/2024
Special inspection requirement — Insulation placement and R values
Dane Barnes
06/06/2024
Objection resolved — Addressed
05/28/2024
Objection raised — Scope
05/15/2024
Filed — Alteration
Repair/replace facade as necessary to include masonry, pointing, lintels, sills, caulking, replace main roof (roof deck top remain)
M00489152-P1
05/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/07/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dane Barnes
06/07/2023
Special inspection requirement — Energy Code Compliance Inspections
Dane Barnes
06/07/2023
Special inspection requirement — Final
Dane Barnes
06/07/2023
Special inspection requirement — Fenestration air leakage
Dane Barnes
06/07/2023
Special inspection requirement — Masonry
Dane Barnes
06/07/2023
Special inspection requirement — Insulation placement and R values
Dane Barnes
05/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/05/2022
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHATPER 33 OF NYCC.
M00550717-I1
07/09/2022
Permit issued — Sidewalk Shed
M00550717-I1-SH
06/23/2022
Permit issued — General Construction
M00489152-I1-GC
09/10/2021
Permit issued — Supported Scaffold
M00588488-I1-SF
09/08/2021
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00588488-I1
07/12/2021
Permit issued — Supported Scaffold
M00550717-I1-SH
07/12/2021
Permit issued — Sidewalk Shed
M00550717-I1-SF
07/08/2021
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHATPER 33 OF NYCC.
M00550717-I1
06/28/2021
Permit issued — General Construction
M00489152-I1-GC
04/12/2021
Filed — Alteration
Repair/replace facade as necessary to include masonry, pointing, lintels, sills, caulking, replace main roof (roof deck top remain)
M00489152-I1
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR07/09/2022
DOB NOWGeneral ConstructionSigned-offInter Renovation06/23/2022
DOB NOWSupported ScaffoldPermit IssuedInter Renovation09/10/2021
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR07/12/2021
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR07/12/2021
DOB NOWGeneral ConstructionSigned-offInter Renovation06/28/2021
BIS—ISSUEDIntegrated Building Systems01/05/1995
BIS—ISSUEDIntegrated Building Systems01/05/1995
BISPLISSUEDDanica PLG. + Heating04/15/1994
BISPLISSUEDDanica PLG. + Heating04/15/1994
BIS—ISSUEDIntegrated Building Systems02/07/1994
BIS—ISSUEDIntegrated Building Systems02/07/1994
1 project · most recent 07/19/2021
FiledStatusContractorScope
07/19/2021CompleteElpo Electrical Contg—
1 project · most recent 09/08/2021
Scaffold
FiledStatusContractorScope
09/08/2021Permit IssuedInter RenovationScaffold
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
06/20/2024Fenestration air leakageDane Barnesenergy_progress
06/20/2024Structural Stability – Alterations of existing buildingsDane Barnesspecial
06/20/2024MasonryDane Barnesspecial
06/20/2024FinalDane Barnesprogress
06/20/2024Energy Code Compliance InspectionsDane Barnesprogress
06/20/2024Insulation placement and R valuesDane Barnesenergy_progress
06/07/2023Structural Stability – Alterations of existing buildingsDane Barnesspecial
06/07/2023Energy Code Compliance InspectionsDane Barnesprogress
06/07/2023FinalDane Barnesprogress
06/07/2023Fenestration air leakageDane Barnesenergy_progress
06/07/2023MasonryDane Barnesspecial
06/07/2023Insulation placement and R valuesDane Barnesenergy_progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/03/2026M00489152-I1Request digital key ↗
09/03/2026M00550717-I1Request digital key ↗
09/03/2026M00588488-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/03/2026M00489152-I1Open ↗
09/03/2026M00489152-P1Open ↗
09/03/2026M00550717-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026M00489152-P1Open ↗
09/01/2026M00489152-P1Open ↗
08/23/2026M00489152-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026M00489152-P1Open ↗
08/23/2026M00489152-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00489152-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M00588488-I1Open ↗