← Back
BuildNYC
Elevator cooperative
Adee Towers
3000 BRONX PARK EAST · BIN 2054716
💬 Discuss this project
1961Year Built
20Stories
D4Building Class
R7-1Zoning
352,360 sfGross Floor Area
297Units
LL97 CoveredRent Stabilized41 Active Violations 3 likely answered 1 old, status unconfirmed ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: Adee Towers · 83,700 sf lot · 4.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofNew Bedford Management1p · 1 filing · 2 docs
CellarNew Bedford Management1p · 1 filing · 5 docs
Site & exteriorNew Bedford Management9p · 3 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Adee Tower Apts1803/22/2026
3330 BX PK E Towers303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MG Engineering112/10/2020
Dooling & Company Architects204/15/2019
KZ Engineering107/17/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants103/21/2026
AE Design Solution403/21/2026
Spring Scaffolding203/21/2026
Riggining Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold907/08/2026
Xinos ConstructionGeneral Contractor303/21/2026
Skyline RestorationGeneral Contractor303/21/2026
CC Controlled PlumbingPlumbing203/21/2026
Skyline RestorationScaffold207/08/2026
5 Boros PlumbingPlumbing103/21/2026
247 ElectricalElectrical103/21/2026
Alpine Construction ServicesGeneral Contractor103/21/2026
Colgate Scaffolding EquipmentGeneral Contractor103/21/2026
5 Boro's PlumbingPlumbing102/07/2017
Dosch-KingGeneral Contractor108/25/1997
Prestige Air ControlGeneral Contractor203/12/2019
Spring ScaffoldingGeneral Contractor210/11/2018
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Richard H. Balser Engineering3028112/10/2020
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
03/30/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT…
HPD violation · open
03/30/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT…
HPD violation · open
03/30/2026
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 12E,…
HPD violation · open
02/05/2026
VC15: failed to provide and/or maintain required fire- rated construction of fire barriers and/or horizontal assemblies
FDNY_NOV violation · closed
236 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System03/14/2024
DOB NOWBoiler EquipmentSigned-offC C Controlled Combustion01/06/2021
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding03/17/2020
DOB NOWSidewalk ShedSigned-offSpring Scaffolding01/06/2020
DOB NOWSupported ScaffoldPermit IssuedSkyline Restoration09/06/2019
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding04/16/2019
DOB NOWSidewalk ShedSigned-offSpring Scaffolding12/27/2018
DOB NOWSupported ScaffoldPermit IssuedSkyline Restoration08/31/2018
DOB NOWSidewalk ShedSigned-offSpring Scaffolding07/17/2018
BISOTISSUEDSkyline Restoration03/01/2021
BISPLISSUEDCC Controlled Plumbing02/02/2021
BISBLISSUEDC C Controlled Combustion07/28/2020
BISOTISSUEDSkyline Restoration07/21/2020
BISOTISSUEDSkyline Restoration02/28/2020
BISBLISSUEDC C Controlled Combustion07/16/2019
BISBLISSUEDC C Controlled Combustion03/18/2019
BISPLISSUEDCC Controlled Plumbing03/18/2019
BISMHISSUEDPrestige Air Control03/12/2019
BISOTISSUEDSkyline Restoration02/28/2019
BISMHISSUEDPrestige Air Control12/07/2018
BISEQISSUEDSpring Scaffolding10/11/2018
BISOTISSUEDSkyline Restoration09/10/2018
BISEQISSUEDSpring Scaffolding10/10/2017
BISPLISSUEDZone Plumbing & Heating02/07/2017
BISOTISSUEDAlpine Construction Service02/02/2017
BISOTISSUEDXinos Construction03/15/2005
BISEQISSUEDXinos Construction03/09/2005
BISOTISSUEDXinos Construction05/19/2004
BISEQISSUEDXinos Construction04/30/2004
BISEQISSUEDColgate Scaffolding & Equipment01/30/2004
BISEQISSUEDXinos Construction01/27/2004
BISEQISSUEDXinos Construction09/15/2003
BISOTISSUEDXinos Construction08/28/2003
BISFSISSUEDC C Controlled Combustion08/25/2003
BISEQRE-ISSUEDColgate Scaffolding & Equipment12/19/2002
BISOTISSUEDDosch-King08/25/1997
BISEQISSUEDColgate Scaffolding01/22/1992
10 projects · most recent 06/01/2021
General Wiring Boiler Controls
FiledStatusContractorScope
06/01/2021CompleteJubilee Electrical ServiceGeneral Wiring
01/06/2021CompleteResponse ElectricGeneral Wiring
09/08/2020CompleteResponse ElectricGeneral Wiring
11/13/2019CancelledResponse ElectricGeneral Wiring
10/15/2019CompleteResponse ElectricGeneral Wiring
08/09/2019CompleteResponse ElectricGeneral Wiring
07/01/2019Permit IssuedKraft ElectricBoiler Controls
12/11/2018Complete247 Electrical—
09/18/2018CompleteJte Electrical Services—
07/02/2018CompleteTop Shelf Electric—
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
11/02/2020Fuel-Oil Storage and Fuel-Oil Piping SystemsBalser Richardspecial
91 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account