← Back
BuildNYC
Elevator apt, fireproof with stores
300 WEST 46TH STREET
MANHATTAN · BIN 1081654
💬 Discuss this project
1890Year Built
5Stories
D6Building Class
C6-4Zoning
39,183 sfGross Floor Area
87Units
LL97 CoveredRent Stabilized19 Active Violations 16 unresolved · 3 paperwork only 6 likely answered ▸
Elevator apt, fireproof with stores · Owner of record: Clinton Housing WEST46TH Partners · 8,164 sf lot · 4.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofAll'antico VinaioUnder Construction7p · 2 filings · 20 docs
Floor 2Clinton Housing Development Company17p · 1 filing · 17 docs
Floor 1All'antico Vinaio, Antico Vinaio Sandwich ShopUnder Construction13p · 8 filings · 20 docs
MezzanineClinton Housing Development Company18p · 1 filing · 17 docs
CellarAll'antico Vinaio, Antico Vinaio Sandwich ShopUnder Construction13p · 8 filings · 20 docs
Site & exteriorClinton Housing Development Company35p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Clinton Housing Development Company8907/08/2026
CHDC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TSF Engineering501/23/2026
Serdar Ceylan Architect301/23/2026
Rocda PE107/07/2025
Edelman Sultan Knox Wood/Architects311/19/2024
AK Consulting Services104/05/2024
Ashraf208/10/2023
Tan Engineering207/11/2023
Jee Won Kim Architect105/25/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Serdar Ceylan Architect403/21/2026
William Vitacco Associates303/21/2026
ADG303/21/2026
Rigid Structural Design203/21/2026
AK Consulting Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Erin Construction & DevelopmentGeneral Contractor907/08/2026
Orbit Plumbing & HeatingPlumbing606/28/2026
Erin Construction & DevelopmentScaffold507/08/2026
Intersystems Installation S&SScaffold407/08/2026
Leader Electric CoElectrical303/21/2026
Skinner Plumbing & HeatingPlumbing307/08/2026
Fazio Construction GroupGeneral Contractor207/08/2026
Skinner Plumbing & HeatingPlumbing203/22/2026
AMC Construction and DesignGeneral Contractor204/09/2026
Stat ElectricElectrical103/21/2026
High Quality Electric ofElectrical103/22/2026
Orbit SprinklerFire Protection107/08/2026
Power Surge ElectricElectrical103/21/2026
Prestigious Maintenance IGeneral Contractor104/09/2026
PK ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Welldone Inspection8628501/23/2026
Ceylan Design and Consulting8422507/08/2025
Domani Inspection Service843211/19/2024
EP Inspections and Commis7079209/07/2023
Socotec Engineering4983107/11/2023
Tan Engineering1291107/11/2023
Building Lifecycle
All (199)Filed (18)Permit Issued (20)Signed Off (7)Violation (60)Inspection (7)Objection (57)Special Inspection (30)
07/09/2026
Violation issued (HPD, open)
A
07/09/2026
Violation issued (HPD, open)
A
07/07/2026
Signed off — Alteration
Install new concrete strip footings and CMU walls, new concrete stairs and concrete slab. No change to use, occupancy or egress.
M00901215-I1
06/03/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 300 WEST 46TH STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01019085-I1
05/20/2026
Signed off — Alteration
Install new concrete strip footings and CMU walls, new concrete stairs and concrete slab. No change to use, occupancy or egress.
M00901215-S1
04/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/18/2026
Permit issued — Structural
M01162447-S1-ST
02/12/2026
Objection raised — Scope
02/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
02/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
SERDAR CEYLAN
02/06/2026
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
02/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
SERDAR CEYLAN
02/04/2026
Objection resolved — Addressed
02/01/2026
Objection raised — Scope
01/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
SERDAR CEYLAN
01/30/2026
Special inspection requirement — Sprinkler Systems
QIUFAN JIANG
01/28/2026
Violation issued (HPD, closed)
B
01/23/2026
Filed — Alteration
SPRINKLER WORK TYPE IS FILED IN CONJUNCTION WITH M01162447-I1 AS PER PLANS SUBMTTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01233666-P1
01/23/2026
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF AN EXISTING RESTAURANT IN THE CELLAR AND FIRST FLOOR AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01162447-P1
01/23/2026
Filed — Alteration
APPLICATION FILED FOR ADD NEW PLUMBING FIXTURES AND GAS EQUIPMENT IN A EXIST. RESTAURANT. PLUMBING WORK IS FILED IN CONJUNCTION WITH # M01162447
M01120110-P1
01/13/2026
Violation issued (HPD, open)
A
01/13/2026
Violation issued (HPD, open)
A
01/13/2026
Violation issued (HPD, open)
B
01/13/2026
Violation issued (HPD, open)
B
01/13/2026
Violation issued (HPD, open)
C
12/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/24/2025
Special inspection requirement — Sprinkler Systems
QIUFAN JIANG
12/11/2025
Permit issued — Structural
M00901215-S1-ST
12/11/2025
Objection resolved — Addressed
11/13/2025
Objection resolved — Addressed
10/30/2025
Objection resolved — Addressed
10/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIUFAN JIANG
10/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
QIUFAN JIANG
10/28/2025
Special inspection requirement — Final
SERDAR CEYLAN
10/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
SERDAR CEYLAN
10/28/2025
Special inspection requirement — Insulation placement and R values
SERDAR CEYLAN
10/28/2025
Special inspection requirement — Masonry
QIUFAN JIANG
09/27/2025
Permit issued — Construction Fence
M01019085-I1-FN
09/12/2025
Permit issued — Sprinklers
M01233666-I1-EW-SP
09/09/2025
Permit issued — Construction Fence
M01019085-I1-FN
09/09/2025
Permit issued — General Construction
M00901215-I1-GC
09/04/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/28/2025
Permit issued — Mechanical Systems
M01206637-I1-MS
08/12/2025
Objection resolved — Addressed
08/05/2025
Violation issued (ECB, closed)
Construction
08/01/2025
Objection resolved — Addressed
08/01/2025
Objection resolved — Addressed
07/24/2025
Objection raised — Admin
07/23/2025
Objection raised — Inspections
07/23/2025
Objection raised — Scope
07/23/2025
Objection raised — Fire_Protection
07/23/2025
Objection raised — Fire_Protection
07/23/2025
Objection raised — Admin
07/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/08/2025
Filed — Alteration
SPRINKLER WORK TYPE IS FILED IN CONJUNCTION WITH M01162447-I1 AS PER PLANS SUBMTTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01233666-I1
07/07/2025
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF AN EXISTING RESTAURANT IN THE CELLAR AND FIRST FLOOR AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01162447-S1
07/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
SERDAR CEYLAN
07/06/2025
Special inspection requirement — Structural Cold-Formed Steel
QIUFAN JIANG
07/03/2025
Special inspection requirement — Structural Steel - Details
QIUFAN JIANG
Latest 60 of 199 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedAMC Construction Desi02/18/2026
DOB NOWStructuralSigned-offErin Construction & Development12/11/2025
DOB NOWConstruction FenceSigned-offErin Construction & Development09/27/2025
DOB NOWSprinklersSigned-offOrbit Sprinkler09/12/2025
DOB NOWConstruction FenceSigned-offErin Construction & Development09/09/2025
DOB NOWGeneral ConstructionSigned-offErin Construction & Development09/09/2025
DOB NOWMechanical SystemsSigned-offPrestigious Maintenance I08/28/2025
DOB NOWPlumbingPermit IssuedOrbit Plumbing & Heating06/03/2025
DOB NOWGeneral ConstructionPermit IssuedAMC Construction Desi04/02/2025
DOB NOWGeneral ConstructionSigned-offErin Construction & Development09/04/2024
DOB NOWConstruction FenceSigned-offErin Construction & Development09/04/2024
DOB NOWStructuralSigned-offErin Construction & Development09/04/2024
DOB NOWStructuralSigned-offErin Construction & Development05/28/2024
DOB NOWConstruction FenceSigned-offErin Construction & Development04/18/2024
DOB NOWMechanical SystemsPermit IssuedFazio Construction Group09/12/2023
DOB NOWGeneral ConstructionSigned-offErin Construction & Development09/05/2023
DOB NOWSupported ScaffoldSigned-offIntersystems Installation S&S08/14/2023
DOB NOWSidewalk ShedSigned-offIntersystems Installation S&S08/11/2023
DOB NOWPlumbingSigned-offSkinner Plumbing & Heating06/23/2021
DOB NOWGeneral ConstructionSigned-offFazio Construction Group06/14/2021
BISPLISSUEDP.S.I. Mechanical12/07/2021
BISSPISSUEDI.M.P. Plumbing & Heating01/14/2020
BISPLISSUEDP.S.I. Mechanical06/04/2019
BISPLISSUEDI.M.P. Plumbing & Heating12/12/2018
BISSPISSUEDI.M.P. Plumbing & Heating02/09/2018
BISPLISSUEDP.S.I. Mechanical01/16/2018
BISPLISSUEDAdvantage Plumbing & Amp; Mechanical08/17/2017
BISPLISSUEDAdvantage Plumbing & Amp; Mechanical05/12/2017
BISMHISSUEDJ.A. Lee Electric02/22/2017
BISSPISSUEDUniversal Fire Sprinkler02/22/2017
BISOTISSUEDRC3 Electric01/12/2017
BISOTISSUEDRC3 Electric01/04/2017
BISOTISSUEDRC3 Electric01/04/2017
BISOTISSUEDRC3 Electric07/21/2016
BISOTISSUEDRC3 Electric07/21/2016
BISOTISSUEDRC3 Electric07/21/2016
BISPLISSUEDMarco Polo Plumbing & Heating04/13/2016
BISOTISSUEDBig Bear Custom Builders04/08/2016
BISPLISSUEDAdvantage Plumbing & Amp; Mechanical03/23/2016
BISSPISSUEDUniversal Fire Sprinkler02/26/2016
+ 30 more permits on file
2 projects · most recent 04/16/2025
Others Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/16/2025Signed-offPrestigious Maintenance IOthers
Other
Econ-Air 5412 ESX-2-PSP-F 1,220 CFM · Kitchen Exhaust ×2
07/11/2023Permit IssuedFazio Construction GroupAir Conditioning Systems
Cooling
Mitsubishi Electric TPKFYP030KM142A 30,000 BTU · Vrf Indoor ×1
TUMYP0601AK43 60,000 BTU · Vrf Outdoor ×1
Trane TPKFYP030KM142A 30,000 BTU · Vrf Indoor ×1
1 project · most recent 01/23/2026
FiledStatusContractorScope
01/23/2026Signed-offOrbit Sprinkler54 heads
2 projects · most recent 01/23/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/23/2026Permit IssuedOrbit Plumbing & HeatingGas, Water/Sanitary
01/23/2026———
4 projects · most recent 06/17/2025
General Wiring
FiledStatusContractorScope
06/17/2025Permit IssuedPK ElectricGeneral Wiring
05/07/2025Permit IssuedGMJ ElectricGeneral Wiring
08/15/2023CompleteAUR0RA Electrical Contg—
12/12/2020Permit IssuedHigh Quality Electric of—
2 projects · most recent 01/23/2026
Steel Concrete Masonry
FiledStatusContractorScope
01/23/2026Permit IssuedAMC Construction and DesiSteel
11/19/2024Signed-offErin Construction & DevelopmentConcrete, Masonry
1 project · most recent 04/05/2024
Fence
FiledStatusContractorScope
04/05/2024Signed-offErin Construction & DevelopmentFence
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/04/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/11/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/23/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/23/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/28/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
02/06/2026HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
02/06/2026Tenant Protection Plan ComplianceSERDAR CEYLANspecial
02/06/2026Energy Code Compliance InspectionsSERDAR CEYLANprogress
02/06/2026HVAC-R and service water heating equipmentSERDAR CEYLANenergy_progress
01/30/2026Tenant Protection Plan ComplianceSERDAR CEYLANspecial
01/30/2026Sprinkler SystemsQIUFAN JIANGspecial
12/24/2025Tenant Protection Plan Compliance—special
12/24/2025Sprinkler SystemsQIUFAN JIANGspecial
10/29/2025Tenant Protection Plan Compliance—special
10/28/2025Fire-Resistant Penetrations and JointsQIUFAN JIANGspecial
10/28/2025Structural Stability – Alterations of existing buildingsQIUFAN JIANGspecial
10/28/2025FinalSERDAR CEYLANprogress
10/28/2025HVAC-R and service water heating equipmentSERDAR CEYLANenergy_progress
10/28/2025Insulation placement and R valuesSERDAR CEYLANenergy_progress
10/28/2025MasonryQIUFAN JIANGspecial
07/07/2025Tenant Protection Plan ComplianceSERDAR CEYLANspecial
07/06/2025Structural Cold-Formed SteelQIUFAN JIANGspecial
07/03/2025Structural Steel - DetailsQIUFAN JIANGspecial
07/03/2025Structural Stability – Alterations of existing buildingsQIUFAN JIANGspecial
07/03/2025Structural Steel - High Strength BoltingQIUFAN JIANGspecial
07/03/2025Structural Steel - WeldingQIUFAN JIANGspecial
07/02/2025FinalQIUFAN JIANGprogress
04/15/2025Tenant Protection Plan ComplianceSERDAR CEYLANspecial
04/11/2025HVAC-R and service water heating system controlsSERDAR CEYLANenergy_progress
04/11/2025HVAC-R and service water heating equipmentSERDAR CEYLANenergy_progress
Latest 25 of 46.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
All'antico VinaioRestaurant / Food ServiceCellar, Floor 1, Roof
Project M00893207 Alteration · Permit Entire · 07/11/2023
Antico Vinaio Sandwich ShopRestaurant / Food ServiceCellar, Floor 1
Project M00532703 Alteration · LOC Issued · 06/15/2021
Project M00524754 Alteration · LOC Issued · 05/25/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 620 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
09/03/2026M00524754-I1Request digital key ↗
09/03/2026M00532703-I1Request digital key ↗
08/30/2026M00893207-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits126
▸BISPLAN / WORK APPROVAL APPLICATION77
11/13/2025123777788Open ↗
08/06/2024101306249Open ↗
06/18/2024101306249Open ↗
Showing 3 of 77 on file for this type
▸BISWORK PERMIT APPLICATION47
12/13/2018123431937Open ↗
03/08/2018121636998Open ↗
01/16/2018122122666Open ↗
Showing 3 of 47 on file for this type
▸BISPLACE OF ASSEMBLY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications124
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION58
07/01/2019123777788Open ↗
07/01/2019123777788Open ↗
11/15/2018121636998Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/30/2026M00893207-I1Open ↗
08/25/2026M01140495-I1Open ↗
08/25/2026M00901215-S1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/02/2026M01120110-I1Open ↗
09/02/2026M01120110-I1Open ↗
09/01/2026M00524754-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026M01233666-I1Open ↗
09/23/2026M01233666-I1Open ↗
09/02/2026M01120110-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
11/15/2018121636998Open ↗
11/14/2018121636998Open ↗
Showing 2 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISProfessional and Owner Certification (POC3)1
11/15/2018121636998Open ↗
▸Trade Schedules & Equipment37
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE17
07/01/2019123777788Open ↗
03/14/2019122122666Open ↗
11/15/2018121636998Open ↗
Showing 3 of 17 on file for this type
▸BISSCHEDULE B - PLUMBING11
07/07/2020121636998Open ↗
Showing 1 of 11 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
07/01/2019123777788Open ↗
▸Safety & Tenant Protection40
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist18
08/19/2026M01233666-I1Open ↗
08/19/2026M01120110-I1Open ↗
08/13/2026M00901215-P1Open ↗
Showing 3 of 18 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON10
07/01/2019123777788Open ↗
Showing 1 of 10 on file for this type
▸BISTenant Protection Plan and Notes5
05/04/2018123431937Open ↗
07/14/2016122832015Open ↗
07/14/2016122832006Open ↗
Showing 3 of 5 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST3
07/31/2019101306249Open ↗
Showing 1 of 3 on file for this type
▸BISHPD-2 - Clinton Special district Anti-Harassment Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
05/04/2018123431937Open ↗
▸BISCLINTON DISTRICT: ANTI-HARASSMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos40
▸BISASBESTOS: CERTIFICATION (DEP ACP5)19
05/04/2018123431937Open ↗
07/14/2016122832015Open ↗
07/14/2016122832006Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/30/2026M00893207-I1Open ↗
08/25/2026M01140495-I1Open ↗
08/25/2026M00901215-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Energy Compliance47
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS27
07/01/2019123777788Open ↗
05/10/2018122122675Open ↗
05/04/2018123431937Open ↗
Showing 3 of 27 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS11
05/10/2018122122675Open ↗
04/06/2018140480441Open ↗
01/30/2018110177166Open ↗
Showing 3 of 11 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/30/2023101306249Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00524754-I1Open ↗
▸Inspections & Test Reports10
▸BISHYDRAULIC FLOW CALCULATIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/30/2023101306249Open ↗
Showing 1 of 2 on file for this type
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs69
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST28
04/27/2020101306249Open ↗
02/12/2020101306249Open ↗
11/20/2019101306249Open ↗
Showing 3 of 28 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE14
06/18/2024101306249Open ↗
06/17/2024101306249Open ↗
04/24/2024101306249Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
03/08/2018121636998Open ↗
08/28/2017110177166Open ↗
06/15/2017122272539Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION4
06/15/2017122272539Open ↗
Showing 1 of 4 on file for this type
▸BISSUPERSEDING LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Cost, Insurance & Ownership41
▸BISCOST AFFIDAVIT40
07/01/2019123777788Open ↗
07/01/2019123777788Open ↗
05/04/2018123431937Open ↗
Showing 3 of 40 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms66
▸BISBOROUGH INTAKE FORM23
04/27/2020101306249Open ↗
02/12/2020101306249Open ↗
11/20/2019101306249Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING COVER SHEET22
07/01/2019123777788Open ↗
07/01/2019123777788Open ↗
05/04/2018123431937Open ↗
Showing 3 of 22 on file for this type
▸BISADDITIONAL INFORMATION19
09/12/2024101306249Open ↗
10/10/2023101306249Open ↗
09/28/2023101306249Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type