← Back
BuildNYC
Public elementary, junior or senior high
Brooklyn High School for Leadership and Community Service
300 WILLOUGHBY AVENUE · BIN 3055165
💬 Discuss this project
1968Year Built
3Stories
W1Building Class
R6AZoning
328,860 sfGross Floor Area
1Units
LL97 Covered5 Active Violations 0 unresolved · 5 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Parks and Recreation · 137,000 sf lot · 2.4 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 3P.S. 117 J. Keld / Briarwood School3p · 1 filing · 20 docs
Floor 2P.S. 117 J. Keld / Briarwood School3p · 1 filing · 20 docs
Floor 1P.S. 117 J. Keld / Briarwood School3p · 1 filing · 20 docs
BasementP.S. 117 J. Keld / Briarwood School2p · 1 filing · 20 docs
Sub-BasementP.S. 117 J. Keld / Briarwood School8p · 1 filing · 20 docs
Site & exteriorP.S. 117 J. Keld / Briarwood School5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority6604/09/2026
NYC Department of Education803/22/2026
NY School Authority103/21/2026
NY School103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYC School Construction Authority310/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC School Construction Authority303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Farragut Builders IIGeneral Contractor604/09/2026
A & S ElectricElectrical503/21/2026
Varsity Plumbing and HeatingPlumbing307/08/2026
Ajit One Mechanical & Gen ContractingFire Protection207/08/2026
J.M.J. ElectricElectrical103/21/2026
M & W ElectricElectrical103/21/2026
Charan Electrical Enterp'sElectrical103/22/2026
E.N.E.L. ElectricalElectrical103/21/2026
Bestco General Electric MaintenanceElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Municipal Testing Laborat230410/24/2022
Building Lifecycle
All (89)Filed (3)Permit Issued (9)Signed Off (3)Violation (60)Inspection (3)Objection (6)Special Inspection (5)
05/26/2026
Violation issued (ECB, open)
Construction
05/26/2026
Violation issued (ECB, open)
Construction
05/26/2026
Violation issued (ECB, open)
Construction
05/26/2026
Violation issued (ECB, open)
Construction
03/03/2026
Signed off — Alteration
Installation of new double check valve for sprinkler system. and replacement of 75 Sprinkler heads and replace deteriorated sprinkler piping. as per plans
B08001995-I1
03/03/2026
Signed off — Alteration
Installation of new double check valve for sprinkler system. and replacement of 75 Sprinkler heads and replace deteriorated sprinkler piping. as per plans
B08001995-S3
03/03/2026
Signed off — Alteration
Installation of new double check valve for sprinkler system. and replacement of 75 Sprinkler heads and replace deteriorated sprinkler piping. as per plans
B08001995-S1
02/27/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/09/2026
Violation issued (FDNY_ORDER, closed)
01/09/2026
Violation issued (FDNY_ORDER, closed)
01/09/2026
Violation issued (FDNY_ORDER, closed)
01/09/2026
Violation issued (FDNY_ORDER, closed)
01/09/2026
Violation issued (FDNY_ORDER, closed)
01/09/2026
Violation issued (FDNY_ORDER, closed)
01/09/2026
Violation issued (FDNY_ORDER, closed)
01/09/2026
Violation issued (FDNY_ORDER, closed)
01/09/2026
Violation issued (FDNY_ORDER, closed)
01/09/2026
Violation issued (FDNY_ORDER, closed)
01/09/2026
Violation issued (FDNY_ORDER, closed)
01/09/2026
Violation issued (FDNY_ORDER, closed)
01/09/2026
Violation issued (FDNY_ORDER, closed)
01/09/2026
Violation issued (FDNY_ORDER, closed)
01/09/2026
Violation issued (FDNY_ORDER, closed)
12/22/2025
Violation issued (FDNY_ORDER, closed)
12/22/2025
Violation issued (FDNY_ORDER, closed)
12/22/2025
Violation issued (FDNY_ORDER, closed)
09/23/2025
Permit issued — Plumbing
B08001995-I1-PL
05/23/2025
Permit issued — General Construction
B08001995-S3-GC
05/22/2025
Violation issued (ECB, closed)
Construction
05/22/2025
Violation issued (ECB, open)
Construction
05/05/2025
Violation issued (ECB, closed)
Construction
04/30/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/06/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
02/24/2025
Permit issued — Sprinklers
B08001995-S1-EW-SP
10/15/2024
Permit issued — General Construction
B08001995-S3-GC
09/20/2024
Permit issued — Plumbing
B08001995-I1-PL
07/09/2024
Violation issued (FDNY_ORDER, closed)
07/09/2024
Violation issued (FDNY_ORDER, closed)
07/09/2024
Violation issued (FDNY_ORDER, closed)
07/09/2024
Violation issued (FDNY_ORDER, closed)
07/09/2024
Violation issued (FDNY_ORDER, closed)
07/09/2024
Violation issued (FDNY_ORDER, closed)
07/09/2024
Violation issued (FDNY_ORDER, closed)
07/09/2024
Violation issued (FDNY_ORDER, closed)
07/09/2024
Violation issued (FDNY_ORDER, closed)
07/09/2024
Violation issued (FDNY_ORDER, closed)
03/29/2024
Permit issued — General Construction
B08001995-S3-GC
10/30/2023
Permit issued — Sprinklers
B08001995-S1-EW-SP
09/29/2023
Permit issued — General Construction
B08001995-S3-GC
09/21/2023
Permit issued — Plumbing
B08001995-I1-PL
03/07/2023
Violation issued (ECB, closed)
Construction
12/14/2022
Violation issued (FDNY_ORDER, closed)
11/10/2022
Special inspection requirement — Post-installed Anchors
STEPHEN LATUS
10/26/2022
Objection raised — Other
10/26/2022
Objection resolved — Addressed
10/26/2022
Objection raised — Other
10/26/2022
Objection resolved — Addressed
10/24/2022
Filed — Alteration
Installation of new double check valve for sprinkler system. and replacement of 75 Sprinkler heads and replace deteriorated sprinkler piping. as per plans
B08001995-S1
10/21/2022
Filed — Alteration
Installation of new double check valve for sprinkler system. and replacement of 75 Sprinkler heads and replace deteriorated sprinkler piping. as per plans
B08001995-S3
10/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEPHEN LATUS
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offVarsity Plumbing and Heating09/23/2025
DOB NOWGeneral ConstructionSigned-offFarragut Builders II05/23/2025
DOB NOWSprinklersSigned-offHar JI Plumbing & Heating02/24/2025
DOB NOWGeneral ConstructionSigned-offFarragut Builders II10/15/2024
DOB NOWPlumbingSigned-offVarsity Plumbing and Heating09/20/2024
DOB NOWGeneral ConstructionSigned-offFarragut Builders II03/29/2024
DOB NOWSprinklersSigned-offHar JI Plumbing & Heating10/30/2023
DOB NOWGeneral ConstructionSigned-offFarragut Builders II09/29/2023
DOB NOWPlumbingSigned-offVarsity Plumbing and Heating09/21/2023
BISPLISSUEDC James Plumbing & Heating06/30/2020
BISPLISSUEDForsythe P&H03/09/2018
BISOTISSUEDKG Construction Services02/28/2018
BISOTISSUEDKG Construction Services02/28/2018
BISMHISSUEDCole Mechanical05/08/2017
BISOTISSUEDKG Construction Services05/05/2017
BISOTISSUEDKG Construction Services05/05/2017
BISPLISSUEDForsythe P&H03/16/2017
BISEQISSUEDRoma Scaffolding02/08/2017
BISEQISSUEDKG Construction Services01/25/2017
BISEQISSUEDRoma Scaffolding01/17/2017
BISMHISSUEDD & K Construction Co11/30/2016
BISOTISSUEDKG Construction Services05/17/2016
BISOTISSUEDKG Construction Services05/17/2016
BISOTISSUEDKG Construction Services03/07/2016
BISOTISSUEDKG Construction Services03/07/2016
BISPLISSUEDForsythe P&H03/07/2016
BISEQISSUEDKG Construction Services03/07/2016
BISMHISSUEDVolmar Construction02/19/2016
BISEQISSUEDRoma Scaffolding02/19/2016
BISOTISSUEDVolmar Construction02/19/2016
BISOTISSUEDVolmar Construction02/19/2016
BISMHISSUEDD & K Construction Co02/09/2016
BISEQISSUEDKG Construction Services01/22/2016
BISEQISSUEDRoma Scaffolding01/19/2016
BISMHISSUEDVolmar Construction01/23/2015
BISOTISSUEDVolmar Construction01/23/2015
BISOTISSUEDVolmar Construction01/23/2015
BISPLISSUEDAdamjohn & Sons12/12/2014
BISPLISSUEDAdamjohn & Sons09/08/2014
BISMHISSUEDVolmar Construction08/01/2014
+ 19 more permits on file
13 projects · most recent 10/10/2025
General Wiring
FiledStatusContractorScope
10/10/2025CompleteGemini Electric Co—
07/29/2024CompleteAce Electrical ConstructionGeneral Wiring
05/15/2024Permit IssuedGemini Electric CoGeneral Wiring
10/31/2023CompleteUrban ElectricalGeneral Wiring
06/09/2021CompleteCharan Electrical Enterp'sGeneral Wiring
04/23/2021CompleteAbm Electric—
02/10/2021Permit IssuedRM Electric CoGeneral Wiring
10/26/2020CompleteCharan Electrical Enterp's—
03/17/2020CompleteG & F.a.st ElectricGeneral Wiring
03/16/2020CompleteG & F.a.st ElectricGeneral Wiring
11/01/2019CompleteLaredo Electric—
05/25/2018CompleteCharan Electrical Enterp's—
01/19/2018CompleteRodel Electrical ContractorsGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/27/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/30/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/06/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/10/2022Post-installed AnchorsSTEPHEN LATUSspecial
10/20/2022Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
10/14/2022Sprinkler SystemsSTEPHEN LATUSspecial
09/12/2022Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
09/12/2022Post-installed AnchorsSTEPHEN LATUSspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 117 J. Keld / Briarwood SchoolEducationSub-basement, Floors 1–3
Project B08001995 Alteration · LOC Issued · 09/13/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/28/2026B08001995-I1Request digital key ↗
08/28/2026B08001995-S1Request digital key ↗
08/28/2026B08001995-S3Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026B08001995-S1Open ↗
08/28/2026B08001995-I1Open ↗
08/28/2026B08001995-S3Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B08001995-I1Open ↗
08/27/2026B08001995-S1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/28/2026B08001995-I1Open ↗
08/28/2026B08001995-S3Open ↗
08/28/2026B08001995-S1Open ↗
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026B08001995-I1Open ↗
08/13/2026B08001995-S1Open ↗
08/13/2026B08001995-S3Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
08/13/2026B08001995-I1Open ↗
08/13/2026B08001995-S1Open ↗
08/13/2026B08001995-S3Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/13/2026B08001995-I1Open ↗
08/13/2026B08001995-S1Open ↗
08/13/2026B08001995-S3Open ↗
▸DOB NOWDEP Variance (V5) letter3
08/13/2026B08001995-S3Open ↗
08/13/2026B08001995-I1Open ↗
08/13/2026B08001995-S1Open ↗
▸Other Documents6
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal3
08/13/2026B08001995-I1Open ↗
08/13/2026B08001995-S1Open ↗
08/13/2026B08001995-S3Open ↗
▸DOB NOWNYCSCA Exhibit 23
08/13/2026B08001995-I1Open ↗
08/13/2026B08001995-S1Open ↗
08/13/2026B08001995-S3Open ↗