Condo, residential tower (mixed-use, multi-family elevator) [derived]
300 WEST 23RD STREET
MANHATTAN · BIN 1013429
💬 Discuss this project
1931Year Built
21Stories
RMBuilding Class
C2-7AZoning
163,241 sfGross Floor Area
222Units
LL97 CoveredRent Stabilized2 Active Violations 2 old, status unconfirmed ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 11,300 sf lot · 14.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projects00 West 23rd Owners C1 filing
Roof300 West 23rd Owners Corporation2p · 4 filings · 11 docs
Bulkhead300 West 23rd Owners Corporation1p · 1 filing · 13 docs
Floor 19Unit 19E, Unit 19GUnder Construction1 filing · 18 docs
Floor 18
Floor 17
Floor 16Unit 16M, Unit 16N, Unit 16MN2 filings · 11 docs
Floor 15Unit 15H1 filing · 8 docs
Floor 14Unit 14D, Unit 14E, Unit 14F +1Under Construction2 filings · 20 docs
Floor 13
Floor 12
Floor 11Unit 11E, Unit 11F1 filing · 4 docs
Floor 10Unit 10M1 filing · 11 docs
Floor 9Unit 9F, Unit 9G2 filings · 11 docs
Floor 8Unit 8H, Unit 8I, Unit 8BC1p · 3 filings · 15 docs
Floor 7Unit 7N2 filings · 11 docs
Floor 6
Floor 5
Floor 4
Floor 3Unit 3F, Unit 3G, Unit 3GF2 filings · 11 docs
Floor 2
Floor 1Carpel, The Yitamn ShoppeUnder Construction1p · 5 filings · 20 docs
CellarCarpelUnder Construction3p · 5 filings · 20 docs
BasementHVAC controls system maintenance and calibration1p · 1 filing · 20 docs
Site & exteriorThe Vitamin Shop12 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
300 West 23rd Street Owners10203/22/2026
Charles Washington4603/21/2026
Schuckman3007/08/2026
300 West 21703/21/2026
Cappiello1104/09/2026
Blumberg & Freilich Equities603/21/2026
300 W 23rd Street Condominium603/21/2026
Owners103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Brooklyn Root Design503/21/2026
K & M Associates403/21/2026
Synergy Building Consultants403/21/2026
AK Consulting Services203/21/2026
JP Expedite1203/21/2026
Rand Engineering & Arch1603/21/2026
J.A.M. Associates603/21/2026
Favio Maria Barrionuevo203/21/2026
HS Design Studio203/21/2026
John Patrick Bohan Architect203/21/2026
NYKB103/21/2026
Bohler Engineering303/21/2026
KM Associates of New York103/21/2026
Idm Associates603/21/2026
Somma Design Consulting203/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Signs CadSign hanger1707/08/2026
Ceprine ConstructionScaffold907/08/2026
Asa Building MaintenanceGeneral Contractor707/08/2026
NY Kitchen & Bath USAGeneral Contractor603/21/2026
Flytiger P & HPlumbing407/08/2026
Pofi ConstructionGeneral Contractor403/21/2026
Kings Group NYScaffold303/21/2026
K.E.S. Construction CoGeneral Contractor307/08/2026
Studio PublicGeneral Contractor303/21/2026
Windecker ConstructionGeneral Contractor303/21/2026
Kishan PlumbingPlumbing207/08/2026
Stat ElectricElectrical203/21/2026
King Kong G/CGeneral Contractor203/21/2026
?Suk Young KimElectrical103/21/2026
United Electrical Cont'gElectrical103/22/2026
Archlink DesignGeneral Contractor107/08/2026
Better Builders ConceptsGeneral Contractor104/09/2026
DV ContractingGeneral Contractor107/08/2026
Golden I ConstructionGeneral Contractor104/09/2026
HVAC Expertsspecialty_contractor104/09/2026
Kaback EnterprisesGeneral Contractor107/08/2026
KBRNYGeneral Contractor104/09/2026
L & B BrothersGeneral Contractor108/26/2026
Linli HVACGeneral Contractor108/26/2026
Pyznar ConstructionGeneral Contractor104/09/2026
RD Home ConstructionGeneral Contractor107/08/2026
Stanley Ruth CoGeneral Contractor104/09/2026
Everest ScaffoldingScaffold107/08/2026
Leema Plumbing & HeatingScaffold104/09/2026
A&H Express Plumbing & HeatingPlumbing106/28/2026
American Standard P&H CororpPlumbing107/08/2026
Ark-Pol PlumbingPlumbing107/08/2026
G. & S. Plumbing & Heating CoPlumbing107/08/2026
HI-Tech Plumbing & HeatingPlumbing107/11/2026
Pipe RitePlumbing107/08/2026
Borowide Elect'l ContractorsElectrical103/22/2026
Watson's Plumbing, Heating, & BuildingPlumbing107/08/2026
Bruni ElectricElectrical103/22/2026
Fraccavento ElectricElectrical103/22/2026
Borowide Elect'l ContractorsElectrical103/21/2026
RPJ ElectricElectrical103/21/2026
Ket ElectricElectrical103/22/2026
Ket ElectricElectrical103/21/2026
Lina ElectricElectrical103/22/2026
Norlin Electrical ContractorsElectrical103/21/2026
Elemco Testing Co Inc DbaElectrical103/21/2026
R-2 ElectricElectrical103/22/2026
R & T ElectricalElectrical103/22/2026
Asko Electric Construction & MaintenanceElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Carlo Balestri Architect4139306/25/2026
Delta Testing Labs687308/26/2025
Ryan Special Engineering2018308/06/2025
Rand Engineering & Architects266804/18/2025
Huan Design7669204/09/2025
Bruno Kearney Architects3065209/23/2024
Municipal Testing Laborat230106/21/2024
AK Consulting Services, I6198211/22/2023
Just Consulting Engineering5865204/19/2023
Triangle Inspection & Tes7495212/14/2022
PSI Agency254212/05/2022
EP Inspections and Commis7079312/05/2022
Think Design Architectura683109/22/2022
Eti Consultants7694311/09/2021
Vincent J. Liotta P. E1974208/24/2021
Building Lifecycle
All (300)Filed (63)Permit Issued (65)Signed Off (33)Facade (FISP) (9)Violation (21)Inspection (21)Objection (58)Special Inspection (30)
09/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/24/2026
Signed off — Alteration
COMBINATION OF TWO APARTMENTS #8I/8H ON THE 8TH FLOOR. REMOVE , REPLACE AND INSTALL PLUMBING FIXTURES.
M00219532-I1
08/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
ERIN VALI
08/25/2026
Special inspection requirement — Energy Code Compliance Inspections
ERIN VALI
08/11/2026
Permit issued — Mechanical Systems
M01407301-S1-MS
07/20/2026
Permit issued — General Construction
M01407301-I1-GC
07/10/2026
Permit issued — Plumbing
M01407301-S2-PL
06/25/2026
Filed — Alteration
Install 1 new 3-ton split system heat pump on balcony with 3 indoor air blowers. Install 1 new bathroom exhaust fan.
M01407301-S1
06/25/2026
Filed — Alteration
Install 1 new 3-ton split system heat pump on balcony with 3 indoor air blowers. Install 1 new bathroom exhaust fan.
M01407301-I1
06/25/2026
Filed — Alteration
Install 1 new 3-ton split system heat pump on balcony with 3 indoor air blowers. Install 1 new bathroom exhaust fan.
M01407301-S2
06/17/2026
Filed — Alteration
mechanical work as shown on drawings filed herewith.
M01157281-P1
05/28/2026
Special inspection requirement — Energy Code Compliance Inspections
Carlo Balestri
05/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Carlo Balestri
05/28/2026
Special inspection requirement — Lighting in dwelling units
Carlo Balestri
05/28/2026
Special inspection requirement — Lighting controls
Carlo Balestri
05/26/2026
Special inspection requirement — Final
Carlo Balestri
05/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Carlo Balestri
05/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
Carlo Balestri
05/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Carlo Balestri
05/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
Carlo Balestri
05/21/2026
Filed — Alteration
COMBINATION OF TWO APARTMENTS #8I/8H ON THE 8TH FLOOR. REMOVE , REPLACE AND INSTALL PLUMBING FIXTURES.
M00219532-P1
05/21/2026
Objection raised — Inspections
05/21/2026
Objection raised — Accessibility
05/21/2026
Objection raised — Scope
05/21/2026
Objection raised — Scope
05/21/2026
Objection raised — Scope
05/15/2026
Special inspection requirement — Energy Code Compliance Inspections
ERIN VALI
05/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
ERIN VALI
04/14/2026
Signed off — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION & RELATED PLUMBING WORK OF APT 9G ON 9TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01205366-S1
03/24/2026
Signed off — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION & RELATED PLUMBING WORK OF APT 9G ON 9TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01205366-I1
02/12/2026
Violation issued (HPD, open)
C
02/12/2026
Violation issued (HPD, open)
C
12/18/2025
Permit issued — Mechanical Systems
M01157281-S2-MS
11/24/2025
Objection resolved — Addressed
11/21/2025
Permit issued — General Construction
M01209244-I1-GC
11/20/2025
Permit issued — Plumbing
M01226517-I1-PL
11/17/2025
Signed off — Alteration
Filing herewith filing installation of Steam Coil Unit, Piping, and related Mechanical work for apt 16M/N combination.
M08025034-I1
11/14/2025
Signed off — Alteration
Proposed apartment combination (16M/N) consisting of rearrangement of interior partitions, doors and finishes as per plans submitted herewith. No change in use, egress or occupancy.
M00786268-I1
11/13/2025
Permit issued — Plumbing
M01157281-S1-PL
11/10/2025
Permit issued — General Construction
M01157281-I1-GC
10/28/2025
Objection resolved — Addressed
10/28/2025
Objection resolved — Addressed
10/09/2025
Objection resolved — Addressed
10/09/2025
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
10/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
William Ryan
10/06/2025
Signed off — Alteration
INTERIOR RENOVATION TO APT#3GF ON THE 3RD FLOOR. REMOVE AND CONSTRUCT PARTITIONS AND FINISHES. ALL AS PER PLANS SUBMITTED HEREWITH.
M01062416-I1
10/06/2025
Objection resolved — Addressed
10/03/2025
Signed off — Alteration
M01062428-I1
10/03/2025
Objection resolved — Addressed
10/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
William Ryan
10/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
09/29/2025
Objection raised — Admin
09/29/2025
Objection raised — Cost
09/29/2025
Objection raised — Scope
09/29/2025
Objection raised — Admin
09/29/2025
Objection raised — Scope
09/05/2025
Permit issued — Mechanical Systems
M08025034-I1-MS
08/30/2025
Objection raised — Scope
08/30/2025
Objection raised — Scope
08/27/2025
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT. REMOVE AND INSTALL NON-STRUCTURAL PARTITIONS AND FINISHES. REPLACE PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01082337-S1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedLinli HVAC08/11/2026
DOB NOWGeneral ConstructionPermit IssuedL & B Brothers07/20/2026
DOB NOWPlumbingPermit IssuedHI-Tech Plumbing & Heating07/10/2026
DOB NOWMechanical SystemsPermit IssuedHVAC Experts12/18/2025
DOB NOWGeneral ConstructionPermit IssuedBetter Builders Concepts11/21/2025
DOB NOWPlumbingPermit IssuedN and S Plumbing11/20/2025
DOB NOWPlumbingPermit IssuedA&H Express Plumbing & Heating11/13/2025
DOB NOWGeneral ConstructionPermit IssuedGolden I Construction11/10/2025
DOB NOWMechanical SystemsSigned-offStanley Ruth Co09/05/2025
DOB NOWPlumbingPermit IssuedN and S Plumbing08/14/2025
DOB NOWGeneral ConstructionSigned-offKBRNY05/12/2025
DOB NOWSignSigned-offSigns Cad01/08/2025
DOB NOWSignSigned-offSigns Cad01/08/2025
DOB NOWSignSigned-offSigns Cad01/07/2025
DOB NOWSignSigned-offSigns Cad01/07/2025
DOB NOWSignSigned-offSigns Cad01/03/2025
DOB NOWPlumbingSigned-offG. & S. Plumbing & Heating Co11/21/2024
DOB NOWSuspended ScaffoldPermit IssuedK.E.S. Construction Co10/30/2024
DOB NOWGeneral ConstructionSigned-offStudio Public10/15/2024
DOB NOWSuspended ScaffoldPermit IssuedCentral Construction Management09/09/2024
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp08/08/2024
DOB NOWSidewalk ShedSigned-offCeprine Construction07/31/2024
DOB NOWGeneral ConstructionSigned-offRD Home Construction07/30/2024
DOB NOWGeneral ConstructionSigned-offK.E.S. Construction Co04/01/2024
DOB NOWSignSigned-offSigns Cad12/14/2023
DOB NOWSignSigned-offSigns Cad12/14/2023
DOB NOWSignSigned-offSigns Cad12/14/2023
DOB NOWSignSigned-offSigns Cad12/14/2023
DOB NOWSignSigned-offSigns Cad12/13/2023
DOB NOWSignSigned-offSigns Cad12/13/2023
DOB NOWSuspended ScaffoldPermit IssuedK.E.S. Construction Co12/05/2023
DOB NOWSidewalk ShedSigned-offCeprine Construction08/03/2023
DOB NOWPlumbingPermit IssuedFlytiger P & H05/26/2023
DOB NOWGeneral ConstructionSigned-offK.E.S. Construction Co04/20/2023
DOB NOWPlumbingSigned-offPipe Rite02/10/2023
DOB NOWGeneral ConstructionSigned-offDV Contracting01/24/2023
DOB NOWSignSigned-offSigns Cad11/30/2022
DOB NOWSignSigned-offSigns Cad11/30/2022
DOB NOWSignSigned-offSigns Cad11/30/2022
DOB NOWSignSigned-offSigns Cad11/30/2022
+ 60 more permits on file
2 projects · most recent 06/25/2026
Heating and Air Conditioning Systems Ventilation Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/25/2026Permit IssuedLinli HVACHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin Daikin 3-Ton, 4-Port Heat Pump 4MXM36AVJU9 34,600 BTU · Heat Pump Outdoor ×1
Ventilation
Panasonic Whisper Value DC FV-0510VS1 81 CFM · Exhaust Fan ×1
06/17/2026Permit IssuedHVAC ExpertsAir Conditioning Systems
Cooling
Task TYC021TWC-19K 19,500 BTU · Condensing Unit ×1
TYC021TWC-30K 29,900 BTU · Condensing Unit ×1
5 projects · most recent 06/25/2026
Water/Sanitary Gas
FiledStatusContractorScope
06/25/2026Permit IssuedHI-Tech Plumbing & HeatingGas, Water/Sanitary
06/17/2026Permit IssuedA&H Express Plumbing & HeatingGas, Water/Sanitary
05/21/2026Signed-offArk-Pol PlumbingWater/Sanitary
08/06/2025Permit IssuedKishan PlumbingWater/Sanitary
05/04/2023Permit IssuedFlytiger P & HGas, Water/Sanitary
25 projects · most recent 07/18/2026
General Wiring Boiler Controls
FiledStatusContractorScope
07/18/2026CompleteLens ElectricGeneral Wiring
05/08/2026CompleteDaven Electric—
01/20/2026Permit IssuedKet ElectricGeneral Wiring
01/12/2026Permit IssuedJoseph Weinstein ElectricGeneral Wiring
11/25/2025CompleteKings Electric Co—
11/14/2025CompleteR-2 ElectricGeneral Wiring
10/30/2025Permit IssuedJoseph Weinstein ElectricGeneral Wiring
09/23/2025CompleteLina ElectricGeneral Wiring
08/05/2025CompleteWebstar Electrical ContractorsGeneral Wiring
06/26/2025CompleteEtech ElectricalGeneral Wiring
06/23/2025CompleteAmsterdam ElectricGeneral Wiring
02/11/2025Permit IssuedSega Electric1 meters, 1 new_meters
01/21/2025CompleteFraccavento ElectricGeneral Wiring
12/12/2024CompleteAMC Electrical Services—
12/04/2024Permit IssuedEvs ElectricGeneral Wiring
1 project · most recent 11/22/2023
Suspended Scaffold (SC)
FiledStatusContractorScope
11/22/2023Permit IssuedK.E.S. Construction CoSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
09/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/12/2023Pass-Final Boiler Equipment InspectionPassView ↗
06/06/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/26/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/01/2023Certified Sprinkler (PL) - SP - RoughingCertifiedView ↗
02/28/2023Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
02/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/28/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/16/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/01/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/28/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/25/2026Fire-Resistance Rated ConstructionERIN VALIprogress
08/25/2026Energy Code Compliance InspectionsERIN VALIprogress
05/28/2026Energy Code Compliance InspectionsCarlo Balestriprogress
05/28/2026Lighting controlsCarlo Balestrienergy_progress
05/28/2026Lighting in dwelling unitsCarlo Balestrienergy_progress
05/28/2026Fire-Resistant Penetrations and JointsCarlo Balestrispecial
05/26/2026Tenant Protection Plan ComplianceCarlo Balestrispecial
05/26/2026Energy Code Compliance InspectionsCarlo Balestriprogress
05/26/2026Fire-Resistance Rated ConstructionCarlo Balestriprogress
05/26/2026FinalCarlo Balestriprogress
05/26/2026Fire-Resistant Penetrations and JointsCarlo Balestrispecial
05/15/2026Fire-Resistance Rated ConstructionERIN VALIprogress
05/15/2026Energy Code Compliance InspectionsERIN VALIprogress
10/09/2025Energy Code Compliance InspectionsWilliam Ryanprogress
10/09/2025HVAC-R and service water piping design and insulationWilliam Ryanenergy_progress
10/03/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
10/03/2025Tenant Protection Plan ComplianceWilliam Ryanspecial
07/08/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
06/26/2025HVAC-R and service water heating equipmentRICHARD GREENWALDenergy_progress
06/26/2025Shutoff dampersRICHARD GREENWALDenergy_progress
06/26/2025HVAC-R and service water piping design and insulationRICHARD GREENWALDenergy_progress
06/26/2025HVAC-R and service water heating system controlsRICHARD GREENWALDenergy_progress
06/26/2025Duct leakage testing, insulation and designRICHARD GREENWALDenergy_progress
06/19/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
06/19/2025Tenant Protection Plan ComplianceWilliam Ryanspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
CarpelRestaurant / Food ServiceCellar, Floor 1
Project M01226516 Alteration · Objections · 08/06/2025
Project M01226517 Alteration · Permit Entire · 08/06/2025
Project M01226518 Alteration · Approved · 08/06/2025
The Vitamin ShopRetail—
Project M08037896 Alteration · LOC Issued · 11/29/2022
Project M08037922 Alteration · LOC Issued · 11/29/2022
Project M08037936 Alteration · LOC Issued · 11/29/2022
Project M08037948 Alteration · LOC Issued · 11/29/2022
Project M08037960 Alteration · LOC Issued · 11/29/2022
Project M08037967 Alteration · LOC Issued · 11/29/2022
The Yitamn ShoppeRetailFloor 1
Project M00791889 Alteration · LOC Issued · 09/22/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,269 on file (BIS + DOB NOW)
▸Plans & Drawings63
▸DOB NOWPlans/Sketch53
09/03/2026M00533745-P1Request digital key ↗
09/03/2026M00533745-I1Request digital key ↗
09/03/2026M00558054-I1Request digital key ↗
Showing 3 of 53 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/05/2026M00219532-P1Request digital key ↗
09/05/2026M00219532-I1Request digital key ↗
09/05/2026M00239409-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/03/2026M00470544-I1Request digital key ↗
Showing 1 of 3 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00441822-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00154190-I1Request digital key ↗
▸Applications & Permits218
▸BISWORK PERMIT APPLICATION115
01/13/2021140970411Open ↗
03/24/2020123771784Open ↗
11/27/2019140874267Open ↗
Showing 3 of 115 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION103
12/16/2025140970411Open ↗
12/15/2025140970411Open ↗
12/12/2025140970411Open ↗
Showing 3 of 103 on file for this type
▸Seals & Professional Certifications323
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION127
11/04/2019121050539Open ↗
10/17/2019121050539Open ↗
10/10/2019121050539Open ↗
Showing 3 of 127 on file for this type
▸DOB NOWProgress Inspector Seal & Signature75
09/30/2026M00701380-P1Open ↗
09/30/2026M00701380-P1Open ↗
09/23/2026M01157281-S2Open ↗
Showing 3 of 75 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature62
09/05/2026M00154190-I1Open ↗
09/05/2026M00219532-I1Open ↗
09/03/2026M00573420-I1Open ↗
Showing 3 of 62 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature34
09/30/2026M00701380-P1Open ↗
09/23/2026M01157281-S2Open ↗
09/23/2026M01157281-S2Open ↗
Showing 3 of 34 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
12/04/2018123597152Open ↗
Showing 1 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
11/02/2020140970411Open ↗
12/04/2018123597152Open ↗
Showing 2 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
11/14/2019140874267Open ↗
10/25/2019140874267Open ↗
Showing 2 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/02/2020140970411Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/02/2020140970411Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment78
▸BISSELF-CERT PLUMBING NOTICE31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE25
10/30/2018123120087Open ↗
09/20/2018123362351Open ↗
Showing 2 of 25 on file for this type
▸BISSCHEDULE B - PLUMBING16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISEQUIPMENT USE PERMITS3
06/26/2019123120087Open ↗
02/19/2019123597152Open ↗
Showing 2 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
06/26/2019123120087Open ↗
02/19/2019123597152Open ↗
Showing 2 of 3 on file for this type
▸Safety & Tenant Protection23
▸BISTenant Protection Plan and Notes16
10/25/2019140874267Open ↗
08/22/2019123771784Open ↗
12/04/2018123597152Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWTenant Protection Plan4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Environmental & Asbestos100
▸DOB NOWDEP ACP-5: Asbestos Assessment Report42
09/05/2026M00154190-I1Open ↗
09/03/2026M00573420-I1Open ↗
09/03/2026M00573420-S1Open ↗
Showing 3 of 42 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)39
11/02/2020140970411Open ↗
10/25/2019140874267Open ↗
08/22/2019123771784Open ↗
Showing 3 of 39 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance136
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS70
11/04/2019121050539Open ↗
08/22/2019123771784Open ↗
08/21/2019123120087Open ↗
Showing 3 of 70 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS32
10/18/2021123771784Open ↗
11/04/2019121050539Open ↗
08/21/2019123120087Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
10/18/2021123771784Open ↗
11/02/2020140970411Open ↗
07/10/2020140874267Open ↗
Showing 3 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
12/16/2025140970411Open ↗
09/20/2023121726061Open ↗
07/10/2020140874267Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
12/16/2025140970411Open ↗
09/20/2023121726061Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
11/02/2020140970411Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNYCECC ANALYSIS1
11/02/2020140970411Open ↗
▸BISINTERIOR LIGHTING POWER1
12/16/2025140970411Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
11/13/2023121726061Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY11
11/13/2023121726061Open ↗
09/20/2023121726061Open ↗
10/18/2021123771784Open ↗
Showing 3 of 11 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
12/16/2025140970411Open ↗
09/20/2023121726061Open ↗
▸BISSIA # REQD FOR TR11
09/20/2023121726061Open ↗
▸Approvals, Objections & Sign-offs81
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST45
12/16/2025140970411Open ↗
11/13/2023121726061Open ↗
10/18/2021123771784Open ↗
Showing 3 of 45 on file for this type
▸BISADMINISTRATIVE OBJECTIONS19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
01/09/2019123431777Open ↗
Showing 1 of 8 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFINAL2
12/16/2025140970411Open ↗
09/20/2023121726061Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP Variance (V5) letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership102
▸BISCOST AFFIDAVIT94
10/18/2021123771784Open ↗
11/02/2020140970411Open ↗
11/20/2019140874267Open ↗
Showing 3 of 94 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
12/16/2025140970411Open ↗
11/13/2023121726061Open ↗
07/10/2020140874267Open ↗
▸Filing & Intake Forms105
▸BISEFILING COVER SHEET49
08/22/2019123771784Open ↗
12/04/2018123597152Open ↗
Showing 2 of 49 on file for this type
▸BISBOROUGH INTAKE FORM28
11/04/2019121050539Open ↗
10/17/2019121050539Open ↗
10/17/2019121050539Open ↗
Showing 3 of 28 on file for this type
▸BISADDITIONAL INFORMATION21
12/16/2025140970411Open ↗
11/21/2019140874267Open ↗
11/14/2019140874267Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
11/02/2020140970411Open ↗
10/25/2019140874267Open ↗
Showing 2 of 7 on file for this type
▸Other Documents23
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
12/15/2025140970411Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWDHCR Document6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSupporting Document: Fee Deferment2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTEMPORARY FLOOD SHIELDS: EMERGENCY FLOOD PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type